Energy AI agent · Sustainability
Sustainability-Reporting Copilot AI Agent
Assemble each disclosure figure with the source record and method behind it, apply the framework mapping you have configured, and hold the workpaper for the named preparer, who decides what is published.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Preparer signs
- Source-linked
- After launch
- Agent Care
What this agent does
Assembles the evidence, not the sign-off
In
- 01
Ingesting meter data, fuel and invoice records and factor sets from supported energy, ERP or data-platform sources.
- 02
Normalising units, periods and site names, and carrying each datapoint forward with the record it came from.
Reason
- 03
Assembling the workpaper behind each figure — source record, method, factor version and period.
- 04
Applying the framework mapping, boundary and consolidation approach the organisation has configured.
- 05
Reconciling each total against the prior period and writing the movement against the datapoints that moved it.
Decide
- 06
Marking a market-based figure with the instruments it rests on and whether they have been retired.
- 07
Routing the assembled figure and its narrative to the named preparer for acceptance.
Out
- 08
Retaining the datapoint, the method, the preparer's amendments and the acceptance in the workpaper.
- 09
Executing write actions only inside the approval boundaries agreed during implementation.
Product statement
The agent assembles the basis; the named preparer decides what is signed, and the organisation stays the reporting entity.
Example workflow
One figure, meter read to sign-off
- 1Datapoint receivedMeter record, fuel or invoice line, factor set or an ERP extract
- 2Basis assembledSource record, period, boundary, method and factor version, each named
- 3Figure proposedFigure, movement, dual basis and confidence
- 4Controls appliedTraceability checks, the configured mapping rules, instrument checks and confidence threshold
No human action required
Stages 1 to 4 run unaided, and nothing is filed or published at any of them — the agent is assembling evidence, and the preparer's lane opens at the confidence gate.
Goes to the named preparer to accept.
Adds a data-owner check first.
Preparer sign-off
The figure is held with its source record, its method and the confidence.
Accept · Amend · Send to data owner
Accepted — released to report
- 6Reporting systems updatedOnly where write access and approval policy allow it
- 7Outcome evaluatedAmendment rate, restatements, evidence gaps and findings raised on review
Amendments
Every preparer amendment is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Publishing or filing a disclosure of any kind.
- Signing off a figure or a restated prior total.
- Making an environmental marketing claim of any kind.
- Deciding that a framework applies to the entity.
Automation boundary
Agent acts unaided
- ✓Collect each datapoint with its source record and method.
- ✓Apply the framework mapping the organisation has configured.
- ✓Reconcile against the prior period and explain the movement.
- ✓Hold the assembled workpaper for the named preparer.
Any write happens inside the boundaries agreed at implementation, never ahead of sign-off.
- Changing a method, a boundary or an emissions factor.
- Retiring or allocating a market-based instrument.
- Stating a carbon-neutral or offset-based position.
- Changes to mapping, thresholds or approval rules.
Example output
One figure in the workpaper, annotated
Everything the agent proposes is attached to the record it was drawn from.
Disclosure output · single datapoint
Illustrative example- Site
- Northern network depot
- Datapoint
- Purchased electricity for the reporting period
- Value
- 412,600 kWh
- Source of record
- Meter register on file
- Confidence
- 93%
- Method
- Location and market basis
As received
Taken from the meter register and the supplier invoice — nothing on this side is written by the agent.
Evidence used
- Meter register read
- Supplier invoice
- Factor set version
Why this method
It is the method configured for this boundary — not chosen per datapoint.
What the score decides
Below the configured threshold the figure picks up a data-owner check before it.
Action
AcceptAmendSend to data ownerValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every datapoint
From the source record
Build from the record
Draw on the meter, invoice and factor records and the mapping the organisation has configured.
Every figure keeps its source
Routine datapoints arrive already assembled with their basis attached.
Send review to the thin evidence
Evidence gaps, unretired instruments and low-confidence figures are marked, so the preparer's read starts where the basis is weakest.
Build an evidence trail
The datapoint, the method applied to it and the preparer who accepted it stay in the workpaper.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Energy and emissions data
- Meter data
- SCADA historians
- Fuel, fleet and invoice records
Sustainability platforms
- Watershed
- Persefoni
- Sphera
- Net Zero Cloud
Enterprise systems
- SAP
- Oracle
- Workday
- Snowflake
- Databricks
Agent
Sustainability reporting
- Reads the records
- Assembles the basis
- Holds for sign-off
Reporting and workflow
- Workiva
- disclosure tooling
- Evidence and workpaper stores
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six layers between the model and the disclosure
Each control encloses the last. Whatever slips past all of them is named below.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether a figure may stand
- L3
- Puts the release in a preparer's hands
- L4 – L5
- Keep the datapoint and the method applied
- L6
- Cuts back to data collection when signals degrade
How Nestack evaluates it
Evaluate the assembly workflow — not only the finished disclosure.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the disclosure the reader sees
- E1Final-output evaluationDid each figure trace back to a source record and a stated method?
- E2Step-level evaluationDid the agent use the right records, mapping and factor versions?
- E3Tool evaluationDid it read the correct system, site and reporting period?
- E4Confidence calibrationDo low-confidence figures actually attract more preparer amendments?
- E5Slice evaluationHow does performance change across specific disclosure areas?
- E6Business outcomeHow many figures needed an amendment or a restatement afterwards?
Floor — the outcome the organisation answers for
Failure modes
Where each failure originates in the agent
Seven failure modes, placed at the stage each one originates.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- LQ-03
Superseded factor set
An emissions factor read from a retired version.
Stage gathers
Meter records, invoices , with the source each came from
02 · Reasoning
2 modes
- LQ-04
Untraceable figure
A value no source record or repeatable method produces.
- LQ-06
Silent method drift
Boundary or factor vintage changes without a note.
Stage proposes
The figure, the method behind it and confidence
03 · Tool / write
2 modes
- LQ-02
Unsupported explanation
A movement is given a cause the evidence cannot carry.
- LQ-05
Unretired instrument
A market-based figure rests on an unretired instrument.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- LQ-01
Marketing claim in the draft
A neutrality or renewable claim written unbidden.
Stage returns
The disclosure the preparer signs and the reader relies on
05 · Change / Version
1 mode
- LQ-07
Silent factor regression
A model or factor-set change moves a figure without a note.
Stage tracks
Model, prompt, mapping and factor-set changes
- Sev-1 · a figure that cannot be traced
- Sev-2 · a wrong figure reaches the draft
- Sev-3 · source degrades, figure routes to review
Affected slices
Overall quality can hide one weak area
Scope 3 value-chain estimates absorb most of the amendments, and a clean overall figure will not show you that. Nestack reports the preparer-amendment rate by slice, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Scope 3 value-chain estimates | 6.1% | 3.7× | Review | |
| Market-based instrument claims | 4.3% | 2.6× | Review | |
| Newly acquired or divested sites | 3.3% | 2.0× | Watch | |
| Metered Scope 1 and 2 data | 1.3% | 0.8× | Normal |
Bar: preparer-amendment-rate lift vs. metered Scope 1 and 2 baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
The loop closes on a test, not a note
The cycle does not end in a post-mortem. It ends in a case the next release must clear, and that suite is what the next disclosure is measured against.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Preparer-amendment rate rises in a disclosure area.
- 02
Diagnose
Which datapoints moved, and under which method? The workpapers are read back until the cause narrows to one.
- 03
Improve
Each change carries a version and the disclosures that forced it.
- 04
Verify
Release waits on the affected cases going green again.
- 05
Learn
The case is kept for good, and the method notes are rewritten.
Learn → Detect
The return edge. The next detection runs against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, assembly workflow, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Disclosure workflow discovery and automation-boundary definition.Week 1
- 02Meter, ERP and data-platform assessment.Week 1, Week 2
- 03Framework mapping, boundary and consolidation approach.Week 1, Week 2
- 04Datapoint ingestion and normalisation.Week 2
- 05Workpaper assembly and source binding.Week 2, Week 3
- 06Confidence scoring and gap routing.Week 3
- 07Preparer sign-off workflow.Week 3, Week 4
- 08Data-platform and reporting integration.Week 5
- 09Audit-evidence regression cases.Week 4, Week 5
- 10Guardrails and claim controls.Week 4
- 11Workpaper-trail instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne reporting entity, one period | ProductionProduction data platforms | AdvancedMultiple entities / mappings |
|---|---|---|---|
| Introduced at Pilot | |||
| Assembly to your records and mapping | ✓ | ✓ | ✓ |
| Preparer sign-off | ✓ | ✓ | ✓ |
| Evidence-quality baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by disclosure area | — | ✓ | ✓ |
| Preparer review in your systems | — | ✓ | ✓ |
| Approved write-back | — | ✓ | ✓ |
| Data-platform integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multi-framework mapping rules | — | — | ✓ |
| Multi-stage disclosure approvals | — | — | ✓ |
| High datapoint volume | — | — | ✓ |
| Multi-framework disclosure controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your reporting boundary and entity structure
→Datapoint ingestion and source-record mapping
Week 102Representative prior-period disclosures
→Assembly baseline, method extraction and source binding
Week 203Your framework mapping and its named owner
→Framework mapping, boundary and consolidation approach
Week 104Access to relevant APIs, feeds or exports
→Meter, ERP and data-platform assessment, then integration setup
Week 205Claims you would not want published
→Evidence cases and failure-mode testing
Week 406What a draft may never assert on its own
→Confidence scoring, gap routing, guardrails and claim controls
Week 307Named preparers to accept figures
→Preparer sign-off workflow, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
The bands sit on the weeks the work occupies, which is why the fifth carries two kinds at once.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Disclosure workflow discovery, mapping and the automation boundary
W2Source integration and the assembly baseline
W3Assembly workflow, confidence logic and sign-off controls
W4Evaluation suite, claim checks and failure-mode testing
W5Reporting-system integration, pilot areas and targeted corrections
W6One disclosure cycle drafted under the reporting team, then handover
- Reading the band
- A band covers the weeks its work is named in, and nothing else. The week 5 overlap is real, not padding.
- At the end of W6
- The cycle closes the validation and Agent Care takes over monitoring.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Energy AI agent
Build a sustainability agent around your workpaper, not around your report template.
Show us your datapoints, the records behind them and the mapping you report against. The preparer named in your reporting policy is the one who signs, and we will name what never leaves their desk.
- Typical delivery
- 4–6 weeks
- Deployment
- Your data and reporting stack
- Preparer signs
- Source-linked
- After launch
- Agent Care available
Nestack Agents · Sustainability reporting
AGT-EN-05 · Agent Care available after launch
