Energy AI agent · NERC CIP evidence

NERC CIP Compliance Evidence AI Agent

Carry the evidence each CIP interval consumes — the patch date, the evaluation, the baseline, the quarterly access check — and hold it for the CIP Senior Manager named under CIP-003-9 R3.

Typical delivery
4–6 weeks
Deployment
Your stack
Named manager
Interval-bound
After launch
Agent Care

What this agent does

Assembles the evidence, not the determination

In

  1. 01

    A patch publishes, and CIP-007-6 Part 2.2 allows 35 calendar days to evaluate it for applicability.

  2. 02

    An evaluation completes, and Part 2.3 gives 35 more days to apply or to date a mitigation plan.

Reason

  1. 03

    A mitigation plan runs long, and only the CIP Senior Manager or delegate may extend it under Part 2.4.

  2. 04

    A change completes, and CIP-010-4 Part 1.3 allows 30 calendar days to update the baseline.

  3. 05

    An access review falls due, and CIP-004-7 Part 4.2 wants verification each calendar quarter.

Decide

  1. 06

    A termination action lands, and CIP-004-7 Part 5.1 leaves 24 hours to revoke the access.

  2. 07

    An incident is judged, and the CIP-008-6 Part 4.2 hour runs from determination, not detection.

Out

  1. 08

    A manager changes, and CIP-003-9 R3 wants the new name documented within 30 calendar days.

  2. 09

    Execute write actions only inside the approval boundaries agreed during implementation.

Product statement

The agent assembles and tracks intervals. The named person is the CIP Senior Manager, who approves — the self-certification itself carries no attestation.

Example workflow

One interval, evidence to approval

  1. 1Interval evidence receivedPatch bulletins, baselines, access records or termination feeds
  2. 2Interval context assembledThe system, its impact rating, the standard part it answers to and the date the clock started
  3. 3Evidence set draftedThe interval, its records, the gaps and completeness
  4. 4Controls appliedInterval checks, evidence-sufficiency checks, date checks and completeness confidence

No human action required

Stages 1 to 4 run unaided, and nothing is approved at any of them — the agent is assembling, and the compliance lane opens at the completeness gate.

5DecisionSplits at the completeness gate
Evidence sufficient

Goes to the CIP Senior Manager to approve.

Anything thin

Adds a compliance analyst read first.

Compliance review

The set is held with its interval, its gaps and the systems they sit on.

Approve · Append evidence · Send to compliance

Approved — by the CIP Senior Manager

  1. 6Asset and access records updatedOnly where write access and records policy allow it
  2. 7Outcome evaluatedEvidence completeness, interval coverage, analyst corrections and what review found

Corrections

Each analyst correction is counted in the evaluation.

What should not run autonomously

Human approval stays in control

Outside the boundary — human approval required

8 items

  • Determining that an incident is reportable.
    • Approving cyber security policies under CIP-003-9 R1.
    • Signing a self-certification or any CMEP submission.
    • Extending a mitigation plan under CIP-007-6 Part 2.4.
  • Automation boundary

    Agent acts unaided

    • ✓Hold the record each CIP interval consumes, with the date it carries.
    • ✓Track each interval against the standard that sets it.
    • ✓Chase the missing record before the calendar-day window closes.
    • ✓Flag the determination criteria that start the one-hour.

    Nothing is approved or filed except by a named person, inside the agreed boundaries.

    • Judging whether an interval was in fact met.
    • Telling a Regional Entity the estate is compliant.
    • Setting the impact rating a system is held at.
  • Changes to access, baselines or firewall rules.

Example output

One interval, annotated

Our control room copilot leaves the command to the operator; this record is what one CIP interval consumed.

Evidence set · single interval

Illustrative example
Interval
Patch evaluation, Part 2.2
Recorded as
Evaluated for applicability, not applicable
System
Medium impact
Evidence of record
Vendor bulletin, 3 August 2026
Confidence
Held unapproved
Held for
The CIP Senior Manager, by name

As received

Taken from the vendor bulletin and the patch record — it reaches as far as those sources do.

What the record holds

  • Vendor bulletin date
  • Evaluation record
  • Mitigation plan, dated

Why no interval call here

Whether the window was met is a CIP-007-6 judgement, not a model output.

What the score decides

Below the configured threshold the set picks up a compliance read before the manager sees it.

Action

ApproveAppend evidenceSend to compliance

Value

Where AI adds value

The same four claims, placed at the point in the workflow where each one applies.

Where the value lands

Value 01 – 04

Every interval

From the system that owes it

03Evidence

Where the evidence is used

Our compliance reporting assistant works a register and names no regime; this page is one regime, with its own clocks and its own named role.

01Approved path

The clock starts when you say so

CIP-008-6 Part 4.2 runs one hour from determination under your own R1 Part 1.2 criteria, not from detection.

02Human review

What was checked, and not found

NERC publishes neither CIP audit reports nor noncompliance filings — they are treated as critical energy infrastructure information — and no aggregate total is published.

04

Build an evidence trail

The evidence, the interval it belongs to and the manager who approved stay on the record.

Integrations

Typical integrations

Five system groups connect to the same agent. Which of them are in scope is decided in discovery.

  • Patch and vulnerability sources

    • Vendor bulletins
    • CVE feeds
    • Patch management systems
  • Configuration and baselines

    • CMDB
    • configuration monitoring
    • Change records
  • Access and personnel

    • Identity provider
    • HR feed
    • Termination and transfer records

Agent

NERC CIP compliance evidence

  • Reads the intervals
  • Assembles the evidence
  • Holds for the manager
  • Incident and case systems

    • SIEM
    • ticketing
    • Determination criteria records
  • Observability & evaluation

    • OpenTelemetry
    • Langfuse
    • Supported monitoring/evaluation sources

Integration availability depends on the client's existing systems and API access.

Agent controls

Six meshes between the model and the manager

Six meshes, coarsest first of all. Whatever drops through every one is set out in the map below.

L6 · Outermost — last line of defence

Inward → L1 · closest to the model

L6Rollback / safe modeNarrow the agent to evidence assembly when evaluation or production signals degrade.Roll back
L5Version monitoringTrack model, prompt and interval rules; CIP-015-1 is approved and not enforceable until 1 July 2028.Track
L4TraceabilityRecord each interval, the records behind it, the system it sits on and every read of the set.Record
L3Manager releaseHold the set for the CIP Senior Manager; it governs release, not whether an interval was met.Gate
L2Policy guardrailsTest the set against CIP-004-7, CIP-007-6 and CIP-010-4 as configured; CIP-003-11 lands 1 July 2029.Restrict
L1Confidence thresholdsRoute a thin evidence set to a compliance read before the CIP Senior Manager sees it.Require review
Model coreEvidence assembled — the interval, the system, the records and completeness
L1 – L2
Test whether a set may stand
L3
Puts the approval in a person's hands
L4 – L5
Keep the interval and the evidence behind it
L6
Holds the determination unmade when signals degrade

How Nestack evaluates it

Evaluate the whole assembly — not only the evidence set that comes out.

Coverage runs the whole depth of the workflow, and every layer is cut by slice.

Surface — the set an auditor reads

  1. E1Final-output evaluationDid the set record what each interval actually consumed?
  2. E2Step-level evaluationDid the agent read the right system, the right part and the live configuration?
  3. E3Tool evaluationDid it read and write the correct asset record and the correct interval?
  4. E4Confidence calibrationDo low-confidence sets actually attract more compliance corrections?
  5. E5Slice evaluationHow does performance change across specific impact ratings?
  6. E6Business outcomeHow many sets needed a correction before the manager approved?

Floor — the outcome the entity answers for

Failure modes

Where each failure originates in the agent

Seven failure modes, each set at the stage where it first appears.

Agent lifecycle

Direction of processing →

  1. 01 · Retrieval

    1 mode

    • IX-03

      Stale interval read

      The configuration read is not the one now in service.

    Stage gathers

    The systems, the intervals, the records and the dates

  2. 02 · Reasoning

    2 modes

    • IX-04

      Interval asserted, not shown

      An interval is called met without its evidence.

    • IX-06

      Future standard read as live

      CIP-015-1 is worked as though enforceable now.

    Stage proposes

    The intervals, their records and completeness

  3. 03 · Tool / write

    2 modes

    • IX-02

      Thin set passed forward

      A set moves on without the compliance read.

    • IX-05

      Evidence bound to wrong asset

      A record is filed against the wrong system.

    Stage writes

    Only where write access and approval policy allow it

  4. 04 · Output

    1 mode

    • IX-01

      Approved, evidence unrecorded

      The record shows approval but not what supported it.

    Stage returns

    The set a manager approves and an auditor reads

  5. 05 · Change / Version

    1 mode

    • IX-07

      Silent interval regression

      A configuration change moves the interval, not the record.

    Stage tracks

    Model, prompt, interval rules and evidence fields

  • Sev-1 · an interval approved on no evidence
  • Sev-2 · wrong evidence reaches the record
  • Sev-3 · source degrades, set holds unapproved
See the complete Energy failure-mode catalogue

Affected slices

Low impact absorbs the corrections

A rating-level interval-evidence figure can read clean while low impact systems carry most of the corrections. Nestack reports the correction rate by impact rating, not only in total.

Slice performance — reported separately, not only in aggregate

Illustrative example
SliceFailure rateLiftLift vs. thresholdStatus
Low impact systems10.2%3.6×Review
Medium impact at Control Centers7.6%2.7×Review
Medium impact with routable access4.7%1.7×Watch
High impact Control Centers1.6%0.6×Normal

Bar: correction-rate lift vs. high-impact Control Center baseline · scale 0–4.0× · tick marks the 2.0× review threshold

2 of 4 slices over threshold

Evidence-linked improvement

What a missed window costs

A cycle closes when the missed evaluation window is a regression case. That suite is what the next interval worked is measured against.

Improvement cycle · five stages

Switchback — the path turns at Improve and returns at Learn

  1. 01

    Detect

    Correction rate rises on low impact systems.

  2. 02

    Diagnose

    The patch that published on a Friday and was evaluated thirty-six days later is read back until one cause remains.

  3. 03

    Improve

    The change ships numbered, and the intervals that forced it ride with it.

  4. 04

    Verify

    Nothing releases while one touched system case is still red.

  5. 05

    Learn

    It is retained for good, and the interval rules are amended in that same commit.

  6. Learn → Detect

    The return edge. The next interval is measured against a suite one case longer.

Typical build scope

Twelve workstreams across six weeks

The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, evidence assembly, evaluation, integration, then production validation and handover.

Workstream

Week 1Week 2Week 3Week 4Week 5Week 6

  1. 01CIP-interval discovery and automation-boundary work.Week 1
  2. 02Patch, baseline and access sources.Week 1, Week 2
  3. 03Interval-to-standard and evidence-coverage mapping.Week 1, Week 2
  4. 04Interval evidence ingestion.Week 2
  5. 05System, part and record binding.Week 2, Week 3
  6. 06Completeness scoring and review routing.Week 3
  7. 07Manager approval workflow.Week 3, Week 4
  8. 08Asset and access-system integration.Week 5
  9. 09Interval and evidence cases.Week 4, Week 5
  10. 10Guardrails and approval controls.Week 4
  11. 11Interval-trail instrumentation.Week 5, Week 6
  12. 12Deployment, documentation and Agent Care handover.Week 6

12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel

Final scope and sequence confirmed in discovery

Engagement tiers

What each tier includes

Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.

Capability✓ in scope · — not at this tierPilotOne rating, one yearProductionProduction compliance workflowAdvancedMultiple ratings / entities
Introduced at Pilot
Evidence assembly to your intervals✓✓✓
CIP Senior Manager release✓✓✓
Asset-inventory baseline✓✓✓
Introduced at Production
Reporting by impact rating—✓✓
Approval workflow in your systems—✓✓
Approved write-back—✓✓
Configuration-system integration—✓✓
Introduced at Advanced
Multi-entity registrations——✓
Cross-standard evidence packs——✓
Large asset estates——✓
Multi-standard interval controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build price
Confirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
Separate from build
Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.

What we need from you

What you bring, and what we build with it

Each input maps to a piece of build scope and a week in the delivery timeline.

  1. 01Your registered systems and their impact ratings

    Asset-inventory mapping and interval capture

    Week 1
  2. 02Representative patch, baseline and access records

    Record binding, interval logic and the evidence baseline

    Week 2
  3. 03Your determination criteria under R1 Part 1.2

    Interval mapping, system binding and the automation boundary

    Week 1
  4. 04Access to relevant APIs, feeds or exports

    Patch, configuration and access-source assessment, then integration setup

    Week 2
  5. 05Intervals you would not want reconstructed

    Evaluation cases and failure-mode testing

    Week 4
  6. 06What no evidence set may establish

    Completeness scoring, review routing, guardrails and release controls

    Week 3
  7. 07A named CIP Senior Manager to approve

    Manager approval workflow, then pilot and production validation

    Weeks 5–6

Nothing else is required

Deployment, documentation and Agent Care handover are ours.

Delivery timeline

Four phases across six weeks

These bands are the weeks each phase honestly costs, and the fifth one therefore has to carry two.

Phase

W1

W2

W3

W4

W5

W6

  1. DiscoveryW1
  2. BuildW2 – W3
  3. EvaluateW4 – W5
  4. Pilot & LaunchW5 – W6

Week focus

W1CIP workflow discovery, interval mapping and the automation boundary

W2Source integration and the interval-evidence baseline

W3Evidence assembly, interval logic and release controls

W4Evaluation suite, interval cases and failure-mode testing

W5Record integration, pilot intervals and targeted corrections

W6One compliance year run under the CIP senior manager, then Agent Care handover

Reading the band
Each bar covers only the weeks its own work is named for. The fifth week carries two because the work does.
At the end of W6
Validation closes on live intervals, and Agent Care picks up the watch.
Duration
Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.

Next step · Energy AI agent

Build a CIP evidence agent around the intervals your estate already owes.

Show us one interval and the record it consumed. If patch evaluation and mitigation planning sit apart across your estate, then the Part 2.3 window is kept on trust. Your self-certification calendar is your Regional Entity's; plant OT monitoring is a different agent.

Typical delivery
4–6 weeks
Deployment
Your asset inventory
Named manager
Interval-bound
After launch
Agent Care available

Nestack Agents · NERC CIP evidence

AGT-EN-10 · Agent Care available after launch

Build a CIP evidence agent

Four questions so the call starts from your actual setup — then pick a time that suits you.

About you
Your intervals

No obligation. We’ll map the workflow, name the automation boundary and tell you if an agent is the wrong answer.