Electronics AI agent · equipment authorization
Equipment Authorization & Covered-List AI Agent
Carry the authorization file per model — the grant, the test lab, the responsible party, the US agent — and watch the lists that can re-open a certification already signed.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Named signer
- Evidence held
- After launch
- Agent Care
What this agent does
Holds the file, never the signature
In
- 01
A grant is filed, and 47 CFR 2.911(d)(5) fixes what the applicant certified on that date.
- 02
A listing changes afterwards, and 2.911(d)(6) forces a new written and signed certification.
Reason
- 03
A listing lands in a PSHSB Public Notice; the FCC Covered List webpage served a September 2024 page.
- 04
A category listing reaches foreign-produced routers, prohibited by default since DA 26-278.
- 05
A prohibited-entity check reads every list FCC 25-27 names, each published elsewhere on its own cadence.
Decide
- 06
A model on the SDoC route needs no signature; 47 CFR 2.1077(a)(3) still requires a US responsible party.
- 07
A company is sold or merged, and 47 CFR 2.909(e) passes responsible-party status to the new entity.
Out
- 08
A Cyber Trust Mark filing is voluntary, and 47 CFR Part 8, Subpart B is where its rules sit.
- 09
Execute write actions only inside the approval boundaries agreed during implementation.
Product statement
The agent assembles the file and tracks the listings; a named person signs the certification under 47 CFR 2.911(d) and files it, and the applicant answers for it.
Example workflow
One model, grant to certification
- 1Listing change publishedPSHSB Public Notice, or a BIS, DHS, DoD or Treasury list update
- 2Authorization file assembledGrant, TCB, test lab and its ownership evidence, responsible party, US agent and each module grant
- 3Listing version recordedThe notice, its DA number and the date each list was read
- 4Controls appliedRe-certification checks, US-agent checks, module-grant checks and completeness confidence
No human action required
Stages 1 to 4 run unaided, and nothing is certified at any of them — the agent is assembling, and the regulatory lane opens at the completeness gate.
Goes to the regulatory manager to sign.
Adds a regulatory counsel read first.
Regulatory review
The file is held with its listings, its grants and its gaps.
Sign the certification · Append evidence · Send to counsel
Signed and filed — by a named person
- 6Authorization records updatedOnly where write access and disclosure policy allow it
- 7Outcome evaluatedListing currency, evidence completeness, counsel corrections and what a later review found
Corrections
Each counsel correction is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Certifying that equipment is not prohibited.
- Signing or filing anything with a TCB.
- Declaring an applicant off the Covered List.
- Telling a buyer a model is still authorized.
Automation boundary
Agent acts unaided
- ✓Assemble the authorization file for each model and each grant on record.
- ✓Read the PSHSB notices, not the Covered List webpage.
- ✓Check the designated US agent still resolves to a live address.
- ✓Draft the re-certification the moment a listing moves.
Nothing is certified or filed except by a named signer, inside the agreed boundaries.
- Deciding an entity is not under prohibited control.
- Reading a Conditional Approval as an exemption.
- Saying whether Cyber Trust Mark submissions are open.
- Changes to listing rules, checks or certification text.
Example output
One model, annotated
FCC 24-122 turned on a US agent mailbox closed since 2019, and the file is what a person signs from.
Authorization file · single model
Illustrative example- Model
- Wireless router, current grant
- Filed as
- Certification, TCB grant, module grants attached
- Listing read
- DA 26-278, 23 March 2026
- Evidence of record
- PSHSB Public Notice, read that day
- Confidence
- Held uncertified
- Held for
- The regulatory manager, in person
As received
Taken from the PSHSB notice and the grant record — nothing on this side is decided by the agent.
What the file holds
- The TCB grant
- US agent designation
- Module grant records
Why no certification here
FCC 26-2 reaches licence holders, not equipment authorization applicants.
What the score decides
Below the configured threshold the file picks up a counsel read before.
Action
Sign the certificationAppend evidenceSend to counselValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every model
From the authorization record
One country, one authorization
Certificate expiry and in-country representatives belong to our type-approval agent; this page stays on the US authorization and the Covered List.
Which list moved, and when
DA 25-1086 listed foreign-produced UAS on 22 December 2025 and DA 26-786 added power inverters on 28 July 2026 — categories, not companies.
What changed, and what did not
FCC 25-27 put the new certifications on TCBs, labs and accreditation bodies; the 2026 forfeiture maxima did not rise, per 91 FR 39613.
Build an evidence trail
The grant, the list version read against it and the signer who certified stay on the file.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Listing sources
- PSHSB Public Notices
- BIS
- DHS
- DoD
- Treasury lists
Authorization records
- FCC ID grants
- TCB records
- Test reports
- lab accreditation
Product and supply records
- PLM
- bill of materials
- Module grants
- supplier records
Agent
Equipment authorization & covered list
- Reads the listings
- Builds the file
- Holds for the signer
Corporate and entity records
- Ownership
- entity registers
- US agent designations
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six rings between the model and the file
Six rings, the innermost tightest of all. What gets through every one of them is drawn in the map below.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether a file may stand
- L3
- Puts the signature in a person's hands
- L4 – L5
- Keep the grant and the list behind it
- L6
- Holds the grant at unverified when signals degrade
How Nestack evaluates it
Evaluate the whole assembly — not only the file that comes out.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the file a TCB reads
- E1Final-output evaluationDid the file record the listing version read that day?
- E2Step-level evaluationDid the agent read the notices, the right modules and the current lists?
- E3Tool evaluationDid it read and write the correct model and the correct grant record?
- E4Confidence calibrationDo low-confidence files actually attract more counsel corrections?
- E5Slice evaluationHow does performance change across specific product lines?
- E6Business outcomeHow many files needed a correction before the manager signed them?
Floor — the outcome the applicant answers for
Failure modes
Where each failure originates in the agent
Seven failure modes, set at the stage where each one actually starts.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- ID-03
Stale list page
The listing read comes from a superseded webpage.
Stage gathers
The grants, the notices, the lists and the modules
02 · Reasoning
2 modes
- ID-04
Category listing missed
Only named entities are screened, not categories.
- ID-06
Module grant dropped
An incorporated module keeps no grant of its own.
Stage proposes
The listings, the checks applied and completeness
03 · Tool / write
2 modes
- ID-02
US agent taken as given
A designated agent address is never re-checked.
- ID-05
Re-certification not raised
A list change leaves the old certification standing.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- ID-01
Certified, listing unrecorded
The file shows a certification but not what was read.
Stage returns
The file a person signs and a TCB reads later
05 · Change / Version
1 mode
- ID-07
Silent listing regression
A rule change moves a listing without moving the file.
Stage tracks
Model, prompt, listing rules and notice sources
- Sev-1 · a signature rests on a stale list
- Sev-2 · a wrong listing reaches the file
- Sev-3 · source degrades, file holds unsigned
Affected slices
One product line absorbs the corrections
A line-level listing-provenance figure can read clean while one product line absorbs most of the corrections. Nestack reports the counsel-correction rate by product line, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Category-listed product lines | 9.5% | 3.7× | Review | |
| Lines with third-party modules | 6.9% | 2.7× | Review | |
| Consumer wireless lines | 4.3% | 1.7× | Watch | |
| Certified industrial lines | 1.6% | 0.6× | Normal |
Bar: counsel-correction-rate lift vs. certified industrial baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
What an unreconstructable file costs
The loop shuts when the stale list page is a regression case. That suite is what the next grant checked is measured against.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Counsel-correction rate rises in one product line.
- 02
Diagnose
The page that had said September 2024 for two years is read back against the notices until one cause remains.
- 03
Improve
Any change goes out numbered, with the listings that caused it attached.
- 04
Verify
One grant case still failing is enough to hold the release back.
- 05
Learn
One case joins the suite, one line joins the listing record.
Learn → Detect
The return edge. The next grant is measured against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, file assembly, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Authorization-file discovery and boundary work.Week 1
- 02Grant, PLM and entity-register sources.Week 1, Week 2
- 03Listing-source, module-grant and US-agent mapping.Week 1, Week 2
- 04Grant ingestion and file normalisation.Week 2
- 05Module, module-grant and supplier binding.Week 2, Week 3
- 06Completeness scoring and counsel routing.Week 3
- 07Signer certification workflow.Week 3, Week 4
- 08Authorization-record integration.Week 5
- 09Listing and grant cases.Week 4, Week 5
- 10Guardrails and certification controls.Week 4
- 11Grant-trail instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne product line, one route | ProductionProduction authorization records | AdvancedMultiple lines / routes |
|---|---|---|---|
| Introduced at Pilot | |||
| File assembly to your rules | ✓ | ✓ | ✓ |
| Named-signer certification | ✓ | ✓ | ✓ |
| Listing-provenance baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by product line | — | ✓ | ✓ |
| Certification workflow in your systems | — | ✓ | ✓ |
| Approved write-back | — | ✓ | ✓ |
| Authorization-record integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multi-list screening duties | — | — | ✓ |
| Cross-line evidence packs | — | — | ✓ |
| High model volume | — | — | ✓ |
| Multi-list screening controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your model list and grant records
→Grant ingestion and module mapping
Week 102Representative grants and notices
→File baseline, listing binding and evidence capture
Week 203Your listing sources and signers
→Listing-source, module-grant and US-agent mapping and the automation boundary
Week 104Access to relevant APIs, feeds or exports
→Grant, PLM and entity-register assessment, then integration setup
Week 205Grants you would not want re-read
→Listing cases and the evaluation suite
Week 406What no certification may imply
→Completeness scoring, counsel routing, guardrails and certification controls
Week 307A named regulatory manager to sign
→Signer certification workflow, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Width here is worked time rather than layout space, which is why two bands have to share the fifth week.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Authorization workflow discovery, listing mapping and the automation boundary
W2Source integration and the grant baseline
W3File assembly, listing logic and certification controls
W4Evaluation suite, listing cases and failure-mode testing
W5Authorization-record integration, pilot models and targeted corrections
W6One authorization cycle run under the regulatory manager, then Agent Care handover
- Reading the band
- A bar covers only the weeks its own work is named in. The doubled fifth week is real work, not padding.
- At the end of W6
- Once the authorization file validates, Agent Care assumes the agent.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Electronics AI agent
Build an equipment authorization agent around a list that moves without notice.
Show us how a grant reaches you today and which list you read on 1 October. Under 47 CFR 2.911(d)(6) a named person at the applicant signs each new certification a Covered List change forces, and the file behind that signature is read back long afterwards.
- Typical delivery
- 4–6 weeks
- Deployment
- Your authorization records
- Named signer
- Evidence held
- After launch
- Agent Care available
Nestack Agents · equipment authorization
AGT-EL-13 · Agent Care available after launch
