Telecom AI agent · Device support
Device & Connectivity Troubleshooting AI Agent
Run the configured line and device tests, read the result back with what it does not cover, and give documented non-destructive steps — holding anything that would interrupt the line for an engineer.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Engineer review
- Non-destructive
- After launch
- Agent Care
What this agent does
Tests what it can see, and names what it cannot
In
- 01
When a fault is reported, ingest the line record and service state from supported assurance sources.
- 02
Where the symptom arrives in the customer's own words, normalise it against the documented fault classes.
Reason
- 03
Run the configured read-only line, radio and CPE tests, and record what each one returned.
- 04
When an open outage or planned work already covers the address, match the fault to it first.
- 05
Where the line carries a monitored alarm, a medical alert or telecare equipment, mark it before any step is offered.
Decide
- 06
Where a step would interrupt the line, and with it the ability to reach 911, hold it rather than issue it.
- 07
When the evidence runs out at the demarcation point, say so and route the fault to a named engineer.
Out
- 08
Retain the symptom, the tests run, the steps given and the engineer's decision against the fault.
- 09
Execute write actions only inside the approval boundaries agreed during implementation.
Product statement
The agent tests and proposes steps; a qualified engineer decides what is done to the line, and the carrier stays responsible for the service.
Example workflow
One fault, report to restoration
- 1Fault reportedCare contact, self-service app, assurance alarm or CPE telemetry
- 2Evidence gatheredLine state, sync and error counters, provisioning status and any open outage, each timestamped
- 3Tests run and read backLine and device results, gaps and confidence
- 4Controls appliedContinuity check, life-safety screening, assistive-configuration check, destructive-step bar and confidence threshold
No human action required
Stages 1 to 4 run unaided, and nothing on the line is changed at any of them — the agent is testing, and the engineer's lane opens at the confidence gate.
Goes to the duty engineer to authorise.
Adds a service-continuity read first.
Engineer review
The fault is held with its test results, its flagged risks and the confidence.
Approve · Amend · Escalate to assurance
Approved — released to the customer
- 6Care and assurance systems updatedOnly where write access and approval policy allow it
- 7Outcome evaluatedStep outcomes, repeat faults, engineer amendments and corrections after restoration
Amendments
Every engineer amendment is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Any step that would take the line out of service.
- Factory resets and anything that destroys data.
- Disabling a firewall, encryption or DNS filtering.
- Restoring defaults on an assistive configuration.
Automation boundary
Agent acts unaided
- ✓Run the configured line, radio and CPE tests, read-only.
- ✓Read the results back with what those tests do not cover for the named owner.
- ✓Match the fault against open outages, planned work and history.
- ✓Give documented non-destructive steps, and hold the rest.
Any write happens inside the boundaries agreed at implementation, never ahead of the engineer.
- Steps on a monitored alarm or medical alert line.
- Wiring, an ONT or anything past the demarcation.
- Dispatching an engineer or booking a field visit.
- Changes to test, threshold or escalation rules.
Example output
One fault, annotated
Everything the agent proposes is attached to the tests it was drawn from.
Diagnostic output · single fault
Illustrative example- Fault
- Broadband fault
- Reported symptom
- Drop-outs each evening, wired and wireless alike
- Line state
- In service, sync held
- Test source
- Configured line test
- Confidence
- 84%
- Continuity
- Line held through the tests
As received
Taken from the line record and the configured tests — nothing on this side is written by the agent.
Evidence used
- Line test result
- CPE telemetry
- Open-outage check
Why this step
It changes nothing on the line — the reason it can be given without an engineer.
What the score decides
Below the configured threshold the fault picks up a continuity read before it.
Action
ApproveAmendEscalate to assuranceValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every fault
From the line record
Test what the network shows
Draw on line state, CPE telemetry, provisioning status and the open-outage picture.
Test the line, keep the call
Routine line and device checks are run before anyone is asked to try anything.
Send the risk to an engineer
Continuity risk, life-safety lines and faults past the demarcation point are marked, so an engineer's time starts where the agent cannot see.
Build an evidence trail
The symptom, the tests run against it and the engineer who took it over stay on the fault.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Assurance and line test
- TR-069
- TR-369 / USP
- Nokia
- Ericsson assurance
Care platform
- Salesforce
- Zendesk
- ServiceNow
- Genesys
Subscriber and CPE records
- Amdocs
- Netcracker
- Device and SIM inventory
Agent
Device & connectivity troubleshooting
- Reads the line
- Runs the tests
- Holds for an engineer
Workforce and outage
- Field service
- scheduling
- Outage and incident systems
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six layers between the model and the line
Every layer wraps the next. What none of them catches is in the map below.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether a step may be given
- L3
- Puts the release in an engineer's hands
- L4 – L5
- Hold the tests the diagnosis rested on
- L6
- Falls back to line status when signals degrade
How Nestack evaluates it
Evaluate the whole fault path — not only the step that was given.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the step the customer is given
- E1Final-output evaluationDid the step match what the tests actually returned?
- E2Step-level evaluationDid the agent use the right line record, test set and escalation rules?
- E3Tool evaluationDid it read the correct line and run the correct test?
- E4Confidence calibrationDo low-confidence faults actually attract more engineer amendments?
- E5Slice evaluationHow does performance change across specific fault classes?
- E6Business outcomeHow many faults came back after the customer was told the line was fine?
Floor — whether the line still carries a call
Failure modes
Where each failure originates in the agent
Seven ways a diagnosis goes wrong, by stage.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- XC-03
Stale line telemetry
Line state read from a cached or superseded test.
Stage gathers
Line record, CPE telemetry, outage feed and test rules
02 · Reasoning
2 modes
- XC-04
Overconfident cause
A partial test becomes a definite cause for the fault.
- XC-06
Continuity rule bypassed
A step is offered that would take the line out of service.
Stage proposes
Line and device results, gaps and confidence
03 · Tool / write
2 modes
- XC-02
Life-safety line missed
A monitored alarm or medical alert line is not screened.
- XC-05
Assistive setting reset
A telecoil, TTY or captions setting is cleared by a step.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- XC-01
Beyond-demarcation fault
A fault past the demarcation point is answered anyway.
Stage returns
The steps the engineer approves and
05 · Change / Version
1 mode
- XC-07
Silent step-list regression
A model or rule change widens what the agent will instruct.
Stage tracks
Model, prompt, test rules and escalation config
- Sev-1 · a step runs outside the boundary
- Sev-2 · service and 911 interrupted unwarned
- Sev-3 · telemetry degrades, fault routes to review
Affected slices
Overall health can hide a concentrated harm
Break the engineer-takeover rate down by fault class before reading it as healthy. A few cohorts absorb most of the takeovers The cohorts that carry it are named, not averaged away..
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Alarm and medical alert lines | 6.8% | 3.7× | Review | |
| Faults past the demarcation point | 5.2% | 2.8× | Review | |
| Assistive and relayed contacts | 3.5% | 1.9× | Watch | |
| Single-device, in-service faults | 1.5% | 0.8× | Normal |
Bar: engineer-takeover-rate lift vs. in-service-fault baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
The loop closes on a case, not a cause
The loop shuts when the miss is a case in the suite Each cycle leaves the next one a harder test to pass..
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Engineer-takeover rate rises in a fault class.
- 02
Diagnose
Pull the faults and the tests behind them until the cause narrows to one.
- 03
Improve
Whatever changes ships against a version, with the faults that prompted it attached.
- 04
Verify
Nothing ships until the affected cases pass a second time.
- 05
Learn
The suite grows by one case; so does the safe-step list.
Learn → Detect
The return edge. The next pass is measured against a suite that grew.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, test workflow, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Fault workflow discovery and automation-boundary definition.Week 1
- 02Assurance and CPE source assessment.Week 1, Week 2
- 03Continuity, life-safety and escalation rule mapping.Week 1, Week 2
- 04Line-record ingestion and normalisation.Week 2
- 05Test orchestration and result binding.Week 2, Week 3
- 06Confidence scoring and held-step routing.Week 3
- 07Engineer review workflow.Week 3, Week 4
- 08Care and assurance system integration.Week 5
- 09Service-continuity cases.Week 4, Week 5
- 10Guardrails and escalation controls.Week 4
- 11Fault-trail instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne network, one queue | ProductionProduction assurance systems | AdvancedMultiple networks / markets |
|---|---|---|---|
| Introduced at Pilot | |||
| Testing to your line and rules | ✓ | ✓ | ✓ |
| Engineer approval | ✓ | ✓ | ✓ |
| Diagnosis-consistency baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by fault class | — | ✓ | ✓ |
| Review workflow in your systems | — | ✓ | ✓ |
| Approved write-back | — | ✓ | ✓ |
| Assurance-system integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multi-network and multi-vendor rules | — | — | ✓ |
| Multi-stage engineer approvals | — | — | ✓ |
| High fault volume | — | — | ✓ |
| Multi-network diagnostic controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your line records and CPE inventory
→Line-record ingestion and fault mapping
Week 102Representative closed fault tickets
→Test orchestration baseline and result binding
Week 203Your documented safe-step list and escalation rules
→Continuity, life-safety and escalation rule mapping
Week 104Access to relevant APIs, feeds or exports
→Assurance and CPE assessment, then integration setup
Week 205Steps you would not want a customer to take
→Continuity cases and failure-mode testing
Week 406Where a step must stop and wait for an engineer
→Confidence scoring, held-step routing, guardrails and approval controls
Week 307Named engineers to review held faults
→Engineer review workflow, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
The bands follow real work rather than a plan, so evaluation and pilot genuinely share the fifth week.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Fault workflow discovery, safe-step mapping and the automation boundary
W2Assurance and CPE integration, and the test baseline
W3Test workflow, confidence logic and escalation controls
W4Evaluation suite, continuity guardrails and failure-mode testing
W5Care integration, pilot faults and targeted corrections
W6A live fault queue worked under supervision, then Agent Care handover
- Reading the band
- Each bar spans the weeks its work is named in and no others. The fifth week genuinely carries two.
- At the end of W6
- Once the queue validates, Agent Care owns the running agent.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Telecom AI agent
Build a troubleshooting agent around your service-continuity rules.
Show us your line tests, your safe-step list and who takes a fault over. If you name the lines carrying alarm or medical equipment, we'll draw the boundary around those first.
- Typical delivery
- 4–6 weeks
- Deployment
- Your assurance stack
- Engineer review
- Non-destructive
- After launch
- Agent Care available
Nestack Agents · Device & connectivity troubleshooting
AGT-TL-03 · Agent Care available after launch
