Agriculture AI agent · EUDR & export access
EUDR & Export Market-Access AI Agent
Assemble the plot geolocation, production dates and legality evidence your EU buyer needs before it declares, mark what the pack still lacks, and hold every consignment for your export lead.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Export sign-off
- Pre-declaration
- After launch
- Agent Care
What this agent does
Assembles the pack, not the declaration
In
- 01
A load is booked, and the agent pulls the plots, deliveries and supplier records behind it.
- 02
A buyer asks for origin, and coordinates are normalised to six decimals from the source projection.
Reason
- 03
A load blends several farms, and the agent works back through the blending records for the plots behind it.
- 04
A plot crosses four hectares, and the pack is marked for a polygon rather than a point.
- 05
A cattle lot arrives, and premises are traced back towards the birthplace, as far as records reach.
Decide
- 06
A US-origin load takes simplified diligence under the May 2025 list — geolocation and evidence stand.
- 07
A legality document is filed, and it is read against the legal status of the area of production.
Out
- 08
A pack is assembled, and it is routed with its reference numbers to the named export lead.
- 09
Execute write actions only inside the approval boundaries agreed during implementation.
Product statement
The agent assembles the pack; from 30 December 2026 the EU operator declares, and your export lead decides what ships.
Example workflow
One consignment, plot to pack
- 1Consignment bookedContract, delivery tickets, supplier records or origin declarations
- 2Origin assembledPlot coordinates, production dates, legality documents and the chain that links them
- 3Pack draftedGeolocation set, evidence index, open gaps and confidence
- 4Controls appliedPolygon and six-decimal checks, the 31 December 2020 cut-off, blend coverage and confidence threshold
No human action required
Stages 1 to 4 run unaided, and nothing is declared at any of them — the agent is assembling, and the export lead's lane opens at the confidence gate.
Goes to the export lead to release.
Adds a sourcing-team read first.
Export-lead release
The pack is held with its plots, its open gaps and the confidence.
Release · Amend · Send to sourcing review
Released — sent to the buyer
- 6Origin systems updatedOnly where write access and approval policy allow it
- 7Outcome evaluatedGap closure, buyer queries, rejected plots and post-shipment corrections
Amendments
Every amendment made at release is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Submitting a due diligence statement in the EU system.
- Deciding that a plot is deforestation-free.
- Attesting that production was legal where it happened.
- Declaring which plots contributed to a consignment.
Automation boundary
Agent acts unaided
- ✓Assemble plot geolocation, dates and evidence for a load for the named owner.
- ✓Carry each plot forward with the record it came from.
- ✓Apply the thresholds and formats the pack has to meet.
- ✓Mark the gaps the export lead should weigh, and hold the pack.
Any write happens inside the boundaries agreed at implementation, never ahead of release.
- Concluding that a cattle animal's origin is traced.
- Accepting another party's due diligence as sufficient.
- Signing an origin declaration to a buyer.
- Changes to sourcing, geolocation or release rules.
Example output
One consignment, annotated
Everything the agent assembles is attached to the record it was drawn from.
EUDR pack output · single consignment
Illustrative example- Consignment
- Soya, bulk vessel
- Contributing plot
- Contributing plot mapped from the delivery ticket
- Mapped area
- 6.4 ha
- Geolocation held
- Polygon on file
- Confidence
- 91%
- Legality evidence
- Land title and harvest right
As received
Taken from the delivery ticket and the plot record on file — nothing on this side is drawn by the agent.
Evidence gathered
- Polygon, six decimals
- Harvest date on record
- Land-title extract
Why this plot
This plot fed the load — the origin line the export lead weighs and signs.
What the score decides
Below the configured threshold the pack picks up a sourcing read first.
Action
ReleaseAmendSend to sourcing reviewValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every consignment
From the delivery record
Assemble from the record
Draw on the plot records on file and the pack rules as Regulation (EU) 2025/2650 left them.
Your buyer carries the duty
Routine loads arrive with their plots and evidence already gathered.
Send review to the thin origin
Open gaps and low-confidence packs are marked, so the export lead's read starts where the origin is thin.
Build an evidence trail
The plot, the evidence gathered on it and the buyer who declared stay on the consignment.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Origin and grain systems
- Bushel
- AgriDigital
- Cultura
- Agris
- Greenstone
Traceability platforms
- Sourcemap
- TrusTrace
- Trase
- Satelligence
ERP and trade
- SAP
- Dynamics
- Eka
- Agiblocks CTRM
Agent
EUDR pack assembly
- Reads the origin
- Assembles the pack
- Holds for release
Documents and customs
- Bills of lading
- certs
- Export and customs filings
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six layers between the model and the pack
The layers close inward, six deep. Whatever clears them all is set out in the map beneath this one.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether a pack may stand
- L3
- Puts the release in the lead's hands
- L4 – L5
- Keep the plot and the evidence behind it
- L6
- Narrows to plot collection when signals degrade
How Nestack evaluates it
Evaluate the whole assembly — not only the finished pack.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the pack the buyer receives
- E1Final-output evaluationDid every plot in the pack trace back to a delivery record?
- E2Step-level evaluationDid the agent use the right thresholds, formats and country classification?
- E3Tool evaluationDid it read and write the correct consignment and the correct field?
- E4Confidence calibrationDo low-confidence packs actually attract more amendments?
- E5Slice evaluationHow does performance change across specific commodities?
- E6Business outcomeHow many packs needed an amendment, or a correction after the load had shipped?
Floor — the market access the exporter answers for
Failure modes
Where each failure originates in the agent
Seven failure modes, placed at the stage each one originates.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- EU-03
Superseded plot record
Boundary read from an out-of-date farm record.
Stage gathers
Plot records, delivery tickets, evidence and rules
02 · Reasoning
2 modes
- EU-04
Point used above threshold
A plot over four hectares is carried as a point.
- EU-06
Dominant-supplier blend
A blended load carries only the largest supplier's plots.
Stage proposes
Geolocation set, evidence index and confidence
03 · Tool / write
2 modes
- EU-02
Low risk taken as exempt
Simplified diligence read as needing no geolocation.
- EU-05
Over-declared plot set
Plots that did not contribute are declared anyway.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- EU-01
Coordinate precision lost
Coordinates stored below six decimal places.
Stage returns
The pack the export lead releases to the buyer
05 · Change / Version
1 mode
- EU-07
Silent rule regression
A rule or list change alters what the pack accepts.
Stage tracks
Model, prompt, thresholds and country lists
- Sev-1 · pack released outside the boundary
- Sev-2 · a wrong plot reaches the buyer
- Sev-3 · source degrades, pack routes to review
Affected slices
Whole-book coverage can hide one commodity
A shipment-level plot-coverage rate can look acceptable while a small number of commodities carry most of the gaps. Nestack reports the open-gap rate by slice, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Cattle traced to birth premises | 9.3% | 3.8× | Review | |
| Blended bulk consignments | 7.1% | 2.9× | Review | |
| Smallholder-sourced lots | 3.8% | 1.6× | Watch | |
| Single-farm soya lots | 1.1% | 0.4× | Normal |
Bar: open-gap-rate lift vs. single-farm-soya baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
The loop shuts on a test, not an explanation
A cycle is done when the unmapped plot has become a case the next release must pass. That is what the next pack is measured against.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Open-gap rate rises in a commodity slice.
- 02
Diagnose
The plot nobody could put a boundary around is read back through its tickets until one cause is left.
- 03
Improve
Stamp the change with a version; the consignments behind it travel with the note.
- 04
Verify
The touched cases are rerun, and one failure is enough to stop the release.
- 05
Learn
It stays as a standing test, and the sourcing rules are rewritten alongside it.
Learn → Detect
The return edge. The next gap is caught against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, pack assembly, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Consignment-workflow discovery and origin boundary definition.Week 1
- 02Origin, grain and traceability assessment.Week 1, Week 2
- 03Geolocation, threshold, format and country-risk mapping.Week 1, Week 2
- 04Delivery-record ingestion and plot mapping.Week 2
- 05Pack assembly and evidence binding.Week 2, Week 3
- 06Confidence scoring and gap routing.Week 3
- 07Export-lead release workflow.Week 3, Week 4
- 08Origin and trade-system integration.Week 5
- 09Plot and traceability cases.Week 4, Week 5
- 10Guardrails and declaration controls.Week 4
- 11Consignment-trail instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne commodity, one origin | ProductionProduction origin systems | AdvancedMultiple commodities / origins |
|---|---|---|---|
| Introduced at Pilot | |||
| Assembly to your records and rules | ✓ | ✓ | ✓ |
| Export-lead release | ✓ | ✓ | ✓ |
| Plot-coverage baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by commodity | — | ✓ | ✓ |
| Release workflow in your systems | — | ✓ | ✓ |
| Approved write-back | — | ✓ | ✓ |
| Origin-system integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multi-origin sourcing rules | — | — | ✓ |
| Multi-stage export approvals | — | — | ✓ |
| High consignment volume | — | — | ✓ |
| Multi-origin traceability controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your delivery records and plot register
→Delivery-record ingestion and plot mapping
Week 102Representative shipped consignments
→Assembly baseline, evidence indexing and plot binding
Week 203Your buyers' pack format and contract terms
→Geolocation, threshold and format mapping
Week 104Access to relevant APIs, feeds or exports
→Origin, grain and traceability assessment, then integration setup
Week 205Consignments you would not want declared
→Origin cases and the evaluation suite
Week 406What no consignment may ship without
→Confidence scoring, gap routing, guardrails and release controls
Week 307A named export lead to release packs
→Export-lead release workflow, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Phases sit on the weeks they truly take, so the overlap in week 5 is real work, not slack.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Consignment discovery, rule mapping and the automation boundary
W2Origin integration and the assembly baseline
W3Pack assembly, confidence logic and release controls
W4Evaluation suite, plot and cut-off checks and failure-mode testing
W5Trade-system integration, pilot consignments and targeted corrections
W6One shipping season assembled under the export lead, then Agent Care handover
- Reading the band
- Each band covers only the weeks its work is named in. The week 5 overlap is real, not padding.
- At the end of W6
- The final checks clear on live consignments and monitoring moves to Agent Care.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Agriculture AI agent
Build an EUDR pack agent around your buyer's declaration.
Show us your delivery records, your plot register and who releases to the buyer. The statement, and the responsibility that comes with submitting it, stay with the EU operator.
- Typical delivery
- 4–6 weeks
- Deployment
- Your origin records
- Export-lead release
- Pre-declaration
- After launch
- Agent Care available
Nestack Agents · EUDR & export market access
AGT-AGR-14 · Agent Care available after launch
