Construction AI agent · Change control

Building Safety Change-Control AI Agent

A major change carried out before it is granted cannot be regularised, and on a higher-risk building in England the approval shields nothing. The agent assembles the record; the client signs it.

Typical delivery
4–6 weeks
Deployment
Your stack
Client signs
Per change
After launch
Agent Care

What this agent does

Drafts the record behind a change, not the answer to a question

In

  1. 01

    A design moves, and the agent opens a change record against the agreed documents the project holds.

  2. 02

    A change meets reg 26, and the agent drafts recordable, notifiable or major with the limb it relied on.

Reason

  1. 03

    An adviser is consulted, and the agent records the name, the occupation and a summary of the advice.

  2. 04

    A document is affected, and the agent lists it and checks the revised version exists before work starts.

  3. 05

    A compliance position is needed, and the agent drafts it for the person in responsible charge to settle.

Decide

  1. 06

    A notifiable change is drafted, and the agent holds the reg 20 notice unsent until the client signs it.

  2. 07

    A major change is drafted, and the agent stages the reg 21 application; reg 18 bars the work until granted.

Out

  1. 08

    A change closes, and the entry, the advice, the revisions and the signature stay against the project.

  2. 09

    Execute write actions only inside the approval boundaries agreed during implementation.

Product statement

The agent drafts and the client signs — and once a major change is carried out, no regularisation application may be made, so the work sits outside the approval.

Example workflow

One change, proposal to record

  1. 1Change proposedSite instruction, design revision, product substitution or dutyholder change
  2. 2Documents assembledThe agreed documents, the drawings they govern and the golden-thread revision each one sits at
  3. 3Category draftedRecordable, notifiable or major, the reg 26 limb relied on and confidence
  4. 4Controls appliedReg 19 element checks, consultation-record checks, document-impact checks and confidence threshold

No human action required

Stages 1 to 4 run unaided, and nothing is classified, notified or signed at any of them — the agent is drafting, and the client's lane opens at the confidence gate.

5DecisionBranches at the confidence threshold
High confidence

Goes to the named client.

Low confidence

Adds a principal designer read first.

Client decision

The change is held with its draft category, its consultation record and the confidence.

Adopt · Recategorise · Send to principal designer

Adopted — signed and released

  1. 6Log and golden thread updatedOnly where write access and approval policy allow it
  2. 7Outcome evaluatedRecategorisations, missing elements, information requests and changes reworked at completion

Recategorisations

Every recategorisation made in review is counted in the evaluation.

What should not run autonomously

Human approval stays in control

Outside the boundary — human approval required

8 items

  • Deciding the category a change falls into.
    • Signing the change record, notice or application.
    • Stating that the changed work complies.
    • Starting work before a major change is granted.
  • Automation boundary

    Agent acts unaided

    • ✓Propose the category against reg 26 and cite the limb relied on.
    • ✓Assemble the reg 19 elements, including who advised and what they advised.
    • ✓List the agreed documents affected and check a revised version exists.
    • ✓Flag what a change record is missing, and hold it for the client.

    Any write happens inside the boundaries agreed at implementation, never ahead of a signature.

    • Taking over the log the principal contractor maintains.
    • Signing a dutyholder compliance declaration.
    • Deciding that a safety occurrence is reportable.
  • Changes to category rules or approval thresholds.

Example output

One change, annotated

An RFI moves a question to its responder; this moves a change to the client who signs.

Change record · single controlled change

Illustrative example
Element
External wall build-up
Proposed change
Insulation replaced with a board of the same reaction-to-fire class
Agreed document
FEF rev C
Draft category
Notifiable — reg 26
Confidence
93%
Consequence
Notice before the change is carried out

As received

Taken from the agreed documents and the golden thread as they stand — nothing on this side is written by the agent.

What was read

  • Fire and emergency file
  • Approved wall build-up
  • Product classification

Why this category

The replacement is not of a lower class, so reg 26 puts it below a major change — the client settles it.

What the score decides

Below the configured threshold the change picks up a principal designer read before the client sees it.

Action

AdoptRecategoriseSend to principal designer

Value

Where AI adds value

The same four claims, placed at the point in the workflow where each one applies.

Where the value lands

Value 01 – 04

Every proposed change

From the agreed documents

03Recording

Draft against the approved set

Read the change against the agreed documents BSR approved, not against the latest drawing in the model.

01Approved path

The client signs each change

Routine recordable changes arrive already written up against reg 19.

02Human review

Send review to the ones that stop work

Notifiable and major drafts are marked, so the client's read starts where the prohibition bites.

04

Build an evidence trail

The change, the advice it drew on and the client who signed stay on the record.

Integrations

Typical integrations

Five system groups connect to the same agent. Which of them are in scope is decided in discovery.

  • Golden thread and agreed documents

    • Zutec
    • Operance
    • Asite
    • Autodesk ACC
  • Design and coordination

    • Autodesk Revit
    • Navisworks
    • Solibri
    • Bluebeam Revu
  • Project and change management

    • Procore
    • Aconex
    • Viewpoint
    • Fieldwire

Agent

Building safety change control

  • Reads the documents
  • Drafts the record
  • Holds for the client
  • Submission and handover

    • BSR online applications
    • Reg 38 handover pack
  • Observability & evaluation

    • OpenTelemetry
    • Langfuse
    • Supported monitoring/evaluation sources

Integration availability depends on the client's existing systems and API access.

Agent controls

Six rings between the model and the signature

Six rings read from the outside in. What clears the last of them is drawn in the map below.

L6 · Outermost — last line of defence

Inward → L1 · closest to the model

L6Rollback / safe modePull the agent back to drafting only when evaluation or production signals degrade.Roll back
L5Version monitoringTrack model, prompt, category-rule and reg 26 configuration changes.Track
L4TraceabilityRecord the documents read, the draft category, the advice and the signature.Record
L3Client review gateHold each record for the named client; it governs release, not whether the category is right.Gate
L2Policy guardrailsTest drafts against the reg 19 elements and the reg 26 limbs; a failure returns the draft.Restrict
L1Confidence thresholdsRoute low-confidence changes to a principal designer read first.Require review
Model coreDraft produced — category, affected documents, consultation record and confidence
L1 – L2
Test whether a draft may stand
L3
Puts the decision in the client's hands
L4 – L5
Keep the change and the advice behind it
L6
Holds the change at unrecorded when signals degrade

How Nestack evaluates it

Evaluate the change workflow — not only the finished record.

Coverage runs the whole depth of the workflow, and every layer is cut by slice.

Surface — the record the regulator reads

  1. E1Final-output evaluationDid the draft carry every element reg 19(2) prescribes?
  2. E2Step-level evaluationDid the agent read the agreed documents and the reg 26 limbs in force?
  3. E3Tool evaluationDid it read and write the correct project and the correct log?
  4. E4Confidence calibrationDo low-confidence changes actually attract more recategorisations?
  5. E5Slice evaluationHow does performance change across specific change types?
  6. E6Business outcomeHow many changes were recategorised, or reworked at completion?

Floor — the record the client signs and defends

Failure modes

Where each failure originates in the agent

Seven failure modes, each placed at the stage where it starts.

Agent lifecycle

Direction of processing →

  1. 01 · Retrieval

    1 mode

    • FY-01

      Superseded agreed document

      The change is read against a drawing, not the approved set.

    Stage gathers

    Agreed documents, drawings and golden-thread state

  2. 02 · Reasoning

    2 modes

    • FY-02

      Category drafted too low

      A change is drafted as recordable where reg 26 makes it notifiable.

    • FY-03

      Adviser recorded by role

      The name and occupation are dropped, and so is the advice given.

    Stage proposes

    Category, affected documents and confidence

  3. 03 · Tool / write

    2 modes

    • FY-04

      Compliance position asserted

      A draft reads as a conclusion the responsible designer never gave.

    • FY-05

      Record dated after the act

      The entry is accurate and complete, and made after the change was carried out.

    Stage writes

    Only where write access and approval policy allow it

  4. 04 · Output

    1 mode

    • FY-06

      Document impact missed

      The drawing is revised and the fire and emergency file is not.

    Stage returns

    The record the client signs and the regulator reads

  5. 05 · Change / Version

    1 mode

    • FY-07

      Designated change missed

      A reg 25 designation never reaches the category rules.

    Stage tracks

    Model, prompt, category rules and reg 26 config

  • Sev-1 · the agent performs a held act
  • Sev-2 · a wrong category reaches the record
  • Sev-3 · documents degrade, change to review
See the complete Construction failure-mode catalogue

Affected slices

A clean project figure can sit on one change type

A project-level change-record completeness figure can read well while a few change types carry the missing elements. BSR publishes nothing at all on change control, so Nestack reports yours by slice.

Slice performance — reported separately, not only in aggregate

Illustrative example
SliceFailure rateLiftLift vs. thresholdStatus
Product substitutions9.6%3.7×Review
External wall changes7.5%2.9×Review
Dutyholder changes4.2%1.6×Watch
Internal refurbishment1.6%0.6×Normal

Bar: missing-element-rate lift vs. an internal-refurbishment baseline · scale 0–4.0× · tick marks the 2.0× review threshold

2 of 4 slices over threshold

Evidence-linked improvement

The loop ends in a regression case

A cycle closes when the unrecorded change is a regression case. That suite is what the next change worked is measured against.

Improvement cycle · five stages

Switchback — the path turns at Improve and returns at Learn

  1. 01

    Detect

    Missing-element rate rises in a change type.

  2. 02

    Diagnose

    The detail that moved after the approval it was drawn against is traced back to one step.

  3. 03

    Improve

    The change ships numbered, and the projects that forced it ride with it.

  4. 04

    Verify

    Nothing releases while one touched change case is still red.

  5. 05

    Learn

    It is kept for good, and the category rules are amended in the same commit.

  6. Learn → Detect

    The return edge. Every later detection meets a suite that is one case longer.

Typical build scope

Twelve workstreams across six weeks

The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, change workflow, evaluation, integration, then production validation and handover.

Workstream

Week 1Week 2Week 3Week 4Week 5Week 6

  1. 01Change-control discovery and boundary definition.Week 1
  2. 02Golden-thread and CDE source assessment.Week 1, Week 2
  3. 03Agreed-document and reg 26 category rule mapping.Week 1, Week 2
  4. 04Change ingestion and document matching.Week 2
  5. 05Category drafting and reg 19 assembly.Week 2, Week 3
  6. 06Confidence scoring and change routing.Week 3
  7. 07Client review workflow.Week 3, Week 4
  8. 08Golden-thread and CDE integration.Week 5
  9. 09Category and consultation cases.Week 4, Week 5
  10. 10Guardrails and recording controls.Week 4
  11. 11Change-trail instrumentation.Week 5, Week 6
  12. 12Deployment, documentation and Agent Care handover.Week 6

12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel

Final scope and sequence confirmed in discovery

Engagement tiers

What each tier includes

Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.

Capability✓ in scope · — not at this tierPilotOne project, one change logProductionProduction golden-thread systemsAdvancedMultiple projects / clients
Introduced at Pilot
Drafting to your agreed documents✓✓✓
Client review gate✓✓✓
Consultation-record baseline✓✓✓
Introduced at Production
Reporting by building—✓✓
Review workflow in your systems—✓✓
Approved write-back—✓✓
Design-register integration—✓✓
Introduced at Advanced
Multi-building rule sets——✓
Multi-stage dutyholder review——✓
High change volume——✓
Multi-project change controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build price
Confirmed after discovery based on integrations, workflow complexity, change volume, approval controls and deployment requirements.
Separate from build
Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.

What we need from you

What you bring, and what we build with it

Each input maps to a piece of build scope and a week in the delivery timeline.

  1. 01Your agreed documents and change control plan

    Agreed-document mapping and change ingestion

    Week 1
  2. 02Representative changes and their records

    Category-drafting baseline and reg 19 element assembly

    Week 2
  3. 03Your reg 26 category rules and decision procedure

    Category-rule mapping and automation-boundary definition

    Week 1
  4. 04Access to relevant APIs, feeds or exports

    Golden-thread and project system assessment, then integration setup

    Week 2
  5. 05Change records you would not want pulled

    Category cases and failure-mode testing

    Week 4
  6. 06What no change record may omit

    Confidence scoring, change routing, guardrails and approval controls

    Week 3
  7. 07Named client signatories to review drafts

    Client review workflow, then pilot and production validation

    Weeks 5–6

Nothing else is required

Deployment, documentation and Agent Care handover are ours.

Delivery timeline

Four phases across six weeks

Each band here is sized to the weeks its own phase absorbs, so the fifth honestly carries a pair.

Phase

W1

W2

W3

W4

W5

W6

  1. DiscoveryW1
  2. BuildW2 – W3
  3. EvaluateW4 – W5
  4. Pilot & LaunchW5 – W6

Week focus

W1Change-control discovery, rule mapping and the automation boundary

W2Source integration and the category-drafting baseline

W3Reg 19 assembly, confidence logic and review controls

W4Evaluation suite, guardrails and failure-mode testing

W5Golden-thread integration, pilot changes and targeted corrections

W6One change cycle run under the client duty-holder, then Agent Care handover

Reading the band
A bar spans the weeks its own work is named in. The week 5 overlap is worked time, not padding.
At the end of W6
Validation closes on live changes, and Agent Care picks up the watch.
Duration
Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.

Next step · Construction AI agent

Build a change-control agent around the record reg 19 already prescribes.

The Lords committee found in December 2025 that applications are rejected for an inability to evidence how safety was considered. On a higher-risk building in England, reg 19 already prescribes that record and reg 18 forbids proceeding without it.

Typical delivery
4–6 weeks
Deployment
Your golden thread
Client signs
Per change
After launch
Agent Care available

Nestack Agents · Building safety change control

AGT-CN-09 · Agent Care available after launch

Build a change-control agent

Four questions so the call starts from your actual setup — then pick a time that suits you.

About you
Your projects

No obligation. We’ll map the workflow, name the automation boundary and tell you if an agent is the wrong answer.