Manufacturing AI agent · Quality

Quality-Inspection Copilot AI Agent

Present candidate defects with the evidence, compare a part against the control plan and the current drawing revision, assemble the inspection record and route suspect parts — a qualified person dispositions.

Typical delivery
4–6 weeks
Deployment
Your stack
Disposition
Never the agent
After launch
Agent Care

What this agent does

Presents candidates and assembles the record

In

  1. 01

    Take station images, gauge and CMM readings and the part identity from the cell and the work order.

  2. 02

    Load the control plan, the drawing characteristics and the revision in force for that part and operation.

Reason

  1. 03

    Compare each reading against the characteristic, its tolerance and the sampling frequency the plan names.

  2. 04

    Present candidate defects beside the image, the station, the fixture and the reference examples matched.

  3. 05

    Track measured characteristics against the control limits and mark runs, trends and shifts as they build.

Decide

  1. 06

    Route a suspect part to quarantine and to a named inspector rather than judging it conforming.

  2. 07

    Hold anything read against a superseded revision or a gauge with no current capability study.

Out

  1. 08

    Assemble the inspection record — part, lot or serial, station, gauge, revision, reading and image.

  2. 09

    Present it for signature. Release, scrap, rework and concession stay with the person the procedure names.

Product statement

The agent presents candidates with the evidence and assembles the record. Disposition — release, scrap, rework or concession — stays with a qualified person named in the procedure.

Example workflow

One part, end to end

  1. 1Part reaches the stationA vision cell, a gauge, a CMM or a manual inspection step named on the work order
  2. 2Part and plan identifiedLot or serial, work order, operation, station and fixture, then the control plan and the revision in force
  3. 3Characteristics read and matchedReadings against the named characteristics, candidate defects against the labelled reference examples
  4. 4Checks appliedRevision currency, gauge calibration and capability, sampling frequency and the control limits

No human action required

Stages 1 to 4 run without a person in the loop — reading, matching and the plan checks all finish before anyone is asked to look at a part. Anything outside tolerance ends that stretch on the spot.

5DecisionSplits on confidence and on whether anything is out of tolerance or out of control
In tolerance, no candidate

Filed as an observation; a person signs it off.

Candidate defect or out of tolerance

Quarantined and put in front of an inspector.

Inspector or quality engineer

Looks at the part, the image and the reading against the control plan, then dispositions it under the procedure.

Disposition · Correct · Send to MRB

Dispositioned — handed back

  1. 6Record assembled and filedWritten to the quality system only where access and procedure allow; the disposition field stays empty
  2. 7Outcome evaluatedEscapes and false rejects against a re-inspected sample, per-defect-class recall and inspector agreement

Corrections

What the inspector overturns is counted in the evaluation.

What should not run autonomously

Human approval stays in control

Outside the boundary — human approval required

8 items

  • Dispositioning a non-conforming part.
    • Releasing product or certifying conformance.
    • Scrapping, reworking or accepting under concession.
    • Closing a non-conformance or corrective action.
  • Automation boundary

    Agent acts unaided

    • ✓Present candidate defects beside the image and the reference examples matched.
    • ✓Compare readings against the control plan and the revision in force.
    • ✓Flag drift against control limits, and gauges with no current capability study.
    • ✓Quarantine-route suspect parts and assemble the record for a person to sign.

    The agent writes the inspection record and the routing flag. The disposition and the release are not its to write.

    • Signing the inspection or batch record.
    • Changing the control plan or an inspection method.
    • Widening a tolerance or an accept threshold.
  • Setting the containment boundary after an escape.

Example output

One part at one station, annotated

Everything the agent presents is attached to the exact part, station and drawing revision it was read from.

Inspection output · single part at one station

Illustrative example
Part and operation
Machined housing, op 40
Station
Vision cell 2, fixture B
Drawing revision
Rev C, in force
Presented as
Candidate porosity, near edge
Confidence
87%
Disposition
Not made by the agent

As received

The part, the station and fixture it ran on, and the revision in force at the time — taken from the work order, not inferred.

Evidence used

  • Rev-C characteristic 14
  • Three reference defects
  • Prior runs, same fixture

Why it was presented

The feature is in tolerance, but the last runs sit on one side of the mean.

What the score decides

Confidence decides how hard the inspector looks, not whether a part ships.

Action

DispositionCorrectSend to MRB

Value

Where AI adds value

The same four claims, placed at the point in the workflow where each one applies.

Where the value lands

Value 01 – 04

Every part inspected

Vision cell, gauge, CMM or a manual step

03Compare & record

Work to your own control plan

Use the plant's control plan, drawing characteristics, gauge records and the reference defects your inspectors labelled.

01Approved path

Give the inspector evidence, not a verdict

The image, the reading, the characteristic and the reference examples arrive together, so the decision starts from what was seen.

02Human review

Send the doubtful parts, not all of them

Suspect parts and weak candidates reach an inspector while the rest carry a complete record, so attention goes where the doubt is.

04

Build an evidence trail

Retain the part, the station and fixture, the revision, the gauge, the image, the reading, the confidence and the disposition — on both paths.

Integrations

Typical integrations

Five system groups connect to the same agent. Which of them are in scope is decided in discovery.

  • Inspection stations

    • Cognex
    • Keyence
    • Basler
    • Halcon
    • CMM and gauge output
  • Quality & MES

    • Siemens Opcenter
    • SAP QM
    • InfinityQS
    • Minitab
    • Plant MES
  • Engineering & drawings

    • Teamcenter
    • Windchill
    • PLM revisions
    • GD&T characteristics

Agent

Quality-inspection copilot

  • Compares to the plan
  • Presents candidates
  • Routes suspect parts
  • Gauge & calibration records

    • Gauge registers
    • calibration dates
    • MSA and gauge R&R
    • Reference defects
  • Observability & evaluation

    • OpenTelemetry
    • Langfuse
    • Supported monitoring/evaluation sources

Integration availability depends on the client's existing systems and API access.

Agent controls

Six layers between the model and the disposition

Each control wraps the one inside it. A candidate clears every layer before an inspector sees it, and the disposition sits outside all six.

L6 · Outermost — last line of defence

Inward → L1 · closest to the model

L6Rollback / safe modeReturn the station to your existing inspection method if evaluation signals degrade.Roll back
L5TraceabilityRecord the part, station, fixture, revision, gauge, image, reading and disposition.Record
L4Inspector gateDisposition, release, scrap, rework and concession stay with a qualified person.Gate
L3Candidate confidenceWeak or unfamiliar candidates are marked for the inspector to look again.Flag
L2Gauge capability gateA reading from an uncalibrated or unstudied gauge is reported as not yet meaningful.Withhold
L1Plan and revision checkNothing is compared against a superseded revision or a characteristic the plan does not name.Verify
Model coreCandidate produced — image, reading, matched characteristic, control-limit state and confidence
L1 – L2
Keep the comparison current and meaningful
L3
Decides how hard the inspector looks
L4 – L5
Keep disposition with a person, trail intact
L6
Pulls automation back when signals degrade

How Nestack evaluates it

Evaluate the whole inspection — not only the candidates it presents.

Coverage runs the whole depth of the workflow, and every layer is cut by slice.

Surface — the candidate the inspector opens

  1. E1Final-output evaluationDid what the agent presented match what a re-inspection found?
  2. E2Step-level evaluationDid it read the right characteristic, tolerance and drawing revision?
  3. E3Tool evaluationDoes the record tie back to the exact part, station, fixture and gauge?
  4. E4Per-defect-class recallHow does recall hold for the classes with only a handful of examples?
  5. E5Slice evaluationHow does performance change across SKUs, shifts and changeovers?
  6. E6Business outcomeWhat escaped, what was falsely rejected, and how much was re-inspected?

Floor — the disposition a qualified person makes

Failure modes

Where each failure originates in the agent

Seven failure modes plotted against the five stages of the agent lifecycle. None of them dispositions a part — the inspector's look, the control plan and the plant's non-conformance process are the controls that stop them. If one gets through and product has shipped, the part, lot, station and revision held in the record are what the quarantine, the customer notification and the containment sort are built from.

Agent lifecycle

Direction of processing →

  1. 01 · Retrieval

    2 modes

    • QI-01

      Superseded drawing revision

      Compared against a revision the drawing has moved past.

    • QI-02

      Angle the station cannot see

      A defect visible only from a view the cell never captures.

    Stage gathers

    The image, the reading, the plan and the revision

  2. 02 · Reasoning

    1 mode

    • QI-03

      Rare defect class missed

      A class with few labelled examples is not presented at all.

    Stage compares

    The candidate, the tolerance and the control limits

  3. 03 · Record / file

    1 mode

    • QI-04

      Record ties to no part

      The record cannot be pinned to the exact part and station.

    Stage files

    The inspection record, written to the quality system

  4. 04 · Output

    2 modes

    • QI-05

      Reading without gauge capability

      A measurement reported as if the gauge had been studied.

    • QI-06

      False rejects train waving through

      So much is flagged that inspectors stop looking properly.

    Stage presents

    The candidate and the evidence the inspector reads

  5. 05 · Change / Version

    1 mode

    • QI-07

      Drift after a rebuild

      New lighting, fixture or material moves the station quietly.

    Stage tracks

    Model, threshold, control-plan and station changes

  • Sev-1 · a defect can reach the customer
  • Sev-2 · the record cannot be relied on
  • Sev-3 · false rejects rise, the flag stops being read
See the complete Manufacturing failure-mode catalogue

Affected slices

Recall is not the same on every defect class

Two parts on the same line are not the same problem. A mature SKU with thousands of labelled examples reads cleanly; a rare class on a first lot after changeover does not. Nestack reports performance by slice, not only in total.

Slice performance — reported separately, not only in aggregate

Illustrative example
SliceFailure rateLiftLift vs. thresholdStatus
Rare defect classes6.6%3.6×Review
First-off after changeover5.0%2.7×Review
New SKU, first lot3.5%1.9×Watch
Mature SKU, settled line1.1%0.6×Normal

Bar: disagreement-rate lift vs. mature-SKU baseline · scale 0–4.0× · tick marks 2.0×

2 of 4 slices over threshold

Evidence-linked improvement

An escape becomes a part the station is measured on

What the inspector overturned, and what a re-inspected sample found, come back as labelled parts the next release has to get right.

Improvement cycle · five stages

Switchback — the path turns at Improve and returns at Learn

  1. 01

    Detect

    Escape and false-reject rates move on a defect class, a SKU or a shift.

  2. 02

    Diagnose

    Traced to the view captured, the reference set, the revision read or a fixture that moved.

  3. 03

    Improve

    The reference set, threshold or station setup changes under your change control, with a named approver.

  4. 04

    Verify

    Re-run against held-out parts from that class, including the ones that escaped, before it is released.

  5. 05

    Learn

    The escaped part is kept as a labelled case and the reason enters the control-plan review.

  6. Learn → Detect

    The return edge. A change to an inspection method is a control-plan change — it is approved and recorded before the station runs on it, not after.

Typical build scope

Twelve workstreams across six weeks

The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, station and plan access, candidates and records, evaluation, integration, then supervised running and handover.

Workstream

Week 1Week 2Week 3Week 4Week 5Week 6

  1. 01Inspection-workflow discovery and boundaries.Week 1
  2. 02Control plan and drawing-characteristic mapping.Week 1, Week 2
  3. 03Station, gauge and MES access assessment.Week 1, Week 2
  4. 04Part, lot and station traceability keys.Week 2
  5. 05Image and measurement ingestion per station.Week 2, Week 3
  6. 06Reference defect library, labelled with your QA.Week 2, Week 3
  7. 07Candidate presentation and evidence assembly.Week 3, Week 4
  8. 08Revision-currency and gauge-capability gates.Week 4
  9. 09Control-limit and drift monitoring.Week 4, Week 5
  10. 10Evaluation suite and held-out defect classes.Week 4, Week 5
  11. 11Inspection-record write-back and routing.Week 5, Week 6
  12. 12Observability, deployment and Agent Care handover.Week 6

12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel

Final scope and sequence confirmed in discovery

Engagement tiers

What each tier includes

Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.

Capability✓ in scope · — not at this tierPilotOne station, one part familyProductionProduction quality-system integrationAdvancedMulti-line / multi-site
Introduced at Pilot
Candidate defects presented with evidence✓✓✓
Comparison against your control plan✓✓✓
Drawing-revision currency checks✓✓✓
Dimensional checks and gauge-capability gates✓✓✓
Disposition by a qualified person✓✓✓
Baseline evaluation✓✓✓
Introduced at Production
Control-limit and drift monitoring—✓✓
Inspection-record assembly and write-back—✓✓
Observability and evaluation—✓✓
Introduced at Advanced
Per-defect-class and changeover slices——✓
Multi-line and enterprise controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build price
Confirmed after discovery based on stations and part families in scope, control-plan complexity, quality-system and gauge integrations, labelling effort and deployment requirements.
Separate from build
Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.

What we need from you

What you bring, and what we build with it

Each input maps to a piece of build scope and a week in the delivery timeline.

  1. 01Your control plan and the drawing characteristics it names

    Control plan and drawing-characteristic mapping

    Week 1
  2. 02Access to station images, gauges, CMM output and the MES

    Station, gauge and MES data-access assessment

    Week 2
  3. 03How a part, lot and station are identified on the floor today

    Part, lot and station traceability keys

    Week 2
  4. 04Labelled examples of the defects you actually see, rare ones included

    Reference defect library, labelled with your QA

    Week 3
  5. 05Your gauge register, calibration status and MSA studies

    Revision-currency and gauge-capability gates

    Week 4
  6. 06Escapes and false rejects from the last year, with the parts if you kept them

    Evaluation suite, held-out defect classes and failure-mode testing

    Week 4
  7. 07Named inspectors and a quality engineer who dispositions

    Routing and inspection-record workflow, then supervised running

    Weeks 5–6

Nothing else is required

Deployment, documentation and Agent Care handover are ours.

Delivery timeline

Four phases across six weeks

Phases are drawn over the weeks they actually occupy. Week 5 carries both the held-out defect classes and the first parts your inspectors disposition from.

Phase

W1

W2

W3

W4

W5

W6

  1. DiscoveryW1
  2. BuildW2 – W3
  3. EvaluateW4 – W5
  4. Pilot & LaunchW5 – W6

Week focus

W1Inspection-workflow discovery, control plan and drawing characteristics

W2Station, gauge and MES access, then part and lot traceability keys

W3Reference defect library, candidate presentation and evidence assembly

W4Evaluation suite, per-defect-class recall and gauge-capability gates

W5Held-out defect classes, first supervised parts and targeted corrections

W6Your inspectors disposition from the station, then Agent Care starts

Reading the band
Per-defect-class recall, rare classes included, is tested in week 4 — before any candidate is put in front of an inspector in week 5.
At the end of W6
The station has run alongside your existing inspection and been read by the inspectors who disposition from it, then Agent Care takes over monitoring.
Duration
Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.

Next step · Manufacturing AI agent

Build an inspection copilot around your control plan.

Show us one part family, its control plan and drawing characteristics, and the escapes and false rejects you have on file. We'll run your own parts past one station, report recall per defect class including the rare ones, and show you the record an inspector would sign.

Typical delivery
4–6 weeks
Deployment
Your quality stack
Disposition
A qualified person, always
After launch
Agent Care available

Nestack Agents · Quality-inspection copilot

AGT-MFG-02 · Agent Care available after launch

Build an inspection copilot

Four questions so the call starts from your actual setup — then pick a time that suits you.

About you
Your setup

No obligation. We’ll map the workflow, name the automation boundary and tell you if an agent is the wrong answer.