Energy AI agent · Asset maintenance
Grid & Asset-Maintenance AI Agent
Read the inspection record, detect against the criteria your engineers configured, bind every finding to the frame it came from, and hold each one for the named engineer who dispositions it.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Named engineer
- Pre-disposition
- After launch
- Agent Care
What this agent does
A detection is not a condition assessment
In
- 01
Ingest inspection imagery, LiDAR passes and patrol records from supported asset and inspection systems.
- 02
Normalise frame, pass and asset identifiers, and carry each capture forward with the record it came from.
Reason
- 03
Detect against the criteria configured for the asset class, and score each finding.
- 04
Apply the utility's own severity bands, clearance rules and asset-class thresholds.
- 05
Bind every detection to the frame, the structure and the inspection it came from.
Decide
- 06
Mark what the imagery did not cover — the angle not flown, the span obscured, the pass cut short.
- 07
Route every detection to the named engineer who dispositions it.
Out
- 08
Retain the imagery, the detection, the engineer's disposition and the outcome against the asset.
- 09
Execute write actions only inside the approval boundaries agreed during implementation.
Product statement
The agent proposes detections; a named engineer dispositions each one, and the maintenance programme — not the detection — is what the auditor asks to see.
Example workflow
One detection, frame to disposition
- 1Inspection record receivedAerial pass, ground patrol, thermal scan or LiDAR survey
- 2Asset context assembledStructure, circuit, asset class, prior findings and capture conditions, each with its source
- 3Detection proposedAsset, defect class, frame and confidence
- 4Controls appliedCriteria checks, coverage checks, prior-finding checks and confidence threshold
No human action required
Stages 1 to 4 run unaided, and nothing is dispositioned at any of them — the agent is detecting, and the engineer's lane opens at the confidence gate.
Goes to the named engineer to disposition.
Adds a second-reader read first.
Engineer disposition
The detection is held with its frame, its coverage gaps and the confidence.
Confirm · Reclassify · Send to second reader
Dispositioned — sent to the programme
- 6Asset systems updatedOnly where write access and approval policy allow it
- 7Outcome evaluatedCorrection rates, coverage gaps, field verification and defects surfaced later
Corrections
Every engineer correction is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Dispositioning a defect, or clearing one from the list.
- Changing an inspection interval, or the coverage flown.
- Declaring an asset, a span or a structure healthy.
- Scheduling, deferring or cancelling maintenance work.
Automation boundary
Agent acts unaided
- ✓Read the inspection record against the configured criteria.
- ✓Bind each detection to the frame and the asset it came from.
- ✓Carry the pass, the imagery and the capture conditions.
- ✓Mark what the imagery did not cover, and hold for an engineer.
Any write happens inside the boundaries agreed at implementation, never ahead of disposition.
- Closing a maintenance record or an unresolved issue.
- Recording that an annual inspection was performed.
- Deciding that a span met its clearance distance.
- Changes to detection criteria or severity rules.
Example output
One detection, annotated
A detection rests on a frame, and the frame is the whole of what the agent saw.
Detection output · single asset
Illustrative example- Asset
- Lattice suspension tower
- Detection
- Corrosion at a suspension-clamp fitting, tower body clear
- Frame
- AR-0417
- Source of record
- Aerial pass on file
- Confidence
- 88%
- Held for
- Named engineer, not dispositioned
As received
Taken from the inspection pass and the asset register — nothing on this side is written by the agent.
Evidence used
- Aerial pass frame
- Asset register entry
- Prior structure finding
Why it is held
A fitting this small sits at the edge of what imagery resolves — the engineer looks.
What the score decides
Below the configured threshold the detection picks up a second reader before.
Action
ConfirmReclassifySend to second readerValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every detection
From the inspection record
Detect from the record
Draw on the criteria your engineers configured: prioritising what to cut is legitimate, prioritising whether to inspect is not.
Detect it, do not clear it
Routine passes arrive already read, and neither the coverage nor the prescribed intervals move.
Send review to the risky findings
Coverage gaps and low-confidence detections are marked — vegetation contact has caused outages and fires, so a miss is not a workload problem.
Build an evidence trail
The detection, the imagery behind it and the engineer who dispositioned it stay on the asset.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Asset and work management
- Maximo
- SAP PM
- Copperleaf
- Cascade
Inspection capture
- Drone and helicopter passes
- LiDAR
- thermal
- ground patrol
GIS and network model
- ArcGIS Utility Network
- Smallworld
- circuit models
Agent
Grid asset maintenance
- Reads the record
- Proposes detections
- Holds for disposition
Vegetation programme
- Work plan and cycle records
- Contractor cut records
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six layers between the model and the work order
The layers nest. What each one misses is named in the map below.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether a detection may stand
- L3
- Puts the disposition in an engineer's hands
- L4 – L5
- Hold the imagery the detection rested on
- L6
- Reverts to raw inspection records when signals degrade
How Nestack evaluates it
Evaluate the inspection workflow — not only the finished detection.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the finding the engineer reads
- E1Final-output evaluationDid the detection match what the frame actually shows?
- E2Step-level evaluationDid the agent use the right pass, asset record and configured criteria?
- E3Tool evaluationDid it read and write the correct asset and the correct field?
- E4Confidence calibrationDo low-confidence detections actually attract more engineer corrections?
- E5Slice evaluationHow does performance change across specific asset classes?
- E6Business outcomeHow many detections were corrected, and how many defects surfaced later?
Floor — the outage the utility answers for
Failure modes
Where each failure originates in the agent
Seven failure modes, placed at the stage each one originates.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- HB-03
Frame the pass never took
The agent cannot see what the imagery did not capture.
Stage gathers
Inspection record, asset register and prior findings
02 · Reasoning
2 modes
- HB-04
Condition read from one frame
A single view is treated as an assessment of the asset.
- HB-06
Criteria run on the wrong class
Thresholds set for one asset class are applied to another.
Stage proposes
Asset, defect class, frame and confidence
03 · Tool / write
2 modes
- HB-02
Coverage cut by risk score
Inspection coverage is reduced where the model scores risk low.
- HB-05
Detection loses its frame
A finding reaches the record without the image behind it.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- HB-01
Small fitting missed
A bolt, clamp or fitting is not detected in the frame.
Stage returns
The detection the engineer dispositions
05 · Change / Version
1 mode
- HB-07
Silent criteria drift
A model or criteria change narrows what the agent will flag.
Stage tracks
Model, prompt, detection criteria and severity bands
- Sev-1 · a record changed outside the boundary
- Sev-2 · a defect the agent did not flag
- Sev-3 · imagery degrades, detection routes to review
Affected slices
A fleet-wide figure is not an asset's figure
Small fittings are the least-counted things on the line — hardest to resolve, hardest to label, and they fail without warning. Nestack reports the engineer-correction rate by slice, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Small fittings and bolts | 9.7% | 3.6× | Review | |
| Adverse-weather imagery | 6.5% | 2.4× | Review | |
| Substation thermal scans | 4.3% | 1.6× | Watch | |
| Steel lattice structures | 2.4% | 0.9× | Normal |
Bar: engineer-correction-rate lift vs. steel-lattice baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
A miss closes as a test, not a note
A cycle is done when the miss has become a test the next release has to survive. That suite is what the next detection off the line is measured against.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Engineer-correction rate rises in an asset slice.
- 02
Diagnose
Not the model first — read the frames and the asset records behind the corrections until one criterion is left.
- 03
Improve
Version-stamp the change and attach the detections that exposed it.
- 04
Verify
The affected cases run again, and a fail stops the release.
- 05
Learn
It becomes a standing test, and the inspection rules change with it.
Learn → Detect
The return edge. The next detection runs against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, detection workflow, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Inspection workflow discovery and automation-boundary definition.Week 1
- 02Inspection and asset source assessment.Week 1, Week 2
- 03Detection criteria, severity band and asset-class mapping.Week 1, Week 2
- 04Imagery ingestion and normalisation.Week 2
- 05Detection logic and frame binding.Week 2, Week 3
- 06Confidence scoring and coverage routing.Week 3
- 07Engineer disposition workflow.Week 3, Week 4
- 08Asset- and work-management integration.Week 5
- 09Missed-defect regression cases.Week 4, Week 5
- 10Guardrails and disposition controls.Week 4
- 11Asset-trail instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne circuit, one asset class | ProductionProduction asset systems | AdvancedMultiple regions / programmes |
|---|---|---|---|
| Introduced at Pilot | |||
| Detection to your record and criteria | ✓ | ✓ | ✓ |
| Engineer disposition | ✓ | ✓ | ✓ |
| Detection-quality baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by asset class | — | ✓ | ✓ |
| Disposition workflow in your systems | — | ✓ | ✓ |
| Approved write-back | — | ✓ | ✓ |
| Asset-management integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multi-region criteria and severity rules | — | — | ✓ |
| Multi-stage engineering approvals | — | — | ✓ |
| High inspection volume | — | — | ✓ |
| Multi-region programme controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your asset classes and inspection record structure
→Imagery ingestion and asset mapping
Week 102Representative inspected assets
→Detection baseline, criteria extraction and frame binding
Week 203Your detection criteria and severity bands
→Detection criteria, severity band and asset-class mapping
Week 104Access to relevant APIs, feeds or exports
→Inspection and asset assessment, then integration setup
Week 205Detections you would not want acted on
→Coverage cases and the evaluation suite
Week 406What must reach an engineer before work is scheduled
→Confidence scoring, coverage routing, guardrails and disposition controls
Week 307Named engineers to disposition detections
→Engineer disposition workflow, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Phases are drawn over the weeks they actually occupy, which is why week 5 doubles up rather than padding.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Inspection workflow discovery, criteria mapping and the automation boundary
W2Imagery and asset integration and the detection baseline
W3Detection workflow, confidence logic and disposition controls
W4Evaluation suite, coverage checks and failure-mode testing
W5Asset-system integration, pilot circuits and targeted corrections
W6One inspection cycle read under the asset team, then handover
- Reading the band
- Each bar sits on the weeks its own work runs, and no others. Week 5 genuinely carries two kinds of work.
- At the end of W6
- The last checks clear on live inspections and monitoring moves to Agent Care.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Energy AI agent
Build an asset-maintenance agent that stops at the disposition.
Show us your inspection passes and the criteria your engineers already apply. You bring the named engineer who dispositions a finding and the programme it feeds; we set the automation boundary at that person.
- Typical delivery
- 4–6 weeks
- Deployment
- Your asset stack
- Named engineer
- Pre-disposition
- After launch
- Agent Care available
Nestack Agents · Grid asset maintenance
AGT-EN-02 · Agent Care available after launch