Travel & Hospitality AI agent · Aviation SMS

Aviation SMS Declaration AI Agent

Match every hazard to the control raised against it, track which of the four retention clocks in 14 CFR 5.97 governs each artefact, and hold the declaration package for the accountable executive.

Typical delivery
4–6 weeks
Deployment
Your stack
Named executive
One signature
After launch
Agent Care

What this agent does

Assembles the package, never the signature

In

  1. 01

    A hazard is reported, and subpart C of 14 CFR part 5 decides what risk control it earns.

  2. 02

    A control is raised, and 14 CFR 5.97(a) keeps its output while that control stays relevant.

Reason

  1. 03

    An assurance output is filed, and 14 CFR 5.97(b) holds it a minimum of five years.

  2. 04

    A safety message goes out, and 14 CFR 5.97(d) holds it twenty-four calendar months.

  3. 05

    A person is trained, and 14 CFR 5.97(c) keeps that record for the term of employment.

Decide

  1. 06

    A control loses relevance, and the output behind it stops carrying the declaration.

  2. 07

    A declaration falls due, and 14 CFR 5.9 sets 28 May 2027 for part 135 and 91.147 operators.

Out

  1. 08

    A safety policy is signed, and 14 CFR 5.21(b) reserves that act to the accountable executive.

  2. 09

    Execute write actions only inside the approval boundaries agreed during implementation.

Product statement

The agent assembles the package and tracks the clocks. The accountable executive designated under 14 CFR 5.25(a) signs the safety policy, and that act cannot be delegated.

Example workflow

One hazard, evidence to signature

  1. 1Hazard evidence receivedOccurrence reports, risk assessments, assurance outputs or training records
  2. 2Hazard context assembledThe hazard, the control raised against it, the subpart it answers to and the clock it runs on
  3. 3Declaration evidence draftedThe hazards, the controls behind them, the gaps and completeness
  4. 4Controls appliedRelevance checks, retention-clock checks, subpart-coverage checks and completeness confidence

No human action required

Stages 1 to 4 run unaided, and nothing is signed at any of them — the agent is assembling, and the safety lane opens at the completeness gate.

5DecisionSplits at the completeness gate
Evidence sufficient

Goes to the accountable executive to sign.

Anything thin

Adds a safety manager read first.

Safety review

The package is held with its hazards, its controls and the outputs behind them.

Sign · Append evidence · Send to safety review

Signed — by the accountable executive

  1. 6Hazard and control records updatedOnly where write access and records policy allow it
  2. 7Outcome evaluatedControl currency, retention coverage, reviewer corrections and what the read found

Corrections

Each safety correction is counted in the evaluation.

What should not run autonomously

Human approval stays in control

Outside the boundary — human approval required

8 items

  • Signing the safety policy under 14 CFR 5.21(b).
    • Submitting the declaration of compliance to the FAA.
    • Deciding that a risk control is no longer relevant.
    • Judging safety performance substandard under 14 CFR 5.75.
  • Automation boundary

    Agent acts unaided

    • ✓Hold each hazard against the risk control raised.
    • ✓Track which of the four retention clocks governs every artefact.
    • ✓Mark the control whose relevance lapsed, and why.
    • ✓Flag the missing record that the declaration package still needs.

    Nothing is signed or submitted except by a named person, inside the agreed boundaries.

    • Judging whether an SMS meets part 5.
    • Telling the FAA the operator is compliant.
    • Setting the safety objectives the policy states.
  • Changes to hazards, controls or retention records.

Example output

One hazard, annotated

The declaration of compliance falls due on 28 May 2027; this record is what one hazard carried into the package.

Declaration evidence · single hazard

Illustrative example
Hazard
Runway excursion risk, subpart C
Recorded as
Control raised, relevance confirmed
Subpart
Subpart C output
Evidence of record
Risk assessment, 3 August 2026
Confidence
Held unsigned
Held for
The accountable executive, by name

As received

Taken from the occurrence report and the risk assessment — it reaches as far as those sources do.

What the record holds

  • Occurrence report
  • Risk assessment
  • Control relevance note

Why no signature here

Signing the safety policy is reserved to the accountable executive.

What the score decides

Below the configured threshold the package takes a safety read before the executive sees it.

Action

SignAppend evidenceSend to safety review

Value

Where AI adds value

The same four claims, placed at the point in the workflow where each one applies.

Where the value lands

Value 01 – 04

Every hazard

From the system that reported it

03Evidence

Where the evidence is used

Nothing else in the corpus answers to a named accountable executive who carries a whole certificate, so this page collides with no other agent we ship.

01Approved path

One signature, four clocks

14 CFR 5.21(b) leaves no room to spread it: "The safety policy must be signed by the accountable executive described in § 5.25." One human, personally, for the certificate entire.

02Human review

What was checked, and not found

The part 21 compliance dates, the DATES paragraph of 89 FR 33068 word for word, the signer of that rule and an eCFR stamp reading last amended 17 August 2026 were each checked and none was confirmed; no delay or withdrawal of the rule was found either.

04

Build an evidence trail

The hazard, the control raised against it and the executive who signed stay on the policy.

Integrations

Typical integrations

Five system groups connect to the same agent. Which of them are in scope is decided in discovery.

  • Safety reporting

    • Occurrence reports
    • portal
    • Confidential hazard reports
  • Risk and assurance

    • Risk registers
    • Audit and assurance outputs
  • Training and personnel

    • Training records
    • HR feed
    • Per-individual employment

Agent

Aviation SMS declaration

  • Reads the hazards
  • Assembles the package
  • Holds for the executive
  • Flight data and operations

    • FDM
    • maintenance systems
    • Safety communications
  • Observability & evaluation

    • OpenTelemetry
    • Langfuse
    • Supported monitoring/evaluation sources

Integration availability depends on the client's existing systems and API access.

Agent controls

Six barriers between the model and the executive

Six barriers, and one hazard must clear every one of them. What gets past is named in the map below.

L6 · Outermost — last line of defence

Inward → L1 · closest to the model

L6Rollback / safe modeNarrow the agent to evidence assembly when evaluation or production signals degrade.Roll back
L5Version monitoringTrack model, prompt and part 5 rules; as of 24 August 2026 no delay, extension or withdrawal of the 2024 SMS rule was found, and 28 May 2027 stands.Track
L4TraceabilityRecord each hazard, the control raised against it, the clock it runs on and every read of the package.Record
L3Executive releaseHold the package for the accountable executive of 14 CFR 5.25(a); the hold governs release, not whether the system beneath it conforms.Gate
L2Scope guardrailsTest the evidence against subparts B to E of 14 CFR part 5 as configured, and against the four clocks in 5.97.Restrict
L1Confidence thresholdsRoute a thin package to a safety read first; part 21 compliance dates went unverified in research and are not worked here.Require review
Model coreEvidence assembled — the hazards, the controls, the clocks and completeness
L1 – L2
Test whether a package may stand
L3
Puts the signature in a person's hands
L4 – L5
Keep the hazard and the control behind it
L6
Retreats to record assembly when signals degrade

How Nestack evaluates it

Evaluate the whole assembly — not only the declaration package that comes out.

Coverage runs the whole depth of the workflow, and every layer is cut by slice.

Surface — the package an inspector reads

  1. E1Final-output evaluationDid the package record what each hazard actually raised?
  2. E2Step-level evaluationDid the agent read the right hazard, the right control and the live retention clock?
  3. E3Tool evaluationDid it read and write the correct hazard and the correct control?
  4. E4Confidence calibrationDo low-confidence packages actually attract more safety corrections?
  5. E5Slice evaluationHow does performance change across specific hazard classes?
  6. E6Business outcomeHow many packages needed a correction before the executive signed?

Floor — the certificate the operator answers for

Failure modes

Where each failure originates in the agent

Seven failure modes, each pinned to the stage where it surfaces first.

Agent lifecycle

Direction of processing →

  1. 01 · Retrieval

    1 mode

    • JY-03

      Stale hazard read

      The risk register read is not the one now in force.

    Stage gathers

    The hazards, the controls, the clocks and the dates

  2. 02 · Reasoning

    2 modes

    • JY-04

      Control asserted, not shown

      A control is called current without its output.

    • JY-06

      Lapsed control read as live

      A control past relevance still carries the package.

    Stage proposes

    The hazards, their controls and completeness

  3. 03 · Tool / write

    2 modes

    • JY-02

      Thin package passed forward

      A package moves on without the safety read.

    • JY-05

      Bound to the wrong control

      An output is filed against the wrong hazard.

    Stage writes

    Only where write access and approval policy allow it

  4. 04 · Output

    1 mode

    • JY-01

      Signed, evidence unrecorded

      The package shows a signature but not what supported it.

    Stage returns

    The package an executive signs and the FAA reads

  5. 05 · Change / Version

    1 mode

    • JY-07

      Silent clock regression

      A configuration change moves the clock, not the record.

    Stage tracks

    Model, prompt, part 5 rules and package fields

  • Sev-1 · a policy signed on no evidence
  • Sev-2 · wrong evidence reaches the package
  • Sev-3 · source degrades, package unsigned
See the complete Travel & Hospitality failure-mode catalogue

Affected slices

Flight operations hazards absorb the corrections

A control-level currency figure can read clean while flight operations hazards carry most of the rework. Nestack reports the correction rate by hazard class, not only in total.

Slice performance — reported separately, not only in aggregate

Illustrative example
SliceFailure rateLiftLift vs. thresholdStatus
Flight operations hazards10.0%3.6×Review
Maintenance and airworthiness7.2%2.6×Review
Ground and ramp operations4.5%1.6×Watch
Training and communication records1.9%0.7×Normal

Bar: correction-rate lift vs. training-record baseline · scale 0–4.0× · tick marks the 2.0× review threshold

2 of 4 slices over threshold

Evidence-linked improvement

What a lapsed control costs

A loop ends when the stale control has become a case the next release must pass. That suite is what the next declaration built is measured against.

Improvement cycle · five stages

Switchback — the path turns at Improve and returns at Learn

  1. 01

    Detect

    Correction rate rises on flight operations hazards.

  2. 02

    Diagnose

    The safety policy signed once, for a hazard register that has moved on since, is read back until one cause remains.

  3. 03

    Improve

    Number the change; the hazards that drove it are filed underneath it.

  4. 04

    Verify

    Each touched hazard case is run once more, and one red holds it back.

  5. 05

    Learn

    It stays on as a standing test, and the retention rules move alongside it.

  6. Learn → Detect

    The return edge. The next assurance year is measured against a suite one case longer.

Typical build scope

Twelve workstreams across six weeks

The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, package assembly, evaluation, integration, then production validation and handover.

Workstream

Week 1Week 2Week 3Week 4Week 5Week 6

  1. 01Hazard-register and automation-boundary discovery.Week 1
  2. 02Occurrence, risk and training sources.Week 1, Week 2
  3. 03Hazard-to-control and retention-clock mapping.Week 1, Week 2
  4. 04Hazard and control ingestion.Week 2
  5. 05Hazard, control and clock binding.Week 2, Week 3
  6. 06Completeness scoring and review routing.Week 3
  7. 07Accountable executive signing workflow.Week 3, Week 4
  8. 08Safety and training-system integration.Week 5
  9. 09Assurance and retention cases.Week 4, Week 5
  10. 10Guardrails and executive controls.Week 4
  11. 11Policy-trail instrumentation.Week 5, Week 6
  12. 12Deployment, documentation and Agent Care handover.Week 6

12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel

Final scope and sequence confirmed in discovery

Engagement tiers

What each tier includes

Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.

Capability✓ in scope · — not at this tierPilotOne certificate, one yearProductionProduction assurance workflowAdvancedMultiple certificates / entities
Introduced at Pilot
Package assembly to your hazards✓✓✓
Accountable executive release✓✓✓
Hazard-register baseline✓✓✓
Introduced at Production
Reporting by control—✓✓
Signing workflow in your systems—✓✓
Approved write-back—✓✓
Occurrence-report integration—✓✓
Introduced at Advanced
Multi-certificate groups——✓
Cross-subpart evidence packs——✓
Large hazard registers——✓
Multi-clock retention controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build price
Confirmed after discovery based on integrations, workflow complexity, reporting volume, approval controls and deployment requirements.
Separate from build
Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.

What we need from you

What you bring, and what we build with it

Each input maps to a piece of build scope and a week in the delivery timeline.

  1. 01Your certificates and the operations under each

    Hazard-register mapping and evidence capture

    Week 1
  2. 02Representative occurrence, risk and training records

    Record binding, clock logic and the package baseline

    Week 2
  3. 03Your risk acceptance criteria under subpart C

    Hazard mapping, control binding and the automation boundary

    Week 1
  4. 04Access to relevant APIs, feeds or exports

    Reporting, risk and training-source assessment, then integration setup

    Week 2
  5. 05Declarations you would not want audited

    Retention cases and the evaluation run

    Week 4
  6. 06What no safety policy may prove

    Completeness scoring, review routing, guardrails and release controls

    Week 3
  7. 07An accountable executive designated under 14 CFR 5.25(a)

    Signing workflow, then pilot and production validation

    Weeks 5–6

Nothing else is required

Deployment, documentation and Agent Care handover are ours.

Delivery timeline

Four phases across six weeks

Each width is the time a phase truly takes and not a layout choice, so week five holds two of them.

Phase

W1

W2

W3

W4

W5

W6

  1. DiscoveryW1
  2. BuildW2 – W3
  3. EvaluateW4 – W5
  4. Pilot & LaunchW5 – W6

Week focus

W1SMS workflow discovery, hazard mapping and the automation boundary

W2Source integration and the control-currency baseline

W3Package assembly, retention logic and release controls

W4Evaluation suite, relevance cases and failure-mode testing

W5Records integration, pilot packages and targeted corrections

W6One assurance year run under the accountable executive, then Agent Care handover

Reading the band
Each bar covers only the weeks its own work is named for. Week five takes a pair because the work does.
At the end of W6
When the safety record validates, Agent Care takes the agent on.
Duration
Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.

Next step · Travel & Hospitality AI agent

Build an SMS agent around the policy your accountable executive has to sign.

Show us one hazard and the control raised against it. The accountable executive of 14 CFR 5.25(b)(2) develops and signs the safety policy, and may hand that to nobody. Part 135 and 91.147 operators declare compliance by 28 May 2027; part 121 fell due on 28 May 2025.

Typical delivery
4–6 weeks
Deployment
Your hazards
Named executive
One signature
After launch
Agent Care available

Nestack Agents · Aviation SMS

AGT-TH-16 · Agent Care available after launch

Build an SMS agent

Four questions so the call starts from your actual setup — then pick a time that suits you.

About you
Your hazards

No obligation. We’ll map the workflow, name the automation boundary and tell you if an agent is the wrong answer.