Telecom AI agent · Number porting
Onboarding & Number-Porting AI Agent
Collect the standard fields for a port in or out, run the configured checks, and hold — a provisioning person decides anything that would delay the port, and the one-business-day clock keeps running.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Desk release
- Interval-bound
- After launch
- Agent Care
What this agent does
Does the order work, not the hold decision
In
- 01
Ingesting the port request and the account record from supported ordering, CRM or LSR sources.
- 02
Normalising the number, account number and zip code into the form the LSR requires, and stamping the interval.
Reason
- 03
Assembling only the simple-port fields 47 CFR 52.36 permits, plus a passcode where the customer was assigned one.
- 04
Applying the carrier's configured onboarding, market and due-date rules to the order.
- 05
Binding each field to the record it was read from, and marking what the account leaves unresolved.
Decide
- 06
Recognising a request that may be a line separation, and routing it to trained staff without scoring it.
- 07
Routing anything that would delay or reject a port to the provisioning desk.
Out
- 08
Retaining the request, the fields it carried, the timestamps and the release.
- 09
Executing write actions only inside the approval boundaries agreed during implementation.
Product statement
The agent prepares and tracks the order; a provisioning person decides any hold, and the carrier remains the party the interval binds.
Example workflow
One port, request to release
- 1Port request receivedOrder portal, retail or care system, or an inbound LSR from the gaining provider
- 2Fields assembledThe standard simple-port fields, an assigned passcode where there is one, and the received timestamp
- 3Order preparedValidated fields, due date and confidence
- 4Controls appliedField-set checks, interval timing, line-separation detection and confidence threshold
No human action required
Stages 1 to 4 run unaided and none of them pauses the interval — the agent is preparing the order, and the desk's lane opens at the confidence gate.
Goes to the provisioning desk to release.
Adds a porting-desk check first.
Provisioning release
The order is held with its fields, its flags and the time left in the interval.
Release · Correct · Send to fraud review
Released — order sent
- 6Order systems updatedOnly where write access and approval policy allow it
- 7Outcome evaluatedInterval performance, desk corrections, rejections and ports put right after release
Corrections
Every desk correction is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Holding a port, or delaying one past the interval.
- Requiring any field outside the closed standard set.
- Surfacing an account balance inside the port flow.
- Actioning a line-separation request from a survivor.
Automation boundary
Agent acts unaided
- ✓Collect the standard simple-port fields the rule permits.
- ✓Validate the fields for form, and carry each source forward for the named owner.
- ✓Run the checks the carrier has configured for the market.
- ✓Flag what a person must decide, stop there, and show the time left.
Any write happens inside the boundaries agreed at implementation, never ahead of a release.
- Standing in as the third-party verifier of a change.
- Placing any offer on the authorisation screen.
- Returning a rejection to the gaining provider.
- Changes to field, interval or authorisation rules.
Example output
One port order, annotated
Everything the agent puts on the order is attached to the record it was read from.
Port-order output · single request
Illustrative example- Order
- Simple port-out
- Request
- Number, account number and zip code taken from the account record
- Due date
- Next business day
- Field set
- Standard fields only
- Confidence
- 94%
- Authorisation
- Separate LOA screen
As received
Taken from the account record and the inbound LSR — nothing on this side is supplied by the agent.
Fields used
- Account record match
- Assigned passcode
- Received timestamp
Why these fields
The rule closes the list and a person still decides and it is logged..
What the score decides
Below the configured threshold the order picks up a desk check before anyone releases it.
Action
ReleaseCorrectSend to fraud reviewValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every port request
From the order or the LSR
Build from the record
Use the account record, the closed standard field set and the carrier's configured market and interval rules.
Port on the clock, not on a hunch
Routine simple ports arrive validated and already inside the interval.
Send the desk to what needs deciding
Flagged orders and low-confidence requests are marked, so the desk's time goes where a decision is actually owed.
Build an evidence trail
The request, the fields it carried and the person who released it stay on the order.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Porting and numbering
- LSR gateway
- NPAC feed
- ATIS LSOG order formats
BSS / OSS
- Amdocs
- Netcracker
- CSG
- Optiva
- in-house billing
CRM and care
- Salesforce
- Dynamics 365
- Zendesk
- ServiceNow
Agent
Onboarding & number porting
- Reads the record
- Builds the order
- Stops for release
Identity and authorisation
- LOA capture
- e-signature
- Independent TPV
- IVR authorisation
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six layers between the model and the port order
Controls stack inward. What the stack does not catch is set out in the map below.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether an order may stand
- L3
- Puts the release in a person's hands
- L4 – L5
- Keep the request and the fields it carried
- L6
- Narrows to status reporting when signals degrade
How Nestack evaluates it
Evaluate the whole porting workflow — not only the completed port.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the order the customer sees
- E1Final-output evaluationDid the order carry only the fields the rule permits?
- E2Step-level evaluationDid the agent read the right account, market rules and interval configuration?
- E3Tool evaluationDid it read and write the correct order and the correct field?
- E4Confidence calibrationDo low-confidence orders actually attract more desk corrections?
- E5Slice evaluationHow does performance change across specific order types?
- E6Business outcomeHow many orders needed a desk correction, and how many were put right after release?
Floor — whether the number arrived on time
Failure modes
Where each failure originates in the agent
Seven failure modes, placed at the stage each one originates.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- VP-03
Stale account record
Passcode or account number read from a superseded record.
Stage gathers
Account record, assigned passcode
02 · Reasoning
2 modes
- VP-04
Survivor read as attacker
A line-separation request scores as a port-out fraud signal.
- VP-06
Interval consumed by review
Verification work eats the business day the rule allows.
Stage proposes
The order, its fields and the confidence
03 · Tool / write
2 modes
- VP-02
Balance surfaced in the flow
An outstanding balance appears inside the port conversation.
- VP-05
Authorisation voided by offer
An inducement lands on the authorisation screen.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- VP-01
Unauthorised required field
The order asks for something outside the closed standard set.
Stage returns
The order the desk releases and the gaining carrier sees
05 · Change / Version
1 mode
- VP-07
Silent interval regression
A model or rule change slows the path to release.
Stage tracks
Model, prompt, field rules and interval config
- Sev-1 · a port is delayed
- Sev-2 · an unpermitted field is required
- Sev-3 · record degrades, order routes to the desk
Affected slices
Overall timing can hide one bad cohort
Survivors are the cohort no aggregate counts: a line-separation request is confidential by law, so it never appears in a fraud or retention report. Nestack reports the desk-correction rate by slice, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Line-separation requests | 7.0% | 3.4× | Review | |
| Ports with a disputed balance | 4.5% | 2.2× | Review | |
| Non-simple and multi-line ports | 3.3% | 1.6× | Watch | |
| Standard simple ports | 1.2% | 0.6× | Normal |
Bar: desk-correction-rate lift vs. the all-orders baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
The cycle ends in a case, not a note
An apology does not close a cycle; a case the next release must pass does. That suite is what the next port through the desk is measured against.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Desk-correction rate rises in an order slice.
- 02
Diagnose
Within the same business day, the desk reads the orders behind the rise until the cause narrows to one.
- 03
Improve
The correction is versioned, with the orders that motivated it attached.
- 04
Verify
A failing case holds the release until it passes.
- 05
Learn
The case is added permanently, and the port rules move with it.
Learn → Detect
The return edge. The next cycle is measured against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, order workflow, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Porting workflow discovery and automation-boundary definition.Week 1
- 02Order and LSR source assessment.Week 1, Week 2
- 03Standard field-set and interval-rule mapping for each market.Week 1, Week 2
- 04Order ingestion and field normalisation.Week 2
- 05Validation logic and record binding.Week 2, Week 3
- 06Confidence scoring and desk routing.Week 3
- 07Provisioning release workflow.Week 3, Week 4
- 08Order-management and LSR integration.Week 5
- 09Port-interval and field cases.Week 4, Week 5
- 10Guardrails and authorisation controls.Week 4
- 11Order-trail instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne market, one order path | ProductionProduction order systems | AdvancedMultiple markets / brands |
|---|---|---|---|
| Introduced at Pilot | |||
| Order preparation on your rules | ✓ | ✓ | ✓ |
| Provisioning release | ✓ | ✓ | ✓ |
| Port-completion baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by order type | — | ✓ | ✓ |
| Desk workflow in your systems | — | ✓ | ✓ |
| Approved write-back | — | ✓ | ✓ |
| Order-management integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multi-market interval rules | — | — | ✓ |
| Multi-stage provisioning approvals | — | — | ✓ |
| High port volume | — | — | ✓ |
| Multi-market porting controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your order intake fields and account record structure
→Order ingestion and field mapping
Week 102Representative completed port orders
→Validation baseline, field-set extraction and record binding
Week 203Your market rules and assigned-passcode policy
→Field-set, interval and market-rule mapping
Week 104Access to relevant APIs, feeds or exports
→Order and LSR assessment, then integration setup
Week 205Ports you would not want delayed
→Interval cases and the evaluation suite
Week 406What must reach a person before a port is held
→Confidence scoring, desk routing, guardrails and release controls
Week 307Named provisioning staff to release orders
→Provisioning release workflow, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Each band covers the weeks the work really takes, so week 5 carries evaluation and launch together.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Porting workflow discovery, field mapping and the automation boundary
W2Order and LSR integration and the validation baseline
W3Order workflow, confidence logic and release controls
W4Evaluation suite, interval checks and failure-mode testing
W5Order-system integration, pilot ports and targeted corrections
W6One porting cycle run under the provisioning desk, then handover
- Reading the band
- Each band spans only the weeks its work is named in. The fifth week genuinely carries two kinds of work.
- At the end of W6
- Validation finishes on live orders and Agent Care assumes monitoring.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Telecom AI agent
Build a porting agent around the interval you are already bound by.
Show us your order path, your field set and who releases a port. Get it wrong and the delay is itself the violation — so we map the boundary and name what stays with a person.
- Typical delivery
- 4–6 weeks
- Deployment
- Your order stack
- Desk release
- Interval-bound
- After launch
- Agent Care available
Nestack Agents · Onboarding & number porting
AGT-TL-04 · Agent Care available after launch
