Electronics AI agent · Manufacturing and test
Manufacturing & Test AI Agent
Read ATE and AOI results with the measurement uncertainty they carry, group defects and surface drift against the limits your engineers set, and assemble the pack for the named quality engineer, who decides.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Named engineer
- Pre-disposition
- After launch
- Agent Care
What this agent does
Reports the measurement, not the verdict
In
- 01
Where a lot finishes test, pull the ATE logs, AOI results and the configured limits from the sources on file.
- 02
When a value lands near a limit, report it with the uncertainty the station's calibration record carries.
Reason
- 03
Where a parameter is quoted, carry the test conditions and the station it was measured on.
- 04
When defects repeat, group them by failure mode, site and reference designator.
- 05
Where a chart signals out of control, surface it against the limits on file and leave those limits alone.
Decide
- 06
When a part screens as anomalous against the configured criteria, raise it for quarantine and reporting.
- 07
Route every lot to the named quality engineer for disposition.
Out
- 08
Retain the readings, their uncertainty, the model version and the disposition for the period your sector sets.
- 09
Execute write actions only inside the approval boundaries agreed during implementation.
Product statement
The agent reports the measurement; the named quality engineer dispositions the lot, and the manufacturer owns the conformity statement.
Example workflow
One lot, test log to disposition
- 1Test results receivedATE log, AOI result, SPC feed or MES lot record
- 2Readings assembledMeasured values, their uncertainty, the test conditions and the configured limits
- 3Interpretation draftedMeasured values with uncertainty, grouped defects, drift flags and confidence
- 4Controls appliedUncertainty checks, limit-source checks, configured acceptance criteria and confidence threshold
No human action required
Stages 1 to 4 run unaided, and no lot is dispositioned at any of them — the agent is reporting, and the engineer's lane opens at the confidence gate.
Goes to the quality engineer to decide.
Adds a metrology read first.
Engineer disposition
The report is held with its readings, its uncertainty and the confidence.
Accept · Amend · Send to metrology review
Accepted — the engineer decides
- 6MES and test systems updatedOnly where write access and approval policy allow it
- 7Outcome evaluatedReading accuracy, engineer amendments, escapes and post-shipment field returns
Amendments
Every engineer amendment is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Dispositioning a lot, or releasing product to ship.
- Moving, widening or recomputing a control limit.
- Overriding or closing an out-of-control signal.
- Declaring a part authentic, or declaring it counterfeit.
Automation boundary
Agent acts unaided
- ✓Read ATE and AOI results back with the uncertainty they carry.
- ✓Group defects by failure mode, site and designator.
- ✓Surface drift against the limits already on file.
- ✓Assemble the disposition pack and hold it for the named engineer.
Any write happens inside the boundaries agreed at implementation, never ahead of the engineer's decision.
- Setting the decision rule or the guard band.
- Stating conformity against a specification limit.
- Scrapping, reworking or downgrading material.
- Changes to the limit sets, criteria or approval rules.
Example output
One test result, annotated
Everything the agent reports is attached to the reading it was taken from.
Test interpretation · single lot
Illustrative example- Lot
- Power-module lot
- Reported line
- Quiescent current, reported with the uncertainty the station carries
- Measured value
- 12.4 mA ± 0.3
- Instrument of record
- ATE station 04
- Confidence
- 89%
- Held for
- Named quality engineer
As received
Taken from the ATE log and the station's calibration record — nothing on this side is judged by the agent.
Readings used
- ATE station log
- Calibration record
- Gauge study on file
Why it reads this way
It sits within its own uncertainty of the limit — the call the engineer makes.
What the score decides
Below the configured threshold the report picks up a metrology read before the engineer sees it.
Action
AcceptAmendSend to metrology reviewValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every lot
From the test systems
Report from the reading
Draw on the ATE log, the AOI result and the limits your engineers set from process data.
Read the result, not the verdict
Routine readings come back grouped, dated and stated with their uncertainty.
Put the near-limit results first
Near-limit readings, drift signals and anomalous calls are marked, so the engineer reads where risk concentrates.
Build an evidence trail
The measurement, its uncertainty and the engineer who dispositioned it stay with the lot record.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Test and measurement
- Teradyne
- Advantest
- Keysight
- NI TestStand
Inspection systems
- Koh Young
- CyberOptics
- Omron
- Mirtec AOI
MES and quality
- Siemens Opcenter
- Critical Manufacturing
Agent
Manufacturing and test
- Reads the result
- States the uncertainty
- Holds for disposition
SPC and analytics
- InfinityQS
- Minitab
- JMP
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six layers between the model and the lot
The layers nest, and each says what it does not catch. The map below carries the rest.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether a report may stand
- L3
- Puts the disposition in an engineer's hands
- L4 – L5
- Hold the measurement and the uncertainty it carried
- L6
- Reverts to raw result reporting when signals degrade
How Nestack evaluates it
Evaluate the whole reading path — not only the number at the end.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the report the line sees
- E1Final-output evaluationDid every reported value match the log it was read from?
- E2Step-level evaluationDid the agent use the right limits, criteria and calibration record?
- E3Tool evaluationDid it read the correct lot, station and test step?
- E4Confidence calibrationDo low-confidence readings actually attract more engineer amendments?
- E5Slice evaluationHow does performance change across specific production lines?
- E6Business outcomeHow many reports needed an amendment or a correction after the lot shipped?
Floor — the disposition the plant answers for
Failure modes
Where each failure originates in the agent
Seven failure modes, each placed where it begins.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- CB-03
Superseded limit set
Limits are read from a control plan the plant has replaced.
Stage gathers
Test logs, AOI results, limits and calibration records
02 · Reasoning
2 modes
- CB-04
Uncertainty dropped
A measured value is reported as a bare number, without its uncertainty.
- CB-06
Signal explained away
A plausible narrative is offered where an investigation was due.
Stage proposes
Measured values, grouped defects and confidence
03 · Tool / write
2 modes
- CB-02
Verdict stated as fact
A near-limit reading is written up as a pass or a fail.
- CB-05
Defect group collapsed
Distinct failure modes are merged under one heading.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- CB-01
Limit source unstated
A drift flag is raised without naming the limits behind it.
Stage returns
The report the engineer dispositions the lot from
05 · Change / Version
1 mode
- CB-07
Silent threshold drift
A model or config change moves what the agent calls anomalous.
Stage tracks
Model, prompt, limit sets and criteria config
- Sev-1 · a held act performed by the agent
- Sev-2 · a wrong reading reaches the engineer
- Sev-3 · a source degrades, report goes to review
Affected slices
Overall accuracy can hide one line
Near-limit measurements are the slice an aggregate buries — a small share of readings, most of the amendments. Nestack reports the amendment rate by slice, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Near-limit measurements | 4.9% | 3.9× | Review | |
| Marginal AOI calls | 3.4% | 2.7× | Review | |
| Recalibrated stations | 2.5% | 2.0× | Watch | |
| Mature high-volume lines | 0.9% | 0.7× | Normal |
Bar: amendment-rate lift vs. the mature-line baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
A cycle ends in a case, not a conclusion
Nothing closes on a review meeting. It closes on a case the next release has to pass, and that suite is what the next lot dispositioned is measured against.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Amendment rate rises in a reading slice.
- 02
Diagnose
If the reading and the log disagree, the trail is followed until one limit set, station or prompt accounts for it.
- 03
Improve
Every change ships against a version with the lots attached.
- 04
Verify
The release is blocked while an affected case fails.
- 05
Learn
The case becomes permanent, and the disposition rules are re-tested.
Learn → Detect
The return edge. The suite the next lot meets is one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, reporting workflow, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Test-floor workflow discovery and boundary definition.Week 1
- 02ATE, AOI and MES source assessment.Week 1, Week 2
- 03Limit set, decision rule and acceptance-criteria mapping.Week 1, Week 2
- 04Result ingestion and unit normalisation.Week 2
- 05Reading logic and uncertainty binding.Week 2, Week 3
- 06Confidence scoring and drift routing.Week 3
- 07Engineer disposition workflow.Week 3, Week 4
- 08MES and test-system integration.Week 5
- 09Uncertainty and limit cases.Week 4, Week 5
- 10Guardrails and disposition controls.Week 4
- 11Lot-trail instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne line, one product | ProductionProduction test systems | AdvancedMultiple plants / lines |
|---|---|---|---|
| Introduced at Pilot | |||
| Reading to your limits and criteria | ✓ | ✓ | ✓ |
| Engineer disposition | ✓ | ✓ | ✓ |
| Measurement-consistency baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by line and product | — | ✓ | ✓ |
| Disposition workflow in your systems | — | ✓ | ✓ |
| Approved write-back | — | ✓ | ✓ |
| MES and test-system integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multi-standard limit rules | — | — | ✓ |
| Multi-stage quality approvals | — | — | ✓ |
| High lot volume | — | — | ✓ |
| Multi-plant disposition controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your test programmes and their limit sets
→Result ingestion and reading mapping
Week 102Representative logs already dispositioned
→Reading baseline, uncertainty binding and defect grouping
Week 203Your decision rule and acceptance criteria
→Limit set, decision rule and acceptance-criteria mapping
Week 104Access to relevant APIs, feeds or exports
→ATE, AOI and MES assessment, then integration setup
Week 205Dispositions you would not want repeated
→Limit cases and failure-mode testing
Week 406What a measurement is never allowed to decide
→Confidence scoring, drift routing, guardrails and disposition controls
Week 307Named quality engineers to disposition lots
→Engineer disposition workflow, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
The bands sit on the weeks the work occupies, so the fifth carries evaluation and launch together.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Test workflow discovery, limit mapping and the automation boundary
W2Test-source integration and the reading baseline
W3Reporting workflow, confidence logic and disposition controls
W4Evaluation suite, uncertainty checks and failure-mode testing
W5MES integration, pilot lots and targeted corrections
W6One production run dispositioned under the quality team, then handover
- Reading the band
- Each bar covers only the weeks its work is named in. The week 5 overlap is real, not padding.
- At the end of W6
- The run closes validation and Agent Care picks up monitoring.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Electronics AI agent
Build a test agent around your limits and your quality engineers.
Show us a week of test logs and the limits behind them. You bring the decision rule, the acceptance criteria and the engineer who dispositions a lot. We map the reporting workflow around them.
- Typical delivery
- 4–6 weeks
- Deployment
- Your test and MES data
- Named engineer
- Pre-disposition
- After launch
- Agent Care available
Nestack Agents · Manufacturing and test
AGT-EL-11 · Agent Care available after launch
