Transportation AI agent · Yard and gate
Yard & Gate Computer-Vision AI Agent
Read container codes, plates and visible damage at the gate, check what arithmetic can check, and leave the identity, the interchange receipt and the movement to a gate officer.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Officer decides
- Read, not ID
- After launch
- Agent Care
What this agent does
Reads the characters, never the person
In
- 01
Where the lanes are configured, take frames from supported OCR portals and yard cameras.
- 02
When a container code is read, recompute the ISO 6346 check digit before the read is carried anywhere.
Reason
- 03
Where the check digit passes, say only what it proved — that the characters are internally consistent.
- 04
When the misread is a letter collision, such as A for K or U, the check digit is blind to it, so the read is marked.
- 05
Where a licence plate is read, carry it as the weaker signal it is, because a plate has no check character at all.
Decide
- 06
Where the model would become face-shaped it stops: codes, plates and seals are read; faces, gait and emotion are not.
- 07
When damage is visible, capture it as evidence towards the interchange receipt, never as a grading or a charge.
Out
- 08
When a read falls below the threshold, route the movement to the gate officer with the frame.
- 09
Where write actions run, they run only inside the approval boundaries agreed during implementation.
Product statement
The agent reads and checks; a gate officer decides what the equipment is, what the receipt says and whether the truck moves.
Example workflow
One gate movement, frame to release
- 1Frame capturedOCR portal, gate kiosk camera, yard camera or handheld capture
- 2Read attemptedContainer code, chassis and plate characters, seal number and visible condition, each with its frame
- 3Checks runRead, check-digit result and confidence
- 4Controls appliedCheck-digit and structural checks, appointment cross-reference, plate-assurance marking and the confidence threshold
No human action required
Stages 1 to 4 run unaided and open no gate — the read is prepared, and the officer's lane opens at the confidence gate.
Goes to the gate officer to accept.
Adds a second frame and a lane read.
Gate officer decides
The read is held with its frame, its check result and the confidence.
Accept · Correct · Send to the lane
Accepted — movement recorded
- 6Yard systems updatedOnly where write access and approval policy allow it
- 7Outcome evaluatedRead corrections, exception volume, damage disputes and movements reworked afterwards
Corrections
Every officer correction is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Deciding that a read is a particular container.
- Chocking, restraining or securing any vehicle.
- Releasing a truck through the gate on a read alone.
- Signing or closing an equipment interchange receipt.
Automation boundary
Agent acts unaided
- ✓Read container, chassis and plate characters from the frame.
- ✓Recompute the ISO 6346 check digit and report what it proved.
- ✓Cross-reference a read against the appointment and.
- ✓Capture visible damage as evidence and hold it for.
Any write happens inside the boundaries agreed at implementation, never ahead of the officer.
- Grading damage or deciding who is charged for it.
- Matching a face, a body or a gait to a person.
- Setting or lifting a retention or litigation hold.
- Changes to gate rules, thresholds or access controls.
Example output
One gate read, annotated
Everything the agent reads is attached to the frame it was read from.
Gate read output · single movement
Illustrative example- Movement
- Inbound container
- Characters read
- Owner code, category identifier and serial, as read off the box
- Check digit
- Recomputed, consistent
- Frame reference
- Lane 3 camera, frame 2
- Confidence
- 93%
- Status
- Held for the gate officer
As received
Taken from the frame as captured and the arithmetic run over it — nothing on this side is an identification.
What the check proves
- The characters are consistent
- Position four is valid
- Serial substitutions covered
Why it is not an identity
Letter collisions such as A, K and U clear the arithmetic untouched.
What the score decides
Below the configured threshold the read picks up a second frame and a lane read before.
Action
AcceptCorrectSend to the laneValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every movement
From the gate lane or the yard camera
Read it, check the arithmetic
Draw on the frame, the ISO 6346 check digit, the appointment on file and the plate and retention rules configured for the site.
A read is not an identity
Routine movements come back read, with the check result attached.
Send the rest to the officer
Failed checks, plate reads and low-confidence characters are marked — and a camera that sees a hazard reports it, it does not remove it.
Build an evidence trail
The read, the frame it came from and the gate officer who accepted it stay on the movement record.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Gate and OCR hardware
- OCR portals
- gate kiosks
- Fixed cameras
- edge devices
Terminal and yard systems
- Navis N4
- Tideworks
- Yard management
- appointments
Equipment and interchange
- Interchange receipt records
- Chassis and equipment registries
Agent
Yard and gate computer vision
- Reads the frame
- Checks the code
- Holds for the officer
Access and evidence
- Gate access controls
- Video and evidence archives
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six layers between the model and the gate
Each control encloses the last. Whatever slips past all of them is named below.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether a read may stand
- L3
- Puts the movement in an officer's hands
- L4 – L5
- Keep the read and the frame it came from
- L6
- Cuts back to manual gate entry when signals degrade
How Nestack evaluates it
Evaluate the reading workflow — not only the characters returned.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the read the yard acts on
- E1Final-output evaluationDid the characters match the frame they were read from?
- E2Step-level evaluationDid the agent run the check digit and the structural rules it should have?
- E3Tool evaluationDid it read and write the correct movement and the correct equipment?
- E4Confidence calibrationDo low-confidence reads actually attract more officer corrections?
- E5Slice evaluationHow does performance change across specific lanes and conditions?
- E6Business outcomeHow many reads were corrected, or disputed after the movement closed?
Floor — the outcome the terminal answers for
Failure modes
Where each failure originates in the agent
Seven ways a gate movement goes wrong, by stage.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- BE-03
Fouled or occluded surface
Rust, snow or lashing hides part of the number.
Stage gathers
Frames, container codes, plates, seals and appointments
02 · Reasoning
2 modes
- BE-04
Letter collision passed
A substitution inside a residue class clears the check.
- BE-06
Read taken as identity
A character string is treated as the equipment itself.
Stage proposes
Read, check-digit result and confidence
03 · Tool / write
2 modes
- BE-02
Plate read over-trusted
A plate is acted on as though it could be checked.
- BE-05
Damage missed on capture
A visible defect never reaches the interchange receipt.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- BE-01
Frame reference lost
A read arrives without the frame behind it.
Stage returns
The read the officer accepts and the yard acts on
05 · Change / Version
1 mode
- BE-07
Silent lane regression
A model or lane change widens what the agent asserts from a frame.
Stage tracks
Model, prompt, lane config and retention rules
- Sev-1 · a movement clears outside the boundary
- Sev-2 · a wrong read reaches the yard record
- Sev-3 · conditions degrade, read routes to review
Affected slices
One lane can carry most of the corrections
In aggregate the correction rate reads low. By slice it does not — night and low-sun lanes run at a multiple of the daylight rate on the same cameras. Nestack reports corrections by lane and condition, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Night and low-sun lanes | 8.2% | 3.9× | Review | |
| Rusted or overpainted boxes | 5.0% | 2.4× | Review | |
| Licence-plate reads | 3.2% | 1.5× | Watch | |
| Daylight portal lanes | 1.7% | 0.8× | Normal |
Bar: correction-rate lift vs. daylight-portal baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
The loop ends in a case, not a post-mortem
The cycle does not end in a post-mortem. It ends in a case the next release has to clear, and that suite is what the next gate movement is measured against.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Officer corrections rise in one lane.
- 02
Diagnose
The frame, the read and the movement record go back on the desk together until the cause narrows to one.
- 03
Improve
Each change carries a version and the movements that forced it.
- 04
Verify
Release waits on the affected cases going green again.
- 05
Learn
The case is kept for good, and the gate rules are rewritten.
Learn → Detect
The return edge. The next read meets a suite that just got longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, cameras, read workflow, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Gate and yard workflow discovery and boundary definition.Week 1
- 02Camera, lane and terminal system review.Week 1, Week 2
- 03Check-digit, structural and appointment rule mapping.Week 1, Week 2
- 04Frame ingestion and read normalisation.Week 2
- 05Character extraction and check logic.Week 2, Week 3
- 06Confidence scoring and exception routing.Week 3
- 07Gate officer workflow.Week 3, Week 4
- 08Yard and terminal-system integration.Week 5
- 09Misread and retention cases.Week 4, Week 5
- 10Guardrails and access controls.Week 4
- 11Movement-trail instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne gate, one lane | ProductionProduction yard systems | AdvancedMultiple sites / gates |
|---|---|---|---|
| Introduced at Pilot | |||
| Reading to your gate rules | ✓ | ✓ | ✓ |
| Gate officer approval | ✓ | ✓ | ✓ |
| Read-accuracy baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by gate and lane | — | ✓ | ✓ |
| Officer workflow in your systems | — | ✓ | ✓ |
| Approved movement write-back | — | ✓ | ✓ |
| Yard-system integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multi-site retention and access rules | — | — | ✓ |
| Multi-stage gate approvals | — | — | ✓ |
| High gate volume | — | — | ✓ |
| Multi-site gate controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your gate layout, lanes and camera positions
→Camera, lane and read-condition mapping
Week 102Representative frames, including the bad ones
→Read baseline, character extraction and check logic
Week 203Your retention schedule and who may view footage
→Retention-rule mapping and automation-boundary definition
Week 104Access to relevant APIs, feeds or exports
→Camera, lane and terminal assessment, then integration setup
Week 205Reads you would not want acted on
→Misread cases and failure-mode testing
Week 406What a read may never authorise on its own
→Confidence scoring, exception routing, guardrails, retention and access controls
Week 307Named gate officers to accept reads
→Gate officer workflow, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
The bands sit on the weeks the work occupies, which is why the fifth carries two kinds at once.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Gate and yard workflow discovery, lane rules and the automation boundary
W2Camera and terminal integration and the read baseline
W3Read workflow, confidence logic and officer controls
W4Evaluation suite, misread cases and failure-mode testing
W5Yard-system integration, pilot lanes and targeted corrections
W6One gate cycle run under the yard team, then Agent Care handover
- Reading the band
- Every bar covers the weeks its own work runs and no others. The fifth week genuinely doubles up.
- At the end of W6
- The cycle closes the validation and Agent Care takes over monitoring.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Transportation AI agent
Build a gate vision agent around who decides at the lane.
A wrong read releases the wrong box, and a missed defect writes a clean interchange receipt over real damage. Show us your gates and we'll name what stays with the officer.
- Typical delivery
- 4–6 weeks
- Deployment
- Your gates and yard systems
- Officer decides
- Read, not ID
- After launch
- Agent Care available
Nestack Agents · Yard and gate computer vision
AGT-TR-16 · Agent Care available after launch
