Telecom AI agent · Network remediation
Self-Healing Network Remediation AI Agent
Detect the fault, diagnose it within the configured scope, and propose a change with its blast radius and its reversion plan — then hold, because applying it is a network engineer's decision.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Change approval
- Peer-reviewed
- After launch
- Agent Care
What this agent does
Proposes the change, does not apply it
In
- 01
Telemetry, alarms and configuration state arrive from supported assurance and orchestration.
- 02
Element names, alarm codes and timestamps are normalised, and each signal keeps the path it arrived on.
Reason
- 03
A fault hypothesis is formed inside the domain and the elements the agent has been scoped to.
- 04
The carrier's change rules, maintenance windows and freeze periods are applied to whatever is proposed.
- 05
Blast radius is computed for the proposed change — the elements, services and paths it would touch.
Decide
- 06
911, 988 and special-facility paths sit outside the action space, as an exclusion rather than a setting.
- 07
The proposal is routed to a named network engineer for peer review and authorisation.
Out
- 08
The state it read, the change it wrote, the review and the authorisation are retained against the incident.
- 09
Write actions run only inside the approval boundaries agreed during implementation.
Product statement
The agent proposes a change; a network engineer peer-reviews and authorises it, and the carrier stays the party answerable to its regulator.
Example workflow
One fault, alarm to authorised change
- 1Fault detectedAssurance alarms, performance counters, probes or ticket intake
- 2State assembledTopology, running configuration, recent changes and the freeze calendar, each with its source
- 3Change proposedChange, blast radius, reversion, confidence
- 4Controls appliedScope checks, the 911-path exclusion, the blast-radius limit, freeze-window checks and confidence threshold
No human action required
Stages 1 to 4 run unaided and change nothing — the agent is proposing, and the engineer's lane opens at the confidence gate.
Goes to the duty network engineer to authorise.
Adds a second engineer's peer review first.
Change approval
The change is held with the state it was written against, its blast radius and the confidence.
Authorise · Amend · Send to change board
Authorised — staged for application
- 6Change applied in stagesOnly where write access and the change process allow it
- 7Outcome evaluatedService-level recovery, reversions, escalations and post-change incidents
Amendments
Every engineer amendment is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Anything on a 911, 988 or special-facility path.
- Applying any change to the production network.
- Any change beyond the configured blast radius.
- Acting in a declared incident without the commander.
Automation boundary
Agent acts unaided
- ✓Detect a fault and correlate the alarms it raised.
- ✓Diagnose within the domain and the elements it has been scoped to.
- ✓Propose a change with its blast radius and its reversion plan.
- ✓Hold the proposal for a named engineer, with the evidence attached.
Any write happens inside the boundaries agreed at implementation, never ahead of authorisation.
- Reverting a change outside the bounded scope.
- Declaring the fault cleared or the service restored.
- Changes crossing into a partner or third-party domain.
- Changes to its own thresholds, scope or radius limits.
Example output
One proposed change, annotated
Everything the agent proposes is attached to the state it was read from.
Remediation output · single proposal
Illustrative example- Element
- Edge router, metro ring
- Proposed action
- Restore the ring-facing link weighting to its peer-reviewed value
- Blast radius
- Single metro ring
- State written against
- Reviewed baseline
- Confidence
- 88%
- Reversion
- Prepared, not guaranteed
As received
Taken from the assurance feed and the configuration baseline — nothing on this side is written by the agent.
Evidence used
- Alarm correlation
- Topology and dependency
- Recent change record
Why this change
It restores a value the change record shows was reviewed — the line the engineer weighs.
What the score decides
Below the configured threshold the proposal picks up a second engineer's review before.
Action
AuthoriseAmendSend to change boardValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every detected fault
From the assurance feed
Propose against the state
Draw on topology, the configuration baseline and the change record the carrier already keeps.
A change is still a change
Routine remediations arrive already written, with their blast radius computed.
Send review to the risky changes
Wide-radius and low-confidence proposals are marked, so the engineer's review starts where the exposure is.
Build an evidence trail
The proposed change, its blast radius and the engineer who approved it stay on the record.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Assurance and fault management
- IBM Netcool
- Nokia NSP
- Ericsson EIAP
- Huawei iMaster
Orchestration
- ONAP
- Ansible Automation
- Cisco NSO
- Terraform
Inventory and topology
- NetBox
- Nokia NIM
- Cramer
- Granite
Agent
Self-healing network remediation
- Reads the state
- Proposes the change
- Holds for approval
Change and incident
- ServiceNow
- Jira
- BMC Remedy
- change calendars
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six layers between the model and the network
The controls sit inside one another. What none of them catches is set out below.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether a change may stand
- L3
- Puts the application in an engineer's hands
- L4 – L5
- Keep the change and the state it was written against
- L6
- Narrows to detect-and-propose when signals degrade
How Nestack evaluates it
Evaluate the remediation workflow — not only the change that was applied.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the change the network takes
- E1Final-output evaluationDid the applied change produce the service-level recovery it predicted?
- E2Step-level evaluationDid the agent read the right topology, baseline and change record?
- E3Tool evaluationDid it read and write the correct element and the correct parameter?
- E4Confidence calibrationDo low-confidence proposals actually attract more engineer amendments?
- E5Slice evaluationHow does performance change across specific fault classes?
- E6Business outcomeHow many changes were reverted, escalated or followed by a second incident?
Floor — the state the network is left in
Failure modes
Where each failure originates in the agent
Seven ways a change goes wrong, placed by stage.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- YR-03
Single-pipeline telemetry
State read from one monitoring path that was itself degraded.
Stage gathers
Alarms, topology, configuration baseline and change record
02 · Reasoning
2 modes
- YR-04
Cascade mistaken for cause
The loudest downstream symptom is diagnosed as the fault.
- YR-06
Conflicting closed loops
Two concurrent loops act against each other's remedy.
Stage proposes
Action, blast radius, reversion plan and confidence
03 · Tool / write
2 modes
- YR-02
Blast radius understated
The change reaches elements the estimate did not include.
- YR-05
Reversion leaves a third state
A partly applied change is reverted into neither state.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- YR-01
Recovery load after the fix
Reversion completes while the service is still failing.
Stage returns
The change the engineer authorises and
05 · Change / Version
1 mode
- YR-07
Silent scope regression
A model or rule change widens what the agent will propose.
Stage tracks
Model, prompt, scope rules and radius config
- Sev-1 · applied outside the boundary
- Sev-2 · a wrong change reaches the network
- Sev-3 · telemetry degrades, proposal routes to review
Affected slices
A healthy total can hide one fault class
Base rates are not shared: each fault class carries its own, and one aggregate amendment rate quietly averages them together. Nestack reports the amendment rate by slice, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Core and control-plane faults | 9.6% | 3.5× | Review | |
| Cross-domain transport faults | 5.8% | 2.1× | Review | |
| RAN cell-level degradation | 4.1% | 1.5× | Watch | |
| Single-element access faults | 2.5% | 0.9× | Normal |
Bar: amendment-rate lift vs. single-element access baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
The loop closes on a case, not a cause
The cycle ends when a case exists in the suite, not when the miss was discussed. That suite is what the next change proposed to the network is measured against.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Amendment rate rises in a fault class.
- 02
Diagnose
Not the loudest alarm — an engineer reads the state, the change record and the proposals until the cause narrows to one.
- 03
Improve
Changes carry a version and the incidents that prompted them.
- 04
Verify
Release is held until the affected cases pass.
- 05
Learn
The case is kept permanently, and the change rules move with it.
Learn → Detect
The return edge. The next detection is measured against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, remediation workflow, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Remediation workflow discovery and boundary definition.Week 1
- 02Assurance and orchestration assessment.Week 1, Week 2
- 03Change-process, blast-radius and 911-exclusion mapping.Week 1, Week 2
- 04Telemetry ingestion and normalisation.Week 2
- 05Diagnosis logic and state binding.Week 2, Week 3
- 06Confidence scoring and proposal routing.Week 3
- 07Engineer approval workflow.Week 3, Week 4
- 08Orchestration and change-system integration.Week 5
- 09Blast-radius and rollback cases.Week 4, Week 5
- 10Guardrails and approval controls.Week 4
- 11Change-trail instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne domain, one region | ProductionProduction change process | AdvancedMultiple domains / vendors |
|---|---|---|---|
| Introduced at Pilot | |||
| Proposals against your state and rules | ✓ | ✓ | ✓ |
| Engineer approval | ✓ | ✓ | ✓ |
| Proposal-quality baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by domain and element | — | ✓ | ✓ |
| Change-system workflow integration | — | ✓ | ✓ |
| Authorised change execution | — | ✓ | ✓ |
| Orchestration-stack integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multi-vendor change policies | — | — | ✓ |
| Multi-stage change approvals | — | — | ✓ |
| High change volume | — | — | ✓ |
| Multi-domain change controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, change volume, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your change process and its approval chain
→Change-process mapping and boundary definition
Week 102Representative faults and the changes that cleared them
→Diagnosis baseline, state binding and blast-radius modelling
Week 203Your topology, baseline configuration and freeze calendar
→Blast-radius, freeze-window and 911-exclusion mapping
Week 104Access to assurance, inventory and orchestration APIs
→Assurance and orchestration assessment, then integration setup
Week 205Changes you would not want applied
→Rollback cases and failure-mode testing
Week 406What a change may never touch on its own
→Confidence scoring, scope limits, guardrails and approval controls
Week 307Named network engineers to review proposals
→Engineer approval workflow, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
The bands follow the actual work, which is why the fifth week doubles rather than pads.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Remediation workflow discovery, change mapping and the automation boundary
W2Assurance and orchestration integration, and the diagnosis baseline
W3Proposal workflow, confidence logic and approval controls
W4Evaluation suite, blast-radius checks and failure-mode testing
W5Orchestration integration, pilot changes and targeted corrections
W6One change window run under network engineering, then handover
- Reading the band
- A bar covers the weeks its work is named in, and nothing else. The week 5 overlap is real, not padding.
- At the end of W6
- The window closes validation and Agent Care owns the running agent.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Telecom AI agent
Build a remediation agent around your change process.
Show us your assurance stack, your change process and your freeze calendar. The engineer who signs a change today still signs it after this ships — we map the boundary around that signature.
- Typical delivery
- 4–6 weeks
- Deployment
- Your assurance stack
- Change approval
- Peer-reviewed
- After launch
- Agent Care available
Nestack Agents · Self-healing network remediation
AGT-TL-09 · Agent Care available after launch
