Construction AI agent · Completion
Practical-Completion & Final-Account AI Agent
Four contract forms close a final account differently: seven days under AS 4000 cl.37.4, 28 under JCT, four weeks under NEC4, no clock at all under FIDIC. The agent counts; the certifier signs.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Certifier signs
- Per defect
- After launch
- Agent Care
What this agent does
Builds the completion record, never the certificate
In
- 01
A defect is raised by direction, instruction or notification — a ranked photograph is an observation, not a Defect.
- 02
A register item carries its dated evidence, its instrument, the trade that owns it and the subcontract behind it.
Reason
- 03
A trifling or not-trifling reading is proposed per item — Mears in England and Wales, AS 4000 cl.1 in Australia.
- 04
A completion test is read from this contract, whether that is AS 4000 cl.1, AIA §9.8.1 or NEC4 cl.11.2(2).
- 05
A window opens on certification, and each form is counted on its own rule rather than on a merged one.
Decide
- 06
A final-account line is matched to its instruction, valuation basis or deduction instrument, or flagged unevidenced.
- 07
A statutory completion instrument is kept in a separate register, never allowed to stand for a contractual one.
Out
- 08
A draft rationale, its evidence and each person who saw it before the certifier did are retained on the item.
- 09
Execute write actions only inside the approval boundaries agreed during implementation.
Product statement
The agent proposes and counts; the named superintendent, architect, contract administrator or engineer certifies — and a certificate wrongly issued has no correcting entry, only an adjudication.
Example workflow
One register item, raised to signature
- 1Defect raisedA superintendent direction, a contract-administrator instruction or an NEC4 notification
- 2Evidence assembledDated photographs, the instrument that notified it, the owning trade and the subcontract behind it
- 3Reading proposedTrifling or not, the reason, the contract test cited and confidence
- 4Controls appliedContract-form checks, instrument checks, per-form clock rules and confidence threshold
No human action required
Stages 1 to 4 run unaided, and nothing is certified at any of them — the agent is proposing, and the certifier's lane opens at the confidence gate.
Goes to the named certifier to decide.
Picks up a contract-administration read first.
Certifier decision
The item is held with its evidence, the test cited and the confidence.
Accept · Reclassify · Refer to the contract administrator
Accepted — the reading stands
- 6Project systems updatedOnly where write access and approval policy allow it
- 7Outcome evaluatedItems reopened, windows closed unworked, unevidenced lines and post-certificate disputes
Reclassifications
Every certifier reclassification is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Certifying practical or substantial completion.
- Determining that a defect is trifling.
- Issuing, valuing or agreeing a final account.
- Deducting liquidated damages or calling on security.
Automation boundary
Agent acts unaided
- ✓Assemble the defects and outstanding-work register from the record.
- ✓Bind each item to its instrument, its evidence and its owner.
- ✓Count each conclusivity clock on that form's own rule.
- ✓Reconcile each account line to an instrument; flag the ones without.
Any write stays inside the boundaries agreed at implementation, and never touches a certificate.
- Issuing a certificate of making good.
- Serving or declining a notice of dispute.
- Releasing retention or issuing a payment instrument.
- Changes to contract-form, clock or threshold rules.
Example output
One register item, annotated
An item is attached to the instrument that made it a Defect, not to the photograph that found it.
Completion output · single register item
Illustrative example- Item
- Level 6 lift lobby
- Outstanding work
- Chipped stone threshold at the lift lobby, the lobby otherwise usable
- Window remaining
- 6 clear days
- Instrument
- Superintendent direction
- Confidence
- 86%
- Contract form
- AS 4000-1997 cl.37.4
As received
Taken from the register, the direction and the contract itself — nothing here is decided by the agent.
Evidence on the item
- Direction reference
- Dated site photograph
- Subcontract expiry
Why not trifling
Read against the AS 4000 cl.1 use test, not cost — the superintendent calls it.
What the score decides
Below the configured threshold the item picks up a contract-administration read first.
Action
AcceptReclassifyRefer to the contract administratorValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every register item
From the site record
Read against this contract
Draw on the register, the instruments already issued and the completion test this contract actually sets.
Trifling is a human word
Routine items arrive evidenced, owned and dated before anyone opens the file.
Put the read where the argument is
Contested items carry their reason and their clock, so the certifier starts where the money concentrates.
Build an evidence trail
The defect, the test it was read against and the certifier who signed stay on the register.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Project management
- Procore
- Autodesk Build
- Aconex
- Asite
Defects and snagging
- Snagr
- Fieldwire
- PlanRadar
- Dalux
Cost and final account
- CostX
- Candy
- RIB
- Cubit Estimating
Agent
Practical completion & final account
- Reads the register
- Counts the clocks
- Holds for the certifier
Contract administration
- Contract-form templates
- Handover
- O&M registers
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six layers between the model and the certificate
Six screens tightening inward. What survives them all is named in the map below.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether a reading may stand
- L3
- Puts the call in the certifier's hands
- L4 – L5
- Keep the defect and the test behind it
- L6
- Narrows to defects-register assembly when signals degrade
How Nestack evaluates it
Evaluate the whole completion workflow — not only the register at the end.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the record the certifier signs against
- E1Final-output evaluationDid each register item carry the instrument the contract requires?
- E2Step-level evaluationDid the agent read the right contract form, revision and completion test?
- E3Tool evaluationDid it read and write the correct project, item and clock?
- E4Confidence calibrationDo low-confidence readings actually attract more reclassifications?
- E5Slice evaluationHow does performance change across contract forms and defect types?
- E6Business outcomeHow many items were reopened, and how many windows closed unworked?
Floor — the outcome the certifier answers for
Failure modes
Where each failure originates in the agent
Seven failure modes, each set where it began and not where it landed.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- GG-03
Superseded contract text
The item is read against an unamended standard form.
Stage gathers
The register, the instruments issued and the contract
02 · Reasoning
2 modes
- GG-04
Trifling read from cost
An item is called trifling because it was cheap to fix.
- GG-06
Merged conclusivity clock
One day count runs across four forms; FIDIC has none.
Stage proposes
Evidence, instrument, reading and confidence
03 · Tool / write
2 modes
- GG-02
Damages read as deducted
A computed liquidated-damages figure is set off.
- GG-05
Conditional certificate
A hedged certificate is logged as achieved.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- GG-01
Absence never rendered
The pack lists what arrived and is silent on what never did.
Stage returns
The completion record the certifier signs against
05 · Change / Version
1 mode
- GG-07
Silent clock regression
A rule change quietly moves one form's conclusivity window.
Stage tracks
Model, prompt, contract-form and clock rules
- Sev-1 · acts on a certifying decision
- Sev-2 · a window closes unworked
- Sev-3 · evidence degrades, item goes to review
Affected slices
The number holds until you split it by form
A project-level register-evidence figure can read well while one contract form and one defect type carry most of the unevidenced items. Nestack reports the unevidenced-item rate by slice, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Amended AS 4000 and AS 4902 | 7.4% | 3.6× | Review | |
| Latent and non-apparent defects | 5.6% | 2.7× | Review | |
| NEC4 defects-date projects | 3.1% | 1.5× | Watch | |
| Unamended standard forms | 1.3% | 0.6× | Normal |
Bar: unevidenced-item-rate lift vs. an unamended-form baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
A cycle is finished when a test exists
A cycle is done when the late dispute notice has become a case the next release must pass. That suite is what the next account closed is measured against.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Unevidenced items rise on one contract form.
- 02
Diagnose
The item the builder called trifling and the certifier did not is read back until the cause is one thing.
- 03
Improve
Number the change; the certificates it touched are filed under it.
- 04
Verify
Each touched defect case is run once more, and one red holds it back.
- 05
Learn
It stays as a standing test, and the conclusivity rules move with it.
Learn → Detect
The return edge. Each account closed leaves the suite harder to pass.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, completion workflow, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Completion workflow discovery and boundary setting.Week 1
- 02Register and cost-source assessment.Week 1, Week 2
- 03Contract-form, clock and instrument rule mapping.Week 1, Week 2
- 04Register ingestion and item normalisation.Week 2
- 05Reading logic and instrument binding.Week 2, Week 3
- 06Confidence scoring and item routing.Week 3
- 07Certifier decision workflow.Week 3, Week 4
- 08Cost-system and register integration.Week 5
- 09Defect and conclusivity cases.Week 4, Week 5
- 10Guardrails and certifying controls.Week 4
- 11Register-trail instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne project, one contract form | ProductionProduction project systems | AdvancedMultiple forms / portfolios |
|---|---|---|---|
| Introduced at Pilot | |||
| Assembly to your contract form | ✓ | ✓ | ✓ |
| Certifier decision | ✓ | ✓ | ✓ |
| Register-evidence baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by contract form | — | ✓ | ✓ |
| Conclusivity clocks in your systems | — | ✓ | ✓ |
| Approved write-back | — | ✓ | ✓ |
| Contract-and-cost integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Amended and bespoke forms | — | — | ✓ |
| Multi-stage certifier review | — | — | ✓ |
| High project volume | — | — | ✓ |
| Multi-form conclusivity controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your contract forms and their amendments
→Register ingestion and item mapping
Week 102Representative registers from live projects
→Reading baseline, instrument binding and clock rules
Week 203Your certifiers, by name and appointment
→Contract-form, clock and instrument rule mapping
Week 104Access to relevant APIs, feeds or exports
→Register and cost-source assessment, then integration setup
Week 205Accounts you would not want re-opened
→Window cases and failure-mode testing
Week 406What no final certificate may absorb
→Confidence scoring, item routing, guardrails and certifying controls
Week 307Named certifiers to decide each reading
→Certifier decision workflow, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
What sets a band is the time the phase truly takes, and that is why two of them share week five.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Completion workflow discovery, form mapping and the boundary
W2Register and cost-source integration and the reading baseline
W3Reading workflow, clock logic and certifying controls
W4Evaluation suite, window cases and failure-mode testing
W5Cost-system integration, pilot projects and targeted corrections
W6One completion cycle run under the named certifier, then Agent Care handover
- Reading the band
- Each bar stops where its named work stops. The week 5 overlap is scheduled, not padding.
- At the end of W6
- When the final account validates, Agent Care takes the agent on.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Construction AI agent
Build a completion agent around your contract, not around a house default.
Bring your contract forms, the register you actually keep and whatever your legal team amended out of clause 37. The certificate is carried personally by whoever signs it, long after the job closes. Accounts payable owns the payment instruments; this evidences what they pay against.
- Typical delivery
- 4–6 weeks
- Deployment
- Your project and cost systems
- Certifier signs
- Per defect
- After launch
- Agent Care available
Nestack Agents · Practical completion & final account
AGT-CN-11 · Agent Care available after launch
