Electronics AI agent · Battery shipping
Lithium Battery Shipping Evidence AI Agent
Marshal what one signature has to cover — the test summary behind each cell model, the packing instruction and charge state for each consignment — and leave the declaration to a named person.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Named declarant
- Evidence held
- After launch
- Agent Care
What this agent does
Builds the consignment file, not the declaration
In
- 01
A consignment is tendered, and a person declares that all of the applicable air transport requirements have been met.
- 02
A cell model changes, and a new summary is signed — 38.3.3 requires retesting on a defined design change.
Reason
- 03
A test summary is signed under 38.3.5(j); 173.185(a)(3)(x) asks only for a name and title.
- 04
A distributor holds it as well: 173.185(a)(3) binds each manufacturer and subsequent distributor.
- 05
A cell shipped alone has no Section II — PI 965 and PI 968 lost it in March 2022.
Decide
- 06
A small cell lost its air exception in the US on 10 April 2025, under HM-215Q.
- 07
A pallet under PI 966 meets the thirty-per-cent charge cap from 1 January 2026; PI 967 only advises.
Out
- 08
A damaged cell moves by highway, rail or vessel only, in a Packing Group I box under twelve-millimetre marks.
- 09
Execute write actions only inside the approval boundaries agreed during implementation.
Product statement
The agent assembles the consignment file and keeps every summary, mark and measurement; a named person signs the test summary, signs the Declaration and tenders the goods.
Example workflow
One consignment, cell to signature
- 1Consignment raisedSales order, RMA return, sample shipment or an interplant stock transfer
- 2Cell evidence assembledTest summaries, model numbers, watt-hour ratings and the design-change history behind each
- 3Consignment file builtPacking instruction, section, charge state, marks, labels and the Declaration fields
- 4Controls appliedMode checks, packing-instruction checks, charge-state checks and completeness confidence
No human action required
Stages 1 to 4 run unaided, and nothing is declared or tendered at any of them — the agent is assembling, and the dangerous goods lane opens at the completeness gate.
Goes to the dangerous goods manager to sign.
Adds a regulatory counsel read first.
Dangerous goods review
The file is held with its packing instruction, its evidence and its gaps.
Sign the Declaration · Append evidence · Send to counsel
Signed — by a named person
- 6Shipping and ERP records updatedOnly where write access and disclosure policy allow it
- 7Outcome evaluatedPacking accuracy, evidence completeness, counsel corrections and what a later audit found
Corrections
Each counsel correction is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Signing the Declaration for a consignment.
- Certifying that a cell meets the 38.3 criteria.
- Signing a test summary for a cell model.
- Tendering a consignment to any carrier.
Automation boundary
Agent acts unaided
- ✓Assemble the cell evidence and the design-change history behind it.
- ✓Select the packing instruction and name the section it falls in.
- ✓Check the charge state and hold both State approvals.
- ✓Fill the Declaration fields and hold them for signature.
No consignment is tendered except by a named person, inside the agreed boundaries.
- Deciding a return is damaged or defective.
- Assuming a State of Origin or Operator approval.
- Deciding a non-conforming cell may move at all.
- Changes to packing rules, marks or Declaration fields.
Example output
One consignment, annotated
The FAA case of 5 September 2025 turned on undeclared shipments, one of which had caught fire in its package.
Consignment file · single tender
Illustrative example- Consignment
- Cells packed with equipment
- Filed as
- PI 966, Section I, by cargo aircraft
- Charge state
- Within the cap
- Evidence of record
- Signed summary, 4 August 2026
- Confidence
- Held untendered
- Held for
- The dangerous goods manager, in person
As received
Taken from the signed test summary and the charge-state record — nothing here is measured by the agent.
What the file holds
- The signed test summary
- Packing-instruction pick
- A331 approvals
Why no signature here
172.204(d) names who may sign, and that signature is a personal one.
What the score decides
Below the configured threshold the file picks up a counsel read before.
Action
Sign the DeclarationAppend evidenceSend to counselValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every consignment
From the shipping order
Where a return becomes
Our RMA triage agent settles the claim; 173.185(f) starts here, and a 173.185(d) recycling move belongs to our producer-registration agent.
One signature covers all of it
172.204(c) folds classification, packaging, marking, labelling and condition into one sentence, and A331 rides on the same form.
What the June filing is not
DOT hazmat registration under 49 CFR 107.601 keys to placarding, and a Class 9 lithium consignment carries no domestic placard.
Build an evidence trail
The cell, the test summary behind it and the shipper who declared stay on the consignment.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Shipping and carrier
- Carrier DG systems
- air waybill
- Freight forwarder portals
Cell and battery evidence
- Test summaries
- UN 38.3 reports
- Design-change records
Order and inventory
- ERP
- WMS
- Item master
- packing data
Agent
Lithium battery shipping evidence
- Reads the cell
- Builds the file
- Holds for the signer
Returns and RMA
- RMA cases
- return authorisations
- Damage and defect flags
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six filters between the model and the file
Six filters in series, and each is finer than the last. What survives is set out in the map below.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether a file may stand
- L3
- Puts the signature in a person's hands
- L4 – L5
- Keep the consignment and the evidence behind it
- L6
- Holds the consignment at undeclared when signals degrade
How Nestack evaluates it
Evaluate the whole assembly — not only the file that comes out.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the file an inspector reads
- E1Final-output evaluationDid the file record the summary that stands behind the cell?
- E2Step-level evaluationDid the agent pick the right packing instruction, section and mode?
- E3Tool evaluationDid it read and write the correct consignment and the correct cell record?
- E4Confidence calibrationDo low-confidence files actually attract more counsel corrections?
- E5Slice evaluationHow does performance change across specific shipping lanes?
- E6Business outcomeHow many files needed a correction before the manager signed them?
Floor — the outcome the shipper answers for
Failure modes
Where each failure originates in the agent
Seven failure modes, each placed at the stage where it starts.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- IF-03
Cabin rule read as cargo
A passenger cabin rule is applied to a cargo tender.
Stage gathers
The cells, the summaries, the packing rules and the marks
02 · Reasoning
2 modes
- IF-04
Wrong section selected
A Section II tender is built for cells shipped alone.
- IF-06
Domestic form sent abroad
A summary with no signature travels internationally.
Stage proposes
The section, the charge state and completeness
03 · Tool / write
2 modes
- IF-02
Charge state assumed
The cap is met on a data sheet, not a measurement.
- IF-05
Return routed to air
A defective cell is booked onto an aircraft.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- IF-01
Declared, evidence unheld
The file shows a tender but not what stood behind it.
Stage returns
The Declaration a person signs and a carrier reads
05 · Change / Version
1 mode
- IF-07
Silent edition regression
The mark was renamed in 2025 and the file kept the old name.
Stage tracks
Model, prompt, packing rules and edition dates
- Sev-1 · a consignment leaves undeclared
- Sev-2 · a wrong packing instruction is used
- Sev-3 · source degrades, file holds untendered
Affected slices
One lane absorbs the corrections
A lane-level packing-evidence figure can read clean while one lane absorbs most of the corrections. Nestack reports the counsel-correction rate by lane, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Damaged and defective returns | 8.1% | 3.6× | Review | |
| Cells shipped alone by air | 5.9% | 2.6× | Review | |
| Batteries packed with equipment | 3.6% | 1.6× | Watch | |
| Batteries contained in equipment | 1.5% | 0.7× | Normal |
Bar: counsel-correction-rate lift vs. contained-in-equipment baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
What an unreconstructable file costs
A cycle ends when the wrong packing instruction is a standing case. That suite is what the next consignment built is measured against.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Counsel-correction rate rises in one lane.
- 02
Diagnose
The pallet somebody tendered under a section that stopped existing in March 2022 is read back until one cause remains.
- 03
Improve
Changes leave numbered, and the consignments behind them travel attached.
- 04
Verify
A single failing consignment case is enough to stop the release.
- 05
Learn
The case is kept, and the packing rules are rewritten alongside it.
Learn → Detect
The return edge. The next consignment is measured against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, file assembly, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Shipping-workflow discovery and boundary definition.Week 1
- 02ERP, RMA and test-summary sources.Week 1, Week 2
- 03Packing-instruction and charge-state rule mapping.Week 1, Week 2
- 04Cell evidence ingestion and normalisation.Week 2
- 05Design-change and summary binding.Week 2, Week 3
- 06Completeness scoring and counsel routing.Week 3
- 07Declaration signature workflow.Week 3, Week 4
- 08Shipping and ERP integration.Week 5
- 09Packing and charge-state cases.Week 4, Week 5
- 10Guardrails and declaration controls.Week 4
- 11Consignment-trail instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne lane, one packing instruction | ProductionProduction shipping workflow | AdvancedMultiple lanes / modes |
|---|---|---|---|
| Introduced at Pilot | |||
| File assembly to your rules | ✓ | ✓ | ✓ |
| Named-signer declaration | ✓ | ✓ | ✓ |
| Cell-evidence baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by lane | — | ✓ | ✓ |
| Signature workflow in your systems | — | ✓ | ✓ |
| Approved write-back | — | ✓ | ✓ |
| Shipping-system integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multi-mode transport rules | — | — | ✓ |
| Cross-lane evidence packs | — | — | ✓ |
| High consignment volume | — | — | ✓ |
| Multi-mode declaration controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your cell records and shipping data
→Cell evidence ingestion and model mapping
Week 102Representative consignments and summaries
→File baseline, packing selection and evidence capture
Week 203Your packing rules and shipping lanes
→Packing-instruction, charge-state and mode mapping and the automation boundary
Week 104Access to relevant APIs, feeds or exports
→ERP, RMA and carrier-system assessment, then integration setup
Week 205Consignments you would not want declared
→Packing cases and the evaluation suite
Week 406What no declaration may cover
→Completeness scoring, counsel routing, guardrails and signature controls
Week 307A named dangerous goods manager to sign
→Declaration signature workflow, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
The bars are drawn to the weeks the work really takes, and that is why the fifth one carries two.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Shipping workflow discovery, packing mapping and the automation boundary
W2Source integration and the cell-evidence baseline
W3File assembly, packing logic and signature controls
W4Evaluation suite, packing cases and failure-mode testing
W5Shipping integration, pilot consignments and targeted corrections
W6One shipping quarter run under the dangerous goods manager, then Agent Care handover
- Reading the band
- A bar covers only the weeks its own work is named in. The doubled fifth week is real work, not padding.
- At the end of W6
- When the consignment file validates, Agent Care picks the agent up.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Electronics AI agent
Build a battery shipping agent around the one signature that covers everything.
Show us how a consignment reaches the dock today and who signs the Declaration on the next one. That signature has to survive an inspection of a package that already burnt, read back against the packing instruction, the charge state and the marks on the box.
- Typical delivery
- 4–6 weeks
- Deployment
- Your shipping systems
- Named declarant
- Evidence held
- After launch
- Agent Care available
Nestack Agents · lithium battery shipping evidence
AGT-EL-15 · Agent Care available after launch
