Telecom AI agent · Device support

Device & Connectivity Troubleshooting AI Agent

Run the configured line and device tests, read the result back with what it does not cover, and give documented non-destructive steps — holding anything that would interrupt the line for an engineer.

Typical delivery
4–6 weeks
Deployment
Your stack
Engineer review
Non-destructive
After launch
Agent Care

What this agent does

Tests what it can see, and names what it cannot

In

  1. 01

    When a fault is reported, ingest the line record and service state from supported assurance sources.

  2. 02

    Where the symptom arrives in the customer's own words, normalise it against the documented fault classes.

Reason

  1. 03

    Run the configured read-only line, radio and CPE tests, and record what each one returned.

  2. 04

    When an open outage or planned work already covers the address, match the fault to it first.

  3. 05

    Where the line carries a monitored alarm, a medical alert or telecare equipment, mark it before any step is offered.

Decide

  1. 06

    Where a step would interrupt the line, and with it the ability to reach 911, hold it rather than issue it.

  2. 07

    When the evidence runs out at the demarcation point, say so and route the fault to a named engineer.

Out

  1. 08

    Retain the symptom, the tests run, the steps given and the engineer's decision against the fault.

  2. 09

    Execute write actions only inside the approval boundaries agreed during implementation.

Product statement

The agent tests and proposes steps; a qualified engineer decides what is done to the line, and the carrier stays responsible for the service.

Example workflow

One fault, report to restoration

  1. 1Fault reportedCare contact, self-service app, assurance alarm or CPE telemetry
  2. 2Evidence gatheredLine state, sync and error counters, provisioning status and any open outage, each timestamped
  3. 3Tests run and read backLine and device results, gaps and confidence
  4. 4Controls appliedContinuity check, life-safety screening, assistive-configuration check, destructive-step bar and confidence threshold

No human action required

Stages 1 to 4 run unaided, and nothing on the line is changed at any of them — the agent is testing, and the engineer's lane opens at the confidence gate.

5DecisionBranches at the confidence threshold
High confidence

Goes to the duty engineer to authorise.

Low confidence

Adds a service-continuity read first.

Engineer review

The fault is held with its test results, its flagged risks and the confidence.

Approve · Amend · Escalate to assurance

Approved — released to the customer

  1. 6Care and assurance systems updatedOnly where write access and approval policy allow it
  2. 7Outcome evaluatedStep outcomes, repeat faults, engineer amendments and corrections after restoration

Amendments

Every engineer amendment is counted in the evaluation.

What should not run autonomously

Human approval stays in control

Outside the boundary — human approval required

8 items

  • Any step that would take the line out of service.
    • Factory resets and anything that destroys data.
    • Disabling a firewall, encryption or DNS filtering.
    • Restoring defaults on an assistive configuration.
  • Automation boundary

    Agent acts unaided

    • ✓Run the configured line, radio and CPE tests, read-only.
    • ✓Read the results back with what those tests do not cover for the named owner.
    • ✓Match the fault against open outages, planned work and history.
    • ✓Give documented non-destructive steps, and hold the rest.

    Any write happens inside the boundaries agreed at implementation, never ahead of the engineer.

    • Steps on a monitored alarm or medical alert line.
    • Wiring, an ONT or anything past the demarcation.
    • Dispatching an engineer or booking a field visit.
  • Changes to test, threshold or escalation rules.

Example output

One fault, annotated

Everything the agent proposes is attached to the tests it was drawn from.

Diagnostic output · single fault

Illustrative example
Fault
Broadband fault
Reported symptom
Drop-outs each evening, wired and wireless alike
Line state
In service, sync held
Test source
Configured line test
Confidence
84%
Continuity
Line held through the tests

As received

Taken from the line record and the configured tests — nothing on this side is written by the agent.

Evidence used

  • Line test result
  • CPE telemetry
  • Open-outage check

Why this step

It changes nothing on the line — the reason it can be given without an engineer.

What the score decides

Below the configured threshold the fault picks up a continuity read before it.

Action

ApproveAmendEscalate to assurance

Value

Where AI adds value

The same four claims, placed at the point in the workflow where each one applies.

Where the value lands

Value 01 – 04

Every fault

From the line record

03Testing

Test what the network shows

Draw on line state, CPE telemetry, provisioning status and the open-outage picture.

01Approved path

Test the line, keep the call

Routine line and device checks are run before anyone is asked to try anything.

02Human review

Send the risk to an engineer

Continuity risk, life-safety lines and faults past the demarcation point are marked, so an engineer's time starts where the agent cannot see.

04

Build an evidence trail

The symptom, the tests run against it and the engineer who took it over stay on the fault.

Integrations

Typical integrations

Five system groups connect to the same agent. Which of them are in scope is decided in discovery.

  • Assurance and line test

    • TR-069
    • TR-369 / USP
    • Nokia
    • Ericsson assurance
  • Care platform

    • Salesforce
    • Zendesk
    • ServiceNow
    • Genesys
  • Subscriber and CPE records

    • Amdocs
    • Netcracker
    • Device and SIM inventory

Agent

Device & connectivity troubleshooting

  • Reads the line
  • Runs the tests
  • Holds for an engineer
  • Workforce and outage

    • Field service
    • scheduling
    • Outage and incident systems
  • Observability & evaluation

    • OpenTelemetry
    • Langfuse
    • Supported monitoring/evaluation sources

Integration availability depends on the client's existing systems and API access.

Agent controls

Six layers between the model and the line

Every layer wraps the next. What none of them catches is in the map below.

L6 · Outermost — last line of defence

Inward → L1 · closest to the model

L6Rollback / safe modePull the agent back to read-only testing when evaluation or production signals degrade.Roll back
L5Version monitoringTrack model, prompt, test-rule and escalation-configuration changes.Track
L4Fault traceabilityRecord the symptom, the tests, the steps given and the engineer's decision.Record
L3Engineer approvalHold the fault for a named engineer; it governs release, not whether the step works.Gate
L2Continuity guardrailsTest each step against the continuity, life-safety and assistive rules; a failure returns the step.Restrict
L1Confidence thresholdsRoute low-confidence faults to a continuity read before an engineer sees them.Require review
Model coreSteps proposed — line results, what is untested, held steps and confidence
L1 – L2
Test whether a step may be given
L3
Puts the release in an engineer's hands
L4 – L5
Hold the tests the diagnosis rested on
L6
Falls back to line status when signals degrade

How Nestack evaluates it

Evaluate the whole fault path — not only the step that was given.

Coverage runs the whole depth of the workflow, and every layer is cut by slice.

Surface — the step the customer is given

  1. E1Final-output evaluationDid the step match what the tests actually returned?
  2. E2Step-level evaluationDid the agent use the right line record, test set and escalation rules?
  3. E3Tool evaluationDid it read the correct line and run the correct test?
  4. E4Confidence calibrationDo low-confidence faults actually attract more engineer amendments?
  5. E5Slice evaluationHow does performance change across specific fault classes?
  6. E6Business outcomeHow many faults came back after the customer was told the line was fine?

Floor — whether the line still carries a call

Failure modes

Where each failure originates in the agent

Seven ways a diagnosis goes wrong, by stage.

Agent lifecycle

Direction of processing →

  1. 01 · Retrieval

    1 mode

    • XC-03

      Stale line telemetry

      Line state read from a cached or superseded test.

    Stage gathers

    Line record, CPE telemetry, outage feed and test rules

  2. 02 · Reasoning

    2 modes

    • XC-04

      Overconfident cause

      A partial test becomes a definite cause for the fault.

    • XC-06

      Continuity rule bypassed

      A step is offered that would take the line out of service.

    Stage proposes

    Line and device results, gaps and confidence

  3. 03 · Tool / write

    2 modes

    • XC-02

      Life-safety line missed

      A monitored alarm or medical alert line is not screened.

    • XC-05

      Assistive setting reset

      A telecoil, TTY or captions setting is cleared by a step.

    Stage writes

    Only where write access and approval policy allow it

  4. 04 · Output

    1 mode

    • XC-01

      Beyond-demarcation fault

      A fault past the demarcation point is answered anyway.

    Stage returns

    The steps the engineer approves and

  5. 05 · Change / Version

    1 mode

    • XC-07

      Silent step-list regression

      A model or rule change widens what the agent will instruct.

    Stage tracks

    Model, prompt, test rules and escalation config

  • Sev-1 · a step runs outside the boundary
  • Sev-2 · service and 911 interrupted unwarned
  • Sev-3 · telemetry degrades, fault routes to review
See the complete Telecom failure-mode catalogue

Affected slices

Overall health can hide a concentrated harm

Break the engineer-takeover rate down by fault class before reading it as healthy. A few cohorts absorb most of the takeovers The cohorts that carry it are named, not averaged away..

Slice performance — reported separately, not only in aggregate

Illustrative example
SliceFailure rateLiftLift vs. thresholdStatus
Alarm and medical alert lines6.8%3.7×Review
Faults past the demarcation point5.2%2.8×Review
Assistive and relayed contacts3.5%1.9×Watch
Single-device, in-service faults1.5%0.8×Normal

Bar: engineer-takeover-rate lift vs. in-service-fault baseline · scale 0–4.0× · tick marks the 2.0× review threshold

2 of 4 slices over threshold

Evidence-linked improvement

The loop closes on a case, not a cause

The loop shuts when the miss is a case in the suite Each cycle leaves the next one a harder test to pass..

Improvement cycle · five stages

Switchback — the path turns at Improve and returns at Learn

  1. 01

    Detect

    Engineer-takeover rate rises in a fault class.

  2. 02

    Diagnose

    Pull the faults and the tests behind them until the cause narrows to one.

  3. 03

    Improve

    Whatever changes ships against a version, with the faults that prompted it attached.

  4. 04

    Verify

    Nothing ships until the affected cases pass a second time.

  5. 05

    Learn

    The suite grows by one case; so does the safe-step list.

  6. Learn → Detect

    The return edge. The next pass is measured against a suite that grew.

Typical build scope

Twelve workstreams across six weeks

The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, test workflow, evaluation, integration, then production validation and handover.

Workstream

Week 1Week 2Week 3Week 4Week 5Week 6

  1. 01Fault workflow discovery and automation-boundary definition.Week 1
  2. 02Assurance and CPE source assessment.Week 1, Week 2
  3. 03Continuity, life-safety and escalation rule mapping.Week 1, Week 2
  4. 04Line-record ingestion and normalisation.Week 2
  5. 05Test orchestration and result binding.Week 2, Week 3
  6. 06Confidence scoring and held-step routing.Week 3
  7. 07Engineer review workflow.Week 3, Week 4
  8. 08Care and assurance system integration.Week 5
  9. 09Service-continuity cases.Week 4, Week 5
  10. 10Guardrails and escalation controls.Week 4
  11. 11Fault-trail instrumentation.Week 5, Week 6
  12. 12Deployment, documentation and Agent Care handover.Week 6

12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel

Final scope and sequence confirmed in discovery

Engagement tiers

What each tier includes

Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.

Capability✓ in scope · — not at this tierPilotOne network, one queueProductionProduction assurance systemsAdvancedMultiple networks / markets
Introduced at Pilot
Testing to your line and rules✓✓✓
Engineer approval✓✓✓
Diagnosis-consistency baseline✓✓✓
Introduced at Production
Reporting by fault class—✓✓
Review workflow in your systems—✓✓
Approved write-back—✓✓
Assurance-system integration—✓✓
Introduced at Advanced
Multi-network and multi-vendor rules——✓
Multi-stage engineer approvals——✓
High fault volume——✓
Multi-network diagnostic controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build price
Confirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
Separate from build
Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.

What we need from you

What you bring, and what we build with it

Each input maps to a piece of build scope and a week in the delivery timeline.

  1. 01Your line records and CPE inventory

    Line-record ingestion and fault mapping

    Week 1
  2. 02Representative closed fault tickets

    Test orchestration baseline and result binding

    Week 2
  3. 03Your documented safe-step list and escalation rules

    Continuity, life-safety and escalation rule mapping

    Week 1
  4. 04Access to relevant APIs, feeds or exports

    Assurance and CPE assessment, then integration setup

    Week 2
  5. 05Steps you would not want a customer to take

    Continuity cases and failure-mode testing

    Week 4
  6. 06Where a step must stop and wait for an engineer

    Confidence scoring, held-step routing, guardrails and approval controls

    Week 3
  7. 07Named engineers to review held faults

    Engineer review workflow, then pilot and production validation

    Weeks 5–6

Nothing else is required

Deployment, documentation and Agent Care handover are ours.

Delivery timeline

Four phases across six weeks

The bands follow real work rather than a plan, so evaluation and pilot genuinely share the fifth week.

Phase

W1

W2

W3

W4

W5

W6

  1. DiscoveryW1
  2. BuildW2 – W3
  3. EvaluateW4 – W5
  4. Pilot & LaunchW5 – W6

Week focus

W1Fault workflow discovery, safe-step mapping and the automation boundary

W2Assurance and CPE integration, and the test baseline

W3Test workflow, confidence logic and escalation controls

W4Evaluation suite, continuity guardrails and failure-mode testing

W5Care integration, pilot faults and targeted corrections

W6A live fault queue worked under supervision, then Agent Care handover

Reading the band
Each bar spans the weeks its work is named in and no others. The fifth week genuinely carries two.
At the end of W6
Once the queue validates, Agent Care owns the running agent.
Duration
Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.

Next step · Telecom AI agent

Build a troubleshooting agent around your service-continuity rules.

Show us your line tests, your safe-step list and who takes a fault over. If you name the lines carrying alarm or medical equipment, we'll draw the boundary around those first.

Typical delivery
4–6 weeks
Deployment
Your assurance stack
Engineer review
Non-destructive
After launch
Agent Care available

Nestack Agents · Device & connectivity troubleshooting

AGT-TL-03 · Agent Care available after launch

Build a troubleshooting agent

Four questions so the call starts from your actual setup — then pick a time that suits you.

About you
Your network

No obligation. We’ll map the workflow, name the automation boundary and tell you if an agent is the wrong answer.