Construction AI agent · Site vision
Site-Vision & Progress-Capture AI Agent
Capture the site, index it to the model and the date, and rank what looks wrong — then route each observation to a named owner on a clock, because one nobody closes is evidence.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Safety review
- Identity-free
- After launch
- Agent Care
What this agent does
Captures the site; it does not call the breach
In
- 01
Capture from 360 walkthroughs, fixed cameras and scheduled flights, each flown by a named certificated pilot.
- 02
Blur faces and mask off-site areas at ingest, before a frame reaches a screen — no face or gait template is made.
Reason
- 03
Register each capture to the model and the date, and index it to the level, the zone and the capture position.
- 04
Compute geometric deltas between captures and against the baseline revision the project has named as current.
- 05
Compute progress per element as an estimate, carrying its method and confidence — never as a certified figure.
Decide
- 06
Rank candidate observations against the rule set configured for this site, not against a national default.
- 07
Route each ranked observation to the named person with authority to abate it, with an escalation clock running.
Out
- 08
Retain the frame, the rule cited, the routing, the owner and the closure decision against the observation.
- 09
Execute write actions only inside the approval boundaries agreed during implementation.
Product statement
The agent raises candidates; the site safety manager decides what is a breach — and once raised, an observation cannot be unrecorded, only closed, late and on the record.
Example workflow
One capture run, frame to owner
- 1Capture run receivedA 360 walkthrough, a fixed-camera series or a flight with a named remote pilot
- 2Frames de-identifiedFaces blurred and off-site areas masked at ingest, before any person sees the frame
- 3Candidates rankedDetected conditions, progress deltas, the frame and confidence
- 4Controls appliedSite rule set, capture-boundary checks, recognition gate and confidence threshold
No human action required
Stages 1 to 4 run unaided, and nothing is a breach at any of them — the agent is ranking candidates, and the safety lane opens at the confidence gate.
Goes to the owner who can abate it.
Picks up a site-safety triage read first.
Safety review
The observation is held with its frame, the rule cited and the confidence.
Assign · Reclassify · Escalate to the safety manager
Assigned — owner and clock set
- 6Site systems updatedOnly where write access and approval policy allow it
- 7Outcome evaluatedMissed hazards, false positives, time to closure and observations closed with no action
Closures
Every closure decision is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Enrolling, templating or matching a face or gait.
- Deciding a detected condition is a breach.
- Directing a worker to stop, or clearing work to resume.
- Certifying a progress claim or completion percentage.
Automation boundary
Agent acts unaided
- ✓Capture, stitch, register and index imagery to the model and date.
- ✓Compute geometric deltas against the baseline.
- ✓Rank candidates and route them with an escalation clock.
- ✓Blur faces and off-site areas at ingest, before anyone sees a frame.
Writes happen inside the boundaries agreed at implementation, never onto a certificate.
- Authorising flight over people or beyond line of sight.
- Closing an observation without action.
- Publishing imagery outside the authorised list.
- Feeding an observation into a disciplinary decision.
Example output
One observation, annotated
Everything the agent raises is attached to the frame it came from, and to the clock it starts.
Observation output · single frame
Illustrative example- Zone
- Level 4, north face
- Detected condition
- Unprotected edge at a slab penetration, adjacent to a stacked load
- Measured gap
- 1.8 m opening
- Rule cited
- Edge-protection rule
- Confidence
- 88%
- Routed to
- The exposing employer's supervisor
As received
Taken from the registered frame and the configured rule set — nothing here is decided by the agent.
Frame evidence used
- Registered frame
- Baseline model
- Prior capture
Why it was raised
It matches a rule configured for this zone — the breach call is the manager's.
What the score decides
Below the threshold the observation picks up a triage read before an owner.
Action
AssignReclassifyEscalate to the safety managerValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every capture run
From the capture run
Rank against the site rule set
Draw on the baseline model, the prior capture and the rule set configured for this site.
Point the walk at the risk
Routine coverage arrives already indexed to the level, the zone and the date.
Put the walk-round on the list
Ranked candidates carry their confidence and their clock, so the walk-round starts at the top.
Build an evidence trail
Each observation keeps its frame, its confidence and who it was routed to.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Reality capture
- OpenSpace
- StructionSite
- Matterport
- Reconstruct
Drone and survey
- DroneDeploy
- Propeller Aero
- Surveyed capture positions
Progress and safety vision
- Buildots
- Disperse
- Voxel
- Protex AI
Agent
Site vision & progress capture
- Reads the frame
- Ranks candidates
- Routes to an owner
Project systems
- Procore
- Autodesk Build
- BIM baselines
- EarthCam
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six layers between the model and the site
Each control wraps the one inside it. None of them closes an observation — and one raised and left open is worse than one never raised.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether a candidate may stand
- L3
- Puts the call in a safety manager's hands
- L4 – L5
- Preserve the frame, its confidence and its routing
- L6
- Stops automated offers and holds the staffed path
How Nestack evaluates it
Evaluate the capture-to-closure workflow — not only the detection.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the observation the site acts on
- E1Final-output evaluationDid the observation match a condition the frame actually shows?
- E2Step-level evaluationDid the agent use the right baseline revision, zone and site rule set?
- E3Tool evaluationDid it register the frame to the correct level, zone and date?
- E4Confidence calibrationDo low-confidence captures actually carry more missed hazards?
- E5Slice evaluationHow does performance change across capture conditions?
- E6Business outcomeHow many hazards were missed, wrongly raised, or closed with no action?
Floor — the outcome the contractor answers for
Failure modes
Where each failure originates in the agent
Seven failure modes, each plotted where it starts rather than where it shows.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- SI-01
Superseded baseline
Progress read against a baseline revision the project has replaced.
Stage gathers
Frames, baseline revision, prior captures and the site rule set
02 · Reasoning
2 modes
- SI-02
Sheeting read as finishes
Crash-deck sheeting is booked as an installed floor finish.
- SI-03
Rule applied out of place
A hard-hat flag where the rule does not apply teaches dismissal.
Stage proposes
Ranked candidates, progress deltas and confidence
03 · Tool / write
2 modes
- SI-04
Inferred quantity written
An inferred quantity lands in the progress-claim schedule.
- SI-05
Recognition inherited
A tenant setting turns face matching on with no notice or consent.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- SI-06
Off-site capture published
A neighbour's interior reaches the full project directory.
Stage returns
The observation the site acts on and the imagery it shares
05 · Change / Version
1 mode
- SI-07
Backdated re-scoring
An upgrade re-scores archived imagery into new, backdated observations.
Stage tracks
Model, rule set, recognition gate and capture config
- Sev-1 · a face or gait template is created
- Sev-2 · an observation sits open past its clock
- Sev-3 · capture degrades, frames route to triage
Affected slices
A good baseline says nothing about the night shift
Start from the baseline: daylight structure work from surveyed positions misses least, and the aggregate inherits that. Nestack reports the missed-hazard rate by slice, alongside the false-positive rate that produces it.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Night, low light and heavy occlusion | 9.9% | 2.9× | Review | |
| Fitout and wet trades | 7.5% | 2.2× | Review | |
| Structure phase, daylight capture | 5.1% | 1.5× | Watch | |
| Repeat typologies, BIM baseline | 1.7% | 0.5× | Normal |
Bar: missed-hazard-rate lift vs. an all-frame baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
A closed cycle looks like a new test
An explanation closes nothing. The cycle ends with a case the next release has to clear.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Missed-hazard rate rises in a capture slice.
- 02
Diagnose
The frames, the rule set and the routing log are read side by side until the cause is one of them.
- 03
Improve
The change is stamped to a version, with the frames that produced it attached.
- 04
Verify
Re-run the affected cases; a fail holds the release.
- 05
Learn
A standing test, plus a rule change in the detection set.
Learn → Detect
The return edge. Each turn hands the next one a longer suite to beat.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, capture, detection workflow, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Capture workflow discovery and boundary definition.Week 1
- 02Capture-source and site-system assessment.Week 1, Week 2
- 03Jurisdiction, notice and recognition-gate mapping.Week 1, Week 2
- 04Capture ingestion and de-identification.Week 2
- 05Detection logic and baseline-model binding.Week 2, Week 3
- 06Confidence scoring and observation routing.Week 3
- 07Safety review workflow.Week 3, Week 4
- 08Site-system and observation-log integration.Week 5
- 09Paired-frame regression cases.Week 4, Week 5
- 10Guardrails and publication controls.Week 4
- 11Observation-trail instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne site, one capture cadence | ProductionProduction site systems | AdvancedMultiple sites / capture modes |
|---|---|---|---|
| Introduced at Pilot | |||
| Ranking to your site rule set | ✓ | ✓ | ✓ |
| Safety review and escalation | ✓ | ✓ | ✓ |
| Detection baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by capture zone | — | ✓ | ✓ |
| Escalation clock in your systems | — | ✓ | ✓ |
| Approved write-back | — | ✓ | ✓ |
| Dashboard and BI integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multi-jurisdiction capture rules | — | — | ✓ |
| Multi-stage site review | — | — | ✓ |
| High capture volume | — | — | ✓ |
| Enterprise capture controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your site rule set and capture cadence
→Capture ingestion and zone mapping
Week 102Representative captures from live levels
→Detection baseline, zone mapping and baseline-model binding
Week 203Your surveillance notices and consent records
→Jurisdiction, notice and recognition-gate mapping
Week 104Access to relevant APIs, feeds or exports
→Capture-source and site-system assessment, then integration setup
Week 205Captures where the hazard was there and unflagged
→Detection cases, paired frames and the evaluation suite
Week 406What an observation must reach before it is closed
→Confidence scoring, routing, guardrails and escalation controls
Week 307Named owners with authority to abate
→Safety review workflow, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Phases are drawn over the weeks they occupy. Week 5 carries evaluation and pilot capture together.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Capture workflow discovery, jurisdiction mapping and the boundary
W2Capture-source integration and the detection baseline
W3Detection workflow, confidence logic and routing controls
W4Evaluation suite, guardrails and failure-mode testing
W5Site-system integration, pilot capture runs and targeted corrections
W6A month of capture reviewed by the site team, then handover
- Reading the band
- Bars stop where the named work stops. The week 5 overlap is scheduled, not padding.
- At the end of W6
- Hand-over happens against a verified capture run, not a demo.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Construction AI agent
Build a site-vision agent around who closes the observation.
Show us how you capture, who owns an observation and where the imagery goes. If your queue already outlives its clock, we fix the closure loop before we add a single detector.
- Typical delivery
- 4–6 weeks
- Deployment
- Your capture and site systems
- Safety review
- Identity-free
- After launch
- Agent Care available
Nestack Agents · Site vision & progress capture
AGT-CN-07 · Agent Care available after launch