Manufacturing AI agent · Planning
Production-Planning & Scheduling AI Agent
Sequence orders across lines and work centres against capacity, material and due dates, re-plan when something breaks and show the trade-off — a planner commits the schedule, and the agent releases nothing.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Schedule commit
- Planner only
- After launch
- Agent Care
What this agent does
Proposes the schedule, does not release it
In
- 01
Take open and firm orders, forecasts, work-order status and what each line actually ran from the ERP and MES.
- 02
Load routings, cycle times, changeover matrices, calendars, tooling and on-hand and on-order material.
Reason
- 03
Sequence orders across lines and work centres against finite capacity, the bottleneck and the changeover cost.
- 04
Check each sequence against material availability, tooling, qualified operators and the shared constraints named.
- 05
Compare a run against the cycle time and yield the master data claims, and mark where the floor disagrees.
Decide
- 06
Hold any change inside the frozen window, or one that moves a customer commitment, for the planner to decide.
- 07
Route a plan that breaks a modelled constraint or rests on stale master data to a planner instead of proposing it.
Out
- 08
Present the schedule with the trade-off it makes — what is late, what is held, what the sequence costs in changeover.
- 09
Retain the inputs read, the constraints applied, the alternatives rejected and every edit the planner made.
Product statement
The agent proposes and re-plans within limits a planner set. Committing the schedule, releasing work, moving material and changing a customer commitment stay with a planner.
Example workflow
One planning run, end to end
- 1Planning run openedA shift boundary, an MRP run, a machine down, a material short or an order the customer changed
- 2Position gatheredOpen and firm orders, work-order status, on-hand and on-order material, calendars and what each line is running
- 3Constraints loadedRoutings, cycle times, changeover matrix, tooling, qualified operators, shared utilities and the frozen window
- 4Sequence proposedOrders placed across lines and work centres, with the bottleneck and the changeover cost priced in
No human action required
Stages 1 to 4 run without a person in the loop — gathering, loading and sequencing all finish before a planner is asked to read anything. A change that touches a customer commitment ends that stretch on the spot.
Goes to the planner as a proposed schedule.
Held with the trade-off for the planner to decide.
Planner or scheduling lead
Reads the proposed sequence, what it costs and what it breaks, then edits it and commits the schedule the plant runs.
Commit · Edit sequence · Send back
Committed — handed back
- 6Schedule presented for commitWritten to the ERP or MES only after a planner commits it; nothing is released until they do
- 7Outcome evaluatedAttainment against the committed plan, churn, constraint violations and where the master data was wrong
Edits
What the planner changes in the sequence is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Committing the schedule the plant runs.
- Releasing or dispatching a work order.
- Promising or changing a customer due date.
- Moving, issuing or reserving physical material.
Automation boundary
Agent acts unaided
- ✓Sequence orders across lines and work centres against finite capacity.
- ✓Price changeover cost, due dates and priorities into the proposed order.
- ✓Re-plan within the limits a planner set when a machine or a material moves.
- ✓Show the trade-off, the constraint that bound it, and what it rejected.
The agent writes a proposed schedule and its rationale. Committing it and releasing work are not its to write.
- Changing routings, cycle times or changeover values.
- Overriding a frozen or in-progress order.
- Deciding overtime, extra shifts or subcontract.
- Changing planning parameters, lot sizes or safety stock.
Example output
One re-plan after a breakdown, annotated
Everything the agent proposes is attached to the orders, constraints and master data it was built from.
Planning output · one re-plan on one disruption
Illustrative example- Disruption
- Press 3 down, 6 h estimate
- Orders affected
- 4, two due Friday
- Frozen until
- Wednesday
- Proposed
- Two orders to press 5
- Confidence
- 88%
- Commit
- Not made by the agent
As received
The machine, maintenance's estimate and the orders it held — read from the ERP and the MES, not inferred.
Evidence used
- Press 5 tooling free
- Observed cycle, not standard
- Same-family changeover
Why this sequence
Press 5 holds the tool and is qualified for the family. One order slips to Monday.
What the score decides
Confidence says how the master data matched the last runs, not whether the plan is right.
Action
CommitEdit sequenceSend backValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every open order
ERP orders, forecast and work-order status
Plan against your own constraints
Use the plant's routings, changeover matrix, calendars, tooling and qualification rules, and what the lines actually ran.
Give the planner a costed option
Each proposal arrives with the constraint that bound it and what it cost, so the planner argues with a sequence instead of rebuilding one.
Put the disruptions in front of a person
A machine down, a short material or a changed order reaches the planner as a priced re-plan rather than a spreadsheet rebuilt at shift start.
Build an evidence trail
Retain the orders read, the constraints applied, the alternatives rejected, the confidence and the planner's edit — on both paths.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
ERP & planning
- SAP PP/DS
- Oracle
- Dynamics 365
- Infor
- MRP and MPS records
MES & shop floor
- Siemens Opcenter
- Rockwell
- Work-order status
- machine states
Planning master data
- Routings
- cycle times
- Changeover matrices
- shift calendars
Agent
Production planning & scheduling
- Sequences orders
- Prices the trade-off
- Re-plans on disruption
Secondary constraints
- Tooling
- operator qualification
- Material on hand
- shared utilities
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six layers between the model and the schedule
Each control wraps the one inside it. A schedule clears every layer before a planner sees it, and the commit sits outside all six.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Decide whether a sequence can stand at all
- L3
- Decides how much of a plan may move
- L4 – L5
- Keep the commit with a planner, trail intact
- L6
- Pulls automation back when signals degrade
How Nestack evaluates it
Evaluate the whole plan — not only the sequence it proposes.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the schedule the planner opens
- E1Final-output evaluationDid the committed schedule survive contact with the shift?
- E2Step-level evaluationDid it read the right routing, calendar and changeover value?
- E3Tool evaluationDid it read the right orders, stock and work-order states?
- E4Master-data accuracyDo the cycle times and yields match what the runs actually did?
- E5Slice evaluationHow does the plan hold across families, changeovers and shifts?
- E6Business outcomeHow much of the plan was attained, and how much of it churned?
Floor — the plan the floor actually runs
Failure modes
Where each failure originates in the agent
Seven failure modes plotted against the five stages of the agent lifecycle. None of them commits a schedule, releases work or moves a customer date — the planner's commit, the frozen window and the plant's own change control are the controls that stop them. If one gets through and the floor has already run to it, the orders, constraints and rejected alternatives held in the record are what the re-plan, the customer notification and the material recovery are built from.
Agent lifecycle
Direction of processing →
01 · Retrieval
2 modes
- PP-01
Inventory the floor cannot find
Stock the system holds is not on the rack.
- PP-02
Cycle time the line never hits
The routing standard is not what the line runs at.
Stage gathers
Orders, stock, work-order states and the calendars
02 · Constraint model
2 modes
- PP-03
Constraint nobody modelled
A tool, a qualified operator or a shared utility.
- PP-04
A plan with no slack in it
It only works if nothing goes wrong for a week.
Stage models
Capacity, changeover, tooling, labour and material
03 · Sequencing
1 mode
- PP-05
Optimal sequence, missed date
Cheapest changeover order, late for the order that mattered.
Stage sequences
Orders across lines against the binding constraint
04 · Output
1 mode
- PP-06
Promise on capacity already spent
A date given against capacity an unreleased order holds.
Stage presents
The schedule and the trade-off the planner reads
05 · Change / Version
1 mode
- PP-07
Re-planning churns the schedule
A parameter change moves it faster than the floor reads it.
Stage tracks
Model, parameter, master-data and routing changes
- Sev-1 · a customer commitment is put at risk
- Sev-2 · the plan cannot be run as written
- Sev-3 · the floor stops trusting the schedule
Affected slices
A new SKU is not the same planning problem
Two orders on the same line are not the same problem to plan. A family that has run for two years has master data the floor agrees with; a new SKU on its first run does not. Nestack reports performance by slice, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| New SKUs, first runs | 6.8% | 3.7× | Review | |
| Long-changeover families | 5.1% | 2.8× | Review | |
| Re-plans after a breakdown | 3.4% | 1.8× | Watch | |
| Mature family, settled line | 1.3% | 0.7× | Normal |
Bar: planner-edit-rate lift vs. mature-family baseline · scale 0–4.0× · tick marks 2.0×
2 of 4 slices over threshold
Evidence-linked improvement
A plan the floor could not run becomes a constraint
What the planner edited, and what the shift actually ran, come back as constraints and master-data corrections the next schedule has to respect.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Attainment falls or the planner's edit rate climbs on a family, a line or a shift.
- 02
Diagnose
Traced to a cycle time, a yield, a changeover value, a constraint never modelled or a re-plan trigger.
- 03
Improve
The master data or the constraint model is corrected under your change control, with a named approver.
- 04
Verify
Replayed against the weeks that went wrong, then run in parallel before a planner commits from it.
- 05
Learn
The unmodelled constraint enters the planning model and the wrong standard goes back to industrial engineering.
Learn → Detect
The return edge. A routing or cycle-time correction is a master-data change — it is approved and recorded before planning runs on it, not after.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, master data and access, the constraint model and sequencing, evaluation, then parallel running and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Planning-workflow discovery and boundaries.Week 1
- 02Routing, cycle-time and yield data review.Week 1, Week 2
- 03ERP, MES and calendar access assessment.Week 1, Week 2
- 04Order, stock and work-order state ingestion.Week 2
- 05Changeover matrix, built with your setters.Week 2, Week 3
- 06Constraint model — tooling, labour, utilities.Week 2, Week 3
- 07Sequencing against finite capacity.Week 3, Week 4
- 08Frozen-window and commitment guards.Week 4
- 09Re-plan triggers and churn limits.Week 4, Week 5
- 10Evaluation suite and replayed bad weeks.Week 4, Week 5
- 11Planner review and schedule-commit workflow.Week 5, Week 6
- 12Observability, deployment and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne line, one product family | ProductionProduction ERP and MES integration | AdvancedMulti-line / multi-site |
|---|---|---|---|
| Introduced at Pilot | |||
| Proposed sequence for one line | ✓ | ✓ | ✓ |
| Finite-capacity and changeover modelling | ✓ | ✓ | ✓ |
| The trade-off shown with every proposal | ✓ | ✓ | ✓ |
| Schedule committed by a planner | ✓ | ✓ | ✓ |
| Baseline evaluation | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Master-data accuracy against observed runs | — | ✓ | ✓ |
| Constraint model — tooling, labour, utilities | — | ✓ | ✓ |
| Re-planning within limits a planner set | — | ✓ | ✓ |
| Observability and evaluation | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Family and changeover-type slices | — | — | ✓ |
| Multi-line and enterprise controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on lines and families in scope, the condition of your planning master data, ERP and MES integrations, constraint complexity and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your routings, cycle times and yields exactly as they stand
→Routing, cycle-time and yield data review
Week 102Access to ERP orders, MES work-order states and shift calendars
→ERP, MES and calendar access assessment
Week 203Changeover times from the setters who actually do them
→Changeover matrix, built with your setters
Week 304The constraints nobody wrote down — tooling, qualified operators, shared utilities
→Constraint model — tooling, labour and utilities
Week 305Your frozen window, priority rules and what a commitment means here
→Frozen-window and commitment guards, then churn limits
Week 406The weeks that went badly — breakdowns, shortages and expedites
→Evaluation suite, replayed bad weeks and failure-mode testing
Week 407Named planners who commit the schedule today
→Planner review and commit workflow, then parallel running
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Phases are drawn over the weeks they actually occupy. Week 5 carries both the replayed bad weeks and the first schedules your planners commit from.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Planning-workflow discovery, routings, cycle times and yields
W2ERP, MES and calendar access, then orders and work-order states
W3Changeover matrix, constraint model and finite-capacity sequencing
W4Evaluation suite, master-data accuracy and commitment guards
W5Replayed bad weeks, first parallel schedules and churn limits
W6Your planners commit from the agent's plan, then Agent Care starts
- Reading the band
- Master-data accuracy is measured in week 4 against runs the plant already did — before any schedule is put in front of a planner in week 5.
- At the end of W6
- The agent has planned in parallel with your existing method and been read by the planners who commit from it, then Agent Care takes over monitoring.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Manufacturing AI agent
Build a planning agent around your own constraints.
Show us one line, its routings and changeover times, and a month that went badly — the breakdowns, the shortages and the expedites. We'll sequence those weeks again on your own master data, name the constraint behind every order, and mark the standards the line no longer runs to.
- Typical delivery
- 4–6 weeks
- Deployment
- Your planning stack
- Schedule commit
- A planner, always
- After launch
- Agent Care available
Nestack Agents · Production planning & scheduling
AGT-MFG-01 · Agent Care available after launch