Production-Schedule Copilot (Shooting Schedule)
Board the shoot against cast holds, location and permit windows, daylight and company moves — with child-performer hours, crew turnaround and rest checked as limits, and the first AD locking the day.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Who commits
- First AD
- After launch
- Agent Care
What this agent does
Builds the board, not the call sheet
In
- 01
Take the script breakdown, the scene strips, page counts and the shoot days from your scheduling software.
- 02
Read cast availability and holds, location and permit windows, the daylight table and the weather forecast.
Reason
- 03
Order strips into days by location and unit, with daylight, travel and company moves priced into each day.
- 04
Check each day against child-performer hours and schooling, crew turnaround, rest and the meal clock.
- 05
Carry the day-out-of-days forward — who is held, who is dropped and what a move costs in cast days.
Decide
- 06
Hold any day that touches a child's hours, a turnaround or a permit condition for a person to decide.
- 07
Route stunt days, special equipment, night work and minors' calls to the first AD and the line producer.
Out
- 08
Present the board with what it costs — cast days held, company moves, overtime exposure and what slipped.
- 09
Retain the strips read, the limit that bound each day, the options rejected and every change the AD made.
Product statement
The agent boards and re-boards inside limits a person set. Locking the schedule, booking talent, committing spend and issuing the call sheet stay with the first AD and the line producer.
Example workflow
One re-board, end to end
- 1Re-board triggeredA location lost, an actor unavailable, weather turning, a scene added or a day that ran long
- 2Elements gatheredScene strips, page counts, cast day-out-of-days and holds, location and permit windows, and the daylight table
- 3Days orderedStrips grouped by location and unit, sunrise and sunset priced in, and company moves given the time they take
- 4Limits checkedChild-performer hours and schooling, crew turnaround and rest, the meal clock, permit conditions and stunt days
No human action required
Stages 1 to 4 run without a person in the loop — the elements are gathered, the days ordered and the limits checked before the first AD is asked to read anything. A day that touches a minor's hours or a turnaround ends that stretch on the spot.
Goes to the first AD as a proposed board.
Held with the limit named, not boarded.
First AD and line producer
Reads the board, the limit that bound each day and what the change costs in cast days and moves, then edits it and locks the schedule the unit shoots.
Lock the day · Re-board · Send back
Locked — handed back
- 6Board handed to the first ADWritten to the scheduling system only after the first AD locks it; the agent issues no call sheet
- 7Shoot day reconciledScenes and pages completed against the board, turnaround actually given, meal penalties and minors' hours by day
Edits
What the first AD changes on the board is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Committing the board the unit shoots.
- Issuing, changing or releasing a call sheet.
- Booking, holding, dropping or releasing a performer.
- Approving overtime, a sixth day or extra units.
Automation boundary
Agent acts unaided
- ✓Order scene strips into days by location, unit and daylight.
- ✓Price company moves, travel and page counts into the day.
- ✓Check each day against the limits and name the one that binds.
- ✓Carry the day-out-of-days and show what a move costs in cast days.
Write actions run only inside the approval boundaries agreed during implementation. The call sheet is not one of them.
- Any day that touches a child-performer limit.
- Reducing a turnaround or calling a forced call.
- Agreeing a permit condition, closure or exception.
- Setting a stunt, effects or special-equipment day.
Example output
One re-board after a lost location, annotated
Everything the agent proposes is attached to the strips, holds and windows it was built from.
Board output · one re-board on one change
Illustrative example- Change
- Location lost, day 14
- Day 14 cast
- 3 held, 1 minor
- Last wrap
- 22:10
- Proposed
- Swap days 14 and 17
- Confidence
- 87%
- Call sheet
- Not issued by the agent
As received
The change as production sent it, the cast held that day and last night's wrap.
Evidence used
- Cover set holds the cast
- School day for the minor
- Turnaround from 22:10
Why this swap
Day 17 holds the same cast indoors, and the minor's scenes land inside their hours.
What the score decides
Confidence rates the match, not the day. Limits are checked against the rule, not scored.
Action
Lock the dayRe-boardSend backValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every shoot day
From the breakdown, the board and the changes
Board against your own constraints
Use the cast holds, location and permit windows, the daylight table, unit moves and the limits your agreements set.
Rebuild the week before the morning
A lost location or an actor who cannot travel comes back as a re-boarded week with the moves, the holds and the page counts already worked.
Name the limit while it can still move
A minor's hours, a turnaround, a meal clock or a permit condition the board would run into is raised before the day is called, not after.
Build an evidence trail
Retain the strips read, the constraints applied, the limits checked, the options rejected, the confidence and the AD's edit — on both paths.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Scheduling & boards
- Movie Magic Scheduling
- Yamdu
- StudioBinder
- Gorilla Scheduling
Script & breakdown
- Final Draft
- script revisions
- Breakdown sheets
- page counts
Cast & crew
- Deal memos
- availability holds
- Crew calendars
- minors' permits
Agent
Production schedule & stripboard
- Boards the days
- Checks the limits
- Holds the exceptions
Locations & conditions
- Location records
- film permits
- Sunrise and sunset tables
- weather feeds
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six layers between the model and the board
Each control wraps the one inside it. A board clears every layer before the first AD reads it, and the call sheet sits outside all six.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Decide whether a day may be worked at all
- L3
- Decides what the location will allow
- L4 – L5
- Keep the call sheet with a person, trail intact
- L6
- Pulls automation back when signals degrade
How Nestack evaluates it
Evaluate the board and the limits it was checked against.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the board the first AD opens
- E1Final-output evaluationDid the boarded day hold when the unit came to shoot it?
- E2Step-level evaluationDid it read the right hold, window, daylight and page count?
- E3Tool evaluationDid it read and write the correct strip, day and unit?
- E4Limit recallWas a child-hour, turnaround or permit breach caught before the day?
- E5Slice evaluationHow does the board hold across units, locations and day types?
- E6Business outcomeHow much of the board was re-boarded, and what did it cost?
Floor — the day the unit actually shoots
Failure modes
Where each failure originates in the agent
Seven failure modes plotted against the five stages of the agent lifecycle. None locks a board or issues a call sheet. If one reaches a called day, the record behind it is what the re-board and the notices to cast and crew are built from.
Agent lifecycle
Direction of processing →
01 · Elements
2 modes
- SH-01
Cast hold gone stale
An actor released elsewhere still reads as held.
- SH-02
Permit condition missed
The day runs past the hours the permit allows.
Stage gathers
Strips, cast holds, locations, permits and daylight
02 · Boarding
1 mode
- SH-03
Move eats the day's light
The move runs long and the exterior loses the sun.
Stage orders
Strips into days against location, unit and light
03 · Limit check
2 modes
- SH-04
Minor's hours read wrong
A school day is boarded as a school holiday.
- SH-05
Forced call on the flip
Night to day leaves less rest than the agreement sets.
Stage checks
Child hours, turnaround, permits and the meal clock
04 · Handover / write
1 mode
- SH-06
Draft board taken as final
Departments work to a board nobody locked.
Stage presents
The board the first AD reads before locking it
05 · Change / Version
1 mode
- SH-07
Rule set behind the agreement
A renegotiated rest term is not in the checks.
Stage tracks
Model, prompt, rule and agreement-version changes
- Sev-1 · a statutory or agreement limit is breached
- Sev-2 · the day cannot be shot as boarded
- Sev-3 · the day overruns and costs the unit
Affected slices
The days with limits on them carry the re-boards
A schedule that holds overall still falls over on the days carrying a minor, a night-to-day flip or a company move. Those days are where the first AD re-boards. Nestack reports performance by slice, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Days with minors | 4.0% | 2.7× | Review | |
| Night exteriors and flips | 3.3% | 2.2× | Review | |
| Company-move days | 2.7% | 1.8× | Watch | |
| Settled interior stage days | 1.0% | 0.7× | Normal |
Bar: re-board rate lift vs. settled stage days · scale 0–4.0× · tick marks the 2.0× threshold
2 of 4 slices over threshold
Evidence-linked improvement
A day the unit lost is a constraint the board did not hold
A day that ran long is rarely one bad strip. It is a page count, a move time, a hold or a limit the board never knew about.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Re-boards, slipped pages or overtime climb on a unit, a location or a type of day.
- 02
Diagnose
Traced to a stale hold, a permit condition, a move time, a page count or the limit rule itself.
- 03
Improve
The hold, the move time or the limit rule is corrected with the first AD and the line producer, and version-linked.
- 04
Verify
Re-run against the weeks that slipped, including the days that were re-boarded overnight.
- 05
Learn
The corrected move time goes back to the department it came from, and that week is kept as a board to re-run.
Learn → Detect
The return edge. A limit rule is a legal or agreement change — it is re-read against the agreement in force before a board runs on it.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, strips and access, the limit rules and boarding, evaluation, integration, then parallel boarding and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Scheduling-workflow discovery and boundaries.Week 1
- 02Script breakdown and strip data assessment.Week 1, Week 2
- 03Scheduling-system and calendar access review.Week 1, Week 2
- 04Cast holds, day-out-of-days and deal terms.Week 2
- 05Location, permit and daylight window data.Week 2, Week 3
- 06Child-performer hour and schooling rules.Week 2, Week 3
- 07Turnaround, rest and meal-clock rules.Week 3
- 08Strip ordering, units and company moves.Week 3, Week 4
- 09Evaluation suite and replayed lost days.Week 4, Week 5
- 10First AD review and board-lock workflow.Week 4, Week 5
- 11Scheduling write-back and board delivery.Week 5, Week 6
- 12Observability, deployment and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne unit, one schedule | ProductionProduction scheduling integration | AdvancedMulti-unit / multi-title |
|---|---|---|---|
| Introduced at Pilot | |||
| Proposed board for one unit | ✓ | ✓ | ✓ |
| Child-performer hour and schooling limits | ✓ | ✓ | ✓ |
| Crew turnaround, rest and meal-clock checks | ✓ | ✓ | ✓ |
| Permit and location-window conditions | ✓ | ✓ | ✓ |
| Board locked by the first AD | ✓ | ✓ | ✓ |
| Baseline evaluation | ✓ | ✓ | ✓ |
| Day-out-of-days and cast-hold tracking | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Scheduling-system write-back | — | ✓ | ✓ |
| Observability and slice evaluation | — | ✓ | ✓ |
| Second unit, split days and multi-unit boards | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multi-title and enterprise controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on units and titles in scope, the scheduling systems and calendars integrated, cast and location complexity, the agreements and jurisdictions you shoot under, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your stripboard, the strips and how your shoot days are built
→Script breakdown and strip data assessment
Week 102Access to your scheduling system and unit calendars
→Scheduling-system and calendar access review
Week 103Cast deal terms, holds and the day-out-of-days as it stands
→Cast holds, day-out-of-days and deal terms
Week 204Location list, permit conditions and access windows
→Location, permit and daylight window data
Week 205The agreements in force and the jurisdictions you shoot under
→Child-performer hour rules, then turnaround, rest and meal clock
Week 306The days you lost, and the ones re-boarded overnight
→Evaluation suite, slices and replayed lost days
Week 407Named first ADs and the line producer who locks the board
→First AD review and board-lock workflow, then parallel boarding
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Phases are drawn over the weeks they actually occupy. Week 5 carries both the replayed lost days and the first boards your first AD locks from.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Scheduling workflow, the strips and who locks the board
W2Scheduling access, cast holds and the day-out-of-days
W3Location, permit and daylight data, then the limit rules
W4Strip ordering, company moves and the evaluation suite
W5Replayed lost days and the first boards a first AD reads
W6Boards locked by your first AD, then Agent Care starts
- Reading the band
- The child-hour, turnaround and permit rules are in place by the end of week 3, before the first strip is ordered into a day in week 4.
- At the end of W6
- Boards have been built beside your existing schedule and read by the first AD who locks them, then Agent Care takes over monitoring.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Media AI agent
Build a scheduling agent around your board and your first AD.
Show us a stretch of your board, the holds, permits and daylight behind it, and a week that fell apart. We'll re-board those days on your own holds and windows, and name the limits the week as shot ran into.
- Typical delivery
- 4–6 weeks
- Deployment
- Your scheduling stack
- Who commits
- The first AD and line producer
- After launch
- Agent Care available
Nestack Agents · Production scheduling & boards
AGT-ME-03 · Agent Care available after launch