Accounting AI agent · Audit

Audit Evidence-Testing Agent (Auditor-Side)

Run the tests of details you scope — population checks, documented selections, three-way matching and journal-entry work — and write up every exception, with evaluation, audit trails and the sufficiency judgement left with the auditor.

Typical delivery
4–6 weeks
Deployment
Your stack
Human review
Before reliance
After launch
Agent Care

What this agent does

Runs the procedure and documents what it found

In

  1. 01

    Ingest the population extract, the audit programme step and the documents the test calls for.

  2. 02

    Normalise each item into entity, period, account, assertion and the test it belongs to.

Reason

  1. 03

    Agree the extract to the ledger control total before a single item is drawn from it.

  2. 04

    Draw the selection the auditor specified, and record the method, parameters and seed used.

  3. 05

    Perform the defined test on every item selected — match, recalculate, agree the date, reperform.

Decide

  1. 06

    Flag exceptions, items the test could not be applied to, and evidence that misses the assertion.

  2. 07

    Return every exception and every untested item to the auditor instead of clearing it.

Out

  1. 08

    Retain the extract, the selection, each item tested, the evidence seen and the result.

  2. 09

    Write to the workpaper file only inside the approval boundaries agreed during implementation.

Product statement

The agent executes the procedures the auditor scoped and documents what it found; it gives no assurance, and the auditor judges sufficiency and forms every conclusion.

Example workflow

One procedure, end to end

  1. 1Procedure receivedAudit programme step, workpaper request or the engagement team's own scope
  2. 2Scope resolvedEntity, period, account, assertion, population definition and the selection the auditor set
  3. 3Test performedExtract agreed to the control total, the specified selection drawn, then each item tested
  4. 4Controls appliedPopulation-completeness check, evidence-to-assertion check, source-data checks and confidence threshold

No human action required

Stages 1 to 4 run without a person in the loop — nothing has been relied on yet, so the lane stays empty until the gate.

5DecisionSplits on the confidence and exception gate
High confidence

Recorded as a worked step with its evidence.

Low confidence

Held with the exception it could not resolve.

Auditor review

The step is held with its population, selection, evidence and the exception that stopped it.

Accept · Amend · Extend testing

Accepted — handed back

  1. 6Step written to the fileRecorded as work performed, never as a conclusion; the auditor accepts the step
  2. 7Outcome evaluatedException precision, population-completeness checks, auditor overturns and business outcome

Overturns

Amendments and extended testing at review are counted in the evaluation.

What should not run autonomously

Human approval stays in control

Outside the boundary — human approval required

8 items

  • Whether the evidence is sufficient and appropriate.
    • Sample size, method and materiality decisions.
    • Any conclusion on an assertion.
    • Whether an exception is a misstatement.
  • Automation boundary

    Agent acts unaided

    • ✓Agree the population extract to the ledger control total.
    • ✓Draw the selection the auditor specified and record how.
    • ✓Perform the defined test on every item selected.
    • ✓Document each exception and hand it to the auditor.

    Workpapers are written only inside the approval boundaries agreed during implementation.

    • Treating an exception as an isolated anomaly.
    • Accepting entity-produced data as reliable.
    • Extending, reducing or stopping a test.
  • Sign-off of any workpaper or audit step.

Example output

One tested item, annotated

Everything the agent records is attached to the procedure and the population it came from.

Worked step · single procedure

Illustrative example
Procedure
Three-way match
Population
Posted supplier invoices
Period
FY25
Result
Two open exceptions
Confidence
89%
Population check
Agrees to the control total

As received

The procedure, population and period as the audit programme defines them — the agent redefines neither.

Evidence used

  • Purchase orders
  • Goods-received notes
  • Posted supplier invoices

Why it holds

Both exceptions are receipts with no matching order — whether that is a misstatement is the auditor's call.

What the score decides

Below the configured threshold the step is held for the auditor instead of being recorded as done.

Action

AcceptAmendExtend testing

Value

Where AI adds value

The same four claims, placed at the point in the workflow where each one applies.

Where the value lands

Value 01 – 04

All scoped procedures

From the audit programme

03Execution

Apply the engagement's own scope

Use the population definition, materiality and selection method the engagement team set, never a default.

01Approved path

Cut the tick-and-tie hours

Routine, in-scope tests come back performed, documented and repeatable instead of being worked item by item.

02Human review

Put auditors on the exceptions

Exceptions, unmatched items and population gaps reach the auditor instead of every item doing so.

04

Build an evidence trail

Retain the extract, the selection and its parameters, every item tested, the evidence seen, evaluator result and auditor decision — on both paths.

Integrations

Typical integrations

Five system groups connect to the same agent. Which of them are in scope is decided in discovery.

  • Audit management

    • Caseware
    • CCH Axcess Engagement
    • TeamMate+
    • Inflo
  • ERP, GL & journals

    • SAP
    • Oracle
    • NetSuite
    • Dynamics 365
    • GL and journal extracts
  • Documents & extraction

    • NetDocuments
    • iManage
    • SharePoint
    • DataSnipper
    • IDEA

Agent

Audit evidence testing

  • Reads the population
  • Performs the test
  • Routes exceptions
  • Confirmations

    • Confirmation.com
    • Bank portals
    • Legal confirmations
    • AR confirmations
  • Observability & evaluation

    • OpenTelemetry
    • Langfuse
    • Supported monitoring/evaluation sources

Integration availability depends on the client's existing systems and API access.

Agent controls

Six layers between the model and the workpaper

Each control wraps the one inside it. A test clears every layer before it is recorded as work performed.

L6 · Outermost — last line of defence

Inward → L1 · closest to the model

L6Rollback / safe modeRestrict automation if evaluations or production signals degrade.Roll back
L5Version monitoringTrack ledger re-extracts, exception rules, model and prompt changes.Track
L4Reproducible recordRecord scope, extract, selection parameters, items tested and evidence seen.Record
L3Auditor acceptanceDefine which tests may be recorded without a named auditor accepting them.Gate
L2Assurance boundaryThe agent performs and documents; it never concludes.Restrict
L1Population checksThe extract must agree to the ledger control total.Reconcile
Model coreTest result proposed — items tested, evidence seen, exceptions and confidence
L1 – L2
Decide whether the test may stand
L3
Decides whether an auditor accepts it
L4 – L5
Keep the run repeatable and the rules visible
L6
Pulls automation back when signals degrade

How Nestack evaluates it

Evaluate the full workflow — not only the exception list.

Coverage runs the whole depth of the workflow, and every layer is cut by slice.

Surface — the step the auditor reviews

  1. E1Final-output evaluationDid the test address the assertion it was scoped to?
  2. E2Population evaluationDid the extract agree to the ledger it was drawn from?
  3. E3Selection evaluationWas the draw made as specified, and can it be repeated?
  4. E4Exception calibrationAre flagged exceptions real, and are real ones flagged?
  5. E5Slice evaluationHow does performance change across specific test cohorts?
  6. E6Business outcomeHow many steps were overturned or re-performed at review?

Floor — the outcome the client pays for

Failure modes

Where each failure originates in the agent

Seven failure modes plotted against the five stages of the agent lifecycle.

Agent lifecycle

Direction of processing →

  1. 01 · Retrieval

    2 modes

    • AE-01

      Selection drifts from the plan

      Stratification or interval no longer matches the agreed sampling plan.

    • AE-02

      Reperformance not reproducible

      Re-running the step against the same source returns a different result.

    Stage gathers

    Population extract, source documents and prior evidence

  2. 02 · Reasoning

    2 modes

    • AE-03

      Untested entity report used

      A company-produced report is relied on without being tested.

    • AE-04

      Assertion not evidenced

      A document shows existence but not the assertion tested.

    Stage proposes

    The selection, the test result, exceptions and confidence

  3. 03 · Tool / write

    1 mode

    • AE-05

      Recorded before review

      A step enters the file as though an auditor had accepted it.

    Stage writes

    Only where file access and approval boundaries allow it

  4. 04 · Output

    1 mode

    • AE-06

      Exception closed by rule

      An item is cleared on a threshold instead of investigated.

    Stage returns

    The worked step the auditor and the file see

  5. 05 · Change / Version

    1 mode

    • AE-07

      Narrowed exception rules

      A rule change quietly shrinks what counts as an exception.

    Stage tracks

    Ledger re-extracts, rule, model and prompt changes

  • Sev-1 · untested work recorded as tested
  • Sev-2 · wrong evidence behind the item
  • Sev-3 · testing degrades, step goes to review
See the complete Accounting failure-mode catalogue

Affected slices

Exception risk concentrates by procedure type

Journal-entry work and scanned evidence behave nothing like a three-way match, and they carry most of the missed and mis-flagged exceptions. Nestack reports performance by slice, not only in total.

Slice performance — reported separately, not only in aggregate

Illustrative example
SliceFailure rateLiftLift vs. thresholdStatus
Journal-entry testing runs6.3%3.5×Review
Scanned-document evidence5.4%3.0×Review
Confirmation exception runs3.4%1.9×Watch
Three-way match runs0.9%0.5×Normal

Bar: lift vs. three-way-match baseline · scale 0–4.0× · tick marks the 2.0× review threshold

2 of 4 slices over threshold

Evidence-linked improvement

Scoring comes from the auditor, not the agent

What the reviewer changed — a missed exception, or one raised that was not real — is what the next release is measured against.

Improvement cycle · five stages

Switchback — the path turns at Improve and returns at Learn

  1. 01

    Detect

    Overturns rise in a test cohort, or exception precision drops.

  2. 02

    Diagnose

    Failure isolated to the extract, the draw, the evidence match or the rule.

  3. 03

    Improve

    The rule or the match logic is corrected — approved, version-linked and dated.

  4. 04

    Verify

    Archived engagement data is re-run and the two results are compared.

  5. 05

    Learn

    The overturned item becomes a case in the regression suite.

  6. Learn → Detect

    The return edge. A release that cannot reproduce last cycle's overturns does not ship.

Typical build scope

Twelve workstreams across six weeks

The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, populations and extracts, test execution, evaluation, integration, then production validation and handover.

Workstream

Week 1Week 2Week 3Week 4Week 5Week 6

  1. 01Procedure scoping and assurance-boundary definition.Week 1
  2. 02Source-system and workpaper assessment.Week 1, Week 2
  3. 03Population definition and control-total mapping.Week 1, Week 2
  4. 04Extract reconciliation and selection logic.Week 2
  5. 05Test execution, matching and recalculation.Week 2, Week 3
  6. 06Exception rules and confidence scoring.Week 3
  7. 07Auditor review and acceptance workflow.Week 3, Week 4
  8. 08Workpaper and document-system integration.Week 5
  9. 09Evaluation suite and regression cases.Week 4, Week 5
  10. 10Guardrails and documentation controls.Week 4
  11. 11Observability and trace instrumentation.Week 5, Week 6
  12. 12Deployment, documentation and Agent Care handover.Week 6

12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel

Final scope and sequence confirmed in discovery

Engagement tiers

What each tier includes

Rows are the capabilities named in each tier's scope. Higher tiers include everything below them. No tier adds assurance or the sufficiency judgement.

Capability✓ in scope · — not at this tierPilotOne procedureProductionProduction integrationAdvancedGroup engagements
Introduced at Pilot
Defined-procedure execution✓✓✓
Population completeness checks✓✓✓
Auditor acceptance✓✓✓
Baseline evaluation✓✓✓
Introduced at Production
Reproducible selection records—✓✓
Exception write-ups—✓✓
Approved workpaper writes—✓✓
Observability and evaluation—✓✓
Introduced at Advanced
Group and multi-entity testing——✓
Multi-stage review——✓
Enterprise controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build price
Confirmed after discovery based on the procedures in scope, population volumes, source systems, review controls and deployment requirements.
Separate from build
Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.

What we need from you

What you bring, and what we build with it

Each input maps to a piece of build scope and a week in the delivery timeline.

  1. 01The procedures in scope and the programme steps they sit under

    Procedure scoping and the population definition for each

    Week 1
  2. 02The assurance boundary and who accepts each step

    Assurance-boundary definition and acceptance controls

    Week 1
  3. 03Access to the ledger, the extracts and the document store

    Source-system and workpaper assessment

    Week 2
  4. 04Population definitions, control totals and materiality

    Extract reconciliation and control-total mapping

    Week 2
  5. 05Selection methods and the exception thresholds you use

    Selection logic, exception rules and confidence scoring

    Week 3
  6. 06Exceptions your reviewers overturned last year

    Evaluation suite, regression cases and failure-mode testing

    Week 4
  7. 07Named auditors or test users

    Auditor acceptance workflow, then pilot testing and production validation

    Weeks 5–6

Nothing else is required

Deployment, documentation and Agent Care handover are ours.

Delivery timeline

Four phases across six weeks

Phases are drawn over the weeks they actually occupy. Weeks 5 and 6 run a real audit step, which is the only place the exception rules meet live data.

Phase

W1

W2

W3

W4

W5

W6

  1. DiscoveryW1
  2. BuildW2 – W3
  3. EvaluateW4 – W5
  4. Pilot & LaunchW5 – W6

Week focus

W1Procedure scoping, assurance boundary and population definitions

W2Ledger and document access, extract reconciliation and the selection baseline

W3Test execution, exception rules and auditor acceptance controls

W4Evaluation suite, documentation guardrails and failure-mode testing

W5Workpaper integration, a pilot procedure and targeted corrections

W6One audit step run end to end, verification and Agent Care handover

Reading the band
A bar covers only the weeks its work is named in. Week 5 carries two because the pilot procedure runs against the evaluation suite, not after it.
At the end of W6
One procedure has been run end to end and accepted by a named auditor, then Agent Care monitors population checks, exception precision and overturns.
Duration
Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.

Next step · Accounting AI agent

Build an evidence-testing agent around your audit programme.

Show us the procedures you want run, the populations they draw from and who accepts each step. We'll take one procedure end to end, agree what the agent may never conclude and scope the rest from there.

Typical delivery
4–6 weeks
Deployment
Your audit stack
Human review
Before the work is relied on
After launch
Agent Care available

Nestack Agents · Audit evidence-testing agent

AGT-ACC-09 · Agent Care available after launch

Build an evidence-testing agent

Four questions so the call starts from your actual setup — then pick a time that suits you.

About you