Manufacturing AI agent · Genealogy
Production-Genealogy & Recall-Scoping AI Agent
Maintain as-built genealogy from the records your plants already write, assemble the smallest population the evidence will defend, and hold it for the named person who decides scope.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Person decides
- Pre-filing
- After launch
- Agent Care
What this agent does
Assembles the population, not the decision
In
- 01
A unit is built, and the lots, machines, tooling and test results the line captures are bound to its serial.
- 02
A lot is consumed, and its split across work orders is carried down to the unit, not left at the order.
Reason
- 03
A unit is reworked off the line, and the bench event is carried forward rather than left as a silent gap.
- 04
A build is covered only to the level risk-graded in the IATF 16949:2016 8.5.2.1 plan, and that level is stated.
- 05
A defect is confirmed, and the population is assembled with the evidence that puts the adjacent units outside it.
Decide
- 06
A record is missing, and the population widens to the boundary the evidence holds, with the gap named.
- 07
A lot is suspect, and forward tracing lists where it went, as far down the tiers as the distribution records reach.
Out
- 08
A population is assembled, and it goes with its exclusion evidence to the named recall decision-maker.
- 09
Execute write actions only inside the approval boundaries agreed during implementation.
Product statement
The agent assembles the population; 49 CFR 573.6(c)(2), as in force in 2026, makes the basis for it a filed statement a named officer signs.
Example workflow
One confirmed defect, end to end
- 1Defect confirmedField failure, warranty signal, test escape or supplier notice
- 2Genealogy pulledLots, sub-assembly serials, machines, tooling, process data and rework events
- 3Population assembledSerials in scope, the units ruled out, open gaps and confidence
- 4Controls appliedExclusion-evidence checks, gap coverage, forward-trace checks and confidence threshold
No human action required
Stages 1 to 4 run unaided, and no unit is included or excluded at any of them — the agent is assembling, and the decision-maker's lane opens at the confidence gate.
Goes to the recall decision-maker to scope.
Adds a legal read first.
Scope decision
The population is held with its exclusion evidence, its open gaps and the confidence.
Sign off · Widen · Send to legal review
Scoped — decision recorded
- 6Quality systems updatedOnly where write access and approval policy allow it
- 7Outcome evaluatedWidenings, units found late, and populations amended after the report was filed
Widenings
Every population the decision-maker widens is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Determining that a defect is safety-related.
- Deciding the affected population and the remedy.
- Judging whether a condition is reportable.
- Filing a defect report with a regulator.
Automation boundary
Agent acts unaided
- ✓Maintain as-built genealogy from the records the line writes for the named owner.
- ✓Assemble the smallest population the records will defend into the review queue.
- ✓Show what puts each adjacent unit outside that boundary.
- ✓Mark the gaps in the genealogy, and hold the population.
Any write happens inside the boundaries agreed at implementation, never before the scope decision.
- Narrowing a population the genealogy cannot support.
- Telling a customer that suspect units shipped.
- Setting the recall strategy or its depth.
- Changes to genealogy, exclusion or retention rules.
Example output
One confirmed defect, annotated
Everything the agent assembles is attached to the record it was drawn from.
Scoping output · single defect
Illustrative example- Defect
- Sensor sub-assembly
- Population line
- Traced to one supplier lot on one line
- Units in scope
- 1,320 units
- Basis of record
- As-built genealogy
- Confidence
- 86%
- Units ruled out
- Adjacent lots, evidenced
As received
Taken from the build records the line already writes — nothing on this side is inferred by the agent.
Evidence used
- Lot-to-unit records
- Machine and test data
- Rework bench entries
Why these units
It is the boundary the build records will defend and a person still decides.
What the score decides
Below the configured threshold the population picks up a legal read first.
Action
Sign offWidenSend to legal reviewValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every unit
From the build record
Scope from the record
Draw on the lot, machine, test and rework records the plants already write.
Scope is an exclusion problem
NHTSA's November 2024 Ford consent order required a VIN-based traceability system.
Send review to the thin records
Open gaps and low-confidence populations are marked, so the read starts where the genealogy is thin.
Build an evidence trail
The unit, the record it was built from and the engineer who scoped it stay on the campaign.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
MES and shop floor
- Siemens Opcenter
- Plex
- Critical Manufacturing
- AVEVA
ERP and serialisation
- SAP
- Oracle
- Infor
- Lot, batch and serial masters
Quality and PLM
- Teamcenter
- Windchill
- ETQ
- Sparta TrackWise
Agent
Genealogy & recall scoping
- Reads the records
- Assembles the population
- Holds for the decision
Distribution and field
- WMS
- consignee records
- Warranty and field-failure data
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six layers between the model and the population
The controls sit six deep, innermost last. What escapes every one is set out in the map below.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether an exclusion may stand
- L3
- Puts the scope in a named person's hands
- L4 – L5
- Keep the unit and the record behind it
- L6
- Widens the population when signals degrade
How Nestack evaluates it
Evaluate the genealogy underneath — not only the finished population.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the population that goes out
- E1Final-output evaluationDid every serial in scope, and every one ruled out, trace to a record?
- E2Step-level evaluationDid the agent use the right build records, lot links and rework events?
- E3Tool evaluationDid it read and write the correct unit and the correct build period?
- E4Confidence calibrationDo low-confidence populations actually attract more widenings?
- E5Slice evaluationHow does performance change across specific build periods?
- E6Business outcomeHow many populations were widened, or amended after the report was filed?
Floor — the population the plant defends
Failure modes
Where each failure originates in the agent
Seven failure modes, placed where each one begins.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- YG-03
Rework bench unread
Off-line rework is absent from the build trail.
Stage gathers
Lot links, machine data, rework events and tests
02 · Reasoning
2 modes
- YG-04
Gap closed by inference
A missing lot link is bridged without evidence.
- YG-06
Lot read at order level
A split lot is scoped to the order, not the unit.
Stage proposes
Serials in scope, exclusions and confidence
03 · Tool / write
2 modes
- YG-02
Population released early
Agent acts despite insufficient certainty.
- YG-05
Lot code collision
Two plants number lots the same way.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- YG-01
Population too narrow
Affected units fall outside the scope.
Stage returns
The population the decision-maker signs and files
05 · Change / Version
1 mode
- YG-07
Silent scoping regression
A rule change narrows what the population includes.
Stage tracks
Model, prompt, genealogy rules and exclusion rules
- Sev-1 · scope closed outside the boundary
- Sev-2 · affected units left out of scope
- Sev-3 · record degrades, scope goes to review
Affected slices
A complete genealogy is not an even one
A plant-level completeness score can read strong while a few build periods carry most of the widening. Nestack reports the widening rate by slice, not only in total across the plant.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Lots split across work orders | 5.9% | 3.5× | Review | |
| Units reworked off the line | 3.8% | 2.2× | Review | |
| Build periods past retention | 2.6% | 1.5× | Watch | |
| Single-line serialised builds | 1.4% | 0.8× | Normal |
Bar: scope-widening-rate lift vs. single-line serialised baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
Nothing closes until the gap is a test
A cycle is done when the hole in the genealogy is a case the next release must close. That suite is what the next population scoped is measured against.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Widening rate rises in a build period.
- 02
Diagnose
The recall that took every unit built that year is traced back until one cause is left.
- 03
Improve
Version the fix, and the units that exposed it stay attached to that version.
- 04
Verify
The release is held back until each touched scoping case passes again.
- 05
Learn
The case is retained, and the genealogy rules move with it in one change.
Learn → Detect
The return edge. The next population is scoped against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, population assembly, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Scoping workflow and evidence boundary definition.Week 1
- 02Build-record and genealogy assessment.Week 1, Week 2
- 03Lot, serial, rework and process-record rule mapping.Week 1, Week 2
- 04Genealogy ingest and unit-link mapping.Week 2
- 05Population assembly and evidence binding.Week 2, Week 3
- 06Confidence scoring and gap routing.Week 3
- 07Scope-decision workflow.Week 3, Week 4
- 08MES and ERP-system integration.Week 5
- 09Population and evidence cases.Week 4, Week 5
- 10Guardrails and scoping controls.Week 4
- 11Unit-trail instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne plant, one product line | ProductionProduction shop-floor systems | AdvancedMultiple plants / systems |
|---|---|---|---|
| Introduced at Pilot | |||
| Genealogy from your build records | ✓ | ✓ | ✓ |
| Scope decision | ✓ | ✓ | ✓ |
| Genealogy-completeness baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by build period | — | ✓ | ✓ |
| Scope-decision workflow in your systems | — | ✓ | ✓ |
| Approved write-back | — | ✓ | ✓ |
| Shop-floor record integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multi-sector reporting rules | — | — | ✓ |
| Multi-stage quality approvals | — | — | ✓ |
| High build volume | — | — | ✓ |
| Multi-plant genealogy controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your build records and serialisation scheme
→Genealogy ingestion and unit-link mapping
Week 102Representative builds, rework included
→Scoping baseline, evidence indexing and unit binding
Week 203Your exclusion rules and retention limits
→Lot, serial and rework-rule mapping
Week 104Access to relevant APIs, feeds or exports
→MES, ERP and quality assessment, then integration setup
Week 205Populations you would not want defended
→Exclusion cases and failure-mode testing
Week 406What no narrowing may rest on
→Confidence scoring, gap routing, guardrails and scope controls
Week 307A named decision-maker to scope campaigns
→Scope-decision workflow, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Each band covers the weeks the build really takes, so evaluation and pilot share the fifth.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Scoping workflow discovery, rule mapping and the automation boundary
W2Source integration and the genealogy baseline
W3Population assembly, confidence logic and scope controls
W4Evaluation suite, exclusion and gap checks and failure-mode testing
W5Quality-system integration, pilot defects and targeted corrections
W6One build period reconstructed under the quality manager, then handover
- Reading the band
- A bar sits only on the weeks its own work is named in. Week 5 really does carry two phases.
- At the end of W6
- The final checks clear on live campaigns and monitoring moves to Agent Care.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Manufacturing AI agent
Build a recall-scoping agent before a regulator scopes it for you.
Show us your build records and who decides scope. The evidence that the units you left out are fine has to survive a regulator reading it, a customer spot-checking it and a field failure two years on.
- Typical delivery
- 4–6 weeks
- Deployment
- Your shop-floor stack
- Person decides
- Pre-filing
- After launch
- Agent Care available
Nestack Agents · Genealogy & recall scoping
AGT-MFG-21 · Agent Care available after launch