Mining AI agent · Emergency notification
Emergency Notification & Readiness AI Agent
Run the statutory notification clock from when a reportable event is known, draft the notification against the regulator form, and keep the readiness record true — a named mine official makes the call.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Named officials
- Clock-driven
- After launch
- Agent Care
What this agent does
Runs the clock, not the emergency
In
- 01
An event occurs, and the record is pulled from supported control-room, dispatch, shift-log and roster sources.
- 02
A clock starts when the operator knew or should have known, not when somebody finished deciding.
Reason
- 03
A notification is drafted against the fields the regulator form asks for, and held for the official who makes it.
- 04
A scene is preserved, and the duty that attached at the event is surfaced with the record it has to leave behind.
- 05
A filing window opens, and the accident report and the quarterly return are tracked against the event that began them.
Decide
- 06
A drill falls due, and coverage is counted against the roster that actually worked, not the roster on the plan.
- 07
A physical expires, and the agent tracks the date on the form and never what the physician wrote inside it.
Out
- 08
A plan is approved, and the training window is counted from the approval date, not the date it was submitted.
- 09
A write action runs only inside the approval boundaries agreed during implementation.
Product statement
The agent runs the clock and keeps the record; a named mine official notifies, and a record found wrong is corrected after it was relied on.
Example workflow
One event, first report to filing
- 1First report receivedControl room, dispatch log, shift record and medical transport note
- 2Clock startedTime of first knowledge, candidate event classes and the duties that attach, each with its named source
- 3Notification draftedDraft notification, form fields, preservation checklist, open items and confidence
- 4Controls appliedForm-field completeness, clock checks, preservation and retention tests and confidence threshold
No human action required
Stages 1 to 4 run unaided, and nothing is notified at any of them — the agent is drafting, and the official lane opens at the confidence gate.
Goes to the mine official.
Adds a safety manager read first.
Official review
The draft is held with its clock, its open items and the confidence.
Approve · Amend · Send to safety manager review
Approved — released to the record
- 6Notification record updatedOnly where write access and approval policy allow it
- 7Outcome evaluatedAmendment distance, open-item outcomes, regulator queries and post-filing corrections
Amendments
Every official amendment is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Declaring an emergency, or ordering an evacuation.
- Deciding whether an event is reportable.
- Making the notification to the regulator.
- Taking charge on shift during a mine emergency.
Automation boundary
Agent acts unaided
- ✓Start the clock at the first record of the event, and show it running.
- ✓Draft the notification against the fields the form requires.
- ✓Surface the preservation and record duties that attach at the event.
- ✓Name what has expired in the readiness record, and hold the pack.
Writes run only inside the boundaries agreed at implementation, never ahead of a notification.
- Certifying a drill, a team or an apparatus test.
- Clearing a rescue team member as medically fit.
- Judging a scene-preservation exception in real time.
- Changes to event-class, clock or approval rules.
Example output
One notification, annotated
Everything the agent drafts is attached to the record it was drawn from.
Notification output · single event
Illustrative example- Event class
- Underground fire, no injury
- Notification drafted
- Fire underground not extinguished inside ten minutes
- Time to notification
- 22 minutes
- Source of record
- Control-room log on file
- Confidence
- 86%
- Notifier of record
- Shift foreman, named on the roster
As received
Taken from the control-room log and the shift record — nothing on this side is written by the agent.
Source facts used
- Control-room event log
- Shift and dispatch record
- Suppression report
Why this is open
The log shows when the fire was called in, and nothing shows the official being told.
What the score decides
Below the configured threshold the item picks up a safety manager read before the official sees it.
Action
ApproveAmendSend to safety manager reviewValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every reportable event
From the first record
Start the clock on the record
The window opens when the operator knew or should have known, so the time spent deciding is already time elapsed.
Doubt resolves toward calling
In Canyon Fuel, decided 30 January 2026, the Commission held the window opened as soon as the foreman was told.
Not the alarm, and not the response
Our maintenance planning agent carries equipment currency; our safety compliance assistant carries training and document currency. This page owns the clock that starts at an event.
Build an evidence trail
The event, the clock it started and the official who notified stay on the notification.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Control room and dispatch
- SCADA
- dispatch systems
- Shift logs and rosters
Regulator forms
- MSHA 7000-1
- 7000-2
- Form 5000-3 records
Training and competency
- Pegasus
- Onsite Track Easy
- Drill and training ledgers
Agent
Emergency notification
- Reads the record
- Runs the clock
- Holds for the official
Rescue and equipment records
- Apparatus inspection logs
- Self-rescuer test records
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six layers between the model and the notification
Six layers, outermost first. What the whole set still lets by is drawn in the map below.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether the pack may stand
- L3
- Puts the release in the hands of an official
- L4 – L5
- Keep the event and the clock behind it
- L6
- Narrows to clock tracking when signals degrade
How Nestack evaluates it
Evaluate the notification workflow — not only the finished form.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the notification the regulator reads
- E1Final-output evaluationDid every field trace to the record behind it?
- E2Step-level evaluationDid the agent use the event-class list and form version in force?
- E3Tool evaluationDid it read and write the correct event and the correct mine?
- E4Confidence calibrationDo low-confidence items actually attract more official amendments?
- E5Slice evaluationHow does performance change across specific event classes?
- E6Business outcomeHow many items were amended, or corrected after the form had gone in?
Floor — the outcome the operator answers for
Failure modes
Where each failure originates in the agent
Seven failure modes, each placed where the clock first goes wrong.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- EE-03
Clock read from the finding
The first record of the event was not the one read.
Stage gathers
Event records, rosters, forms and certifications
02 · Reasoning
2 modes
- EE-04
Injury reflex applied
An event with nobody hurt is read as no event.
- EE-06
Window run from submission
Training is counted from the wrong date.
Stage proposes
Clock, notification draft, open items, confidence
03 · Tool / write
2 modes
- EE-02
Back-dated certification
A late test is signed as though it ran on time.
- EE-05
Roster counted, not coverage
A drill certificate hides who never attended.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- EE-01
Investigators not named
The form carries a department, not people.
Stage returns
The notification pack the mine official reads
05 · Change / Version
1 mode
- EE-07
Silent event-class drift
A model or rule change narrows what reads as reportable.
Stage tracks
Model, prompt, event classes and form versions
- Sev-1 · a wrong pack reaches the regulator
- Sev-2 · a wrong basis reaches the record
- Sev-3 · source degrades, item goes to review
Affected slices
One event class can carry most of the returns
A site-level notification-timeliness figure can read as clean while a few event classes carry most of the returned items. Nestack reports the return rate by event class, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Underground fire and outburst | 8.8% | 3.7× | Review | |
| Entrapment and hoist damage | 6.1% | 2.5× | Review | |
| Metal and nonmetal surface | 4.4% | 1.8× | Watch | |
| Reported injury events | 2.0% | 0.8× | Normal |
Bar: return-rate lift vs. injury-event baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
A cycle ends when the suite grows by one
A cycle is done when the missed window has become a case the next release must pass. That suite is what the next notification drafted is measured against.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Return rate rises in one event class.
- 02
Diagnose
The fifteen minutes that started while somebody drove out to look are read back until the cause narrows to one.
- 03
Improve
Stamp the change; the events behind it are filed under that number.
- 04
Verify
Each touched notification case runs once more, and one red holds it.
- 05
Learn
It stays as a standing test, and the reporting rules move with it.
Learn → Detect
The return edge. Detection next time runs against one more case than last.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, notification workflow, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Notification workflow discovery and boundary mapping.Week 1
- 02Event-source and record assessment.Week 1, Week 2
- 03Event-class, clock and record-retention mapping.Week 1, Week 2
- 04Event ingestion and clock start.Week 2
- 05Notification drafting and form binding.Week 2, Week 3
- 06Confidence scoring and exception routing.Week 3
- 07Official notification workflow.Week 3, Week 4
- 08Control-room and forms integration.Week 5
- 09Clock and readiness cases.Week 4, Week 5
- 10Guardrails and notification controls.Week 4
- 11Event-trail instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne mine, one event class | ProductionProduction control-room systems | AdvancedMultiple mines / regulators |
|---|---|---|---|
| Introduced at Pilot | |||
| Clock tracking and drafting | ✓ | ✓ | ✓ |
| Mine-official approval | ✓ | ✓ | ✓ |
| Readiness-currency baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by event class | — | ✓ | ✓ |
| Exception workflow in your systems | — | ✓ | ✓ |
| Approved write-back | — | ✓ | ✓ |
| Control-room integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multi-regulator form rules | — | — | ✓ |
| Multi-stage notification approvals | — | — | ✓ |
| High event volume | — | — | ✓ |
| Multi-regulator notification controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, event volume, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your event classes and notification paths
→Event-class, clock and record-retention rule mapping
Week 102Representative prior notifications and forms
→Event ingestion, clock start and the drafting baseline
Week 203Your emergency plan, drills and rescue records
→Readiness-record mapping and automation-boundary definition
Week 104Access to relevant APIs, feeds or exports
→Event-source and record assessment, then integration setup
Week 205Notifications you would not want timed
→Window cases and failure-mode testing
Week 406What no readiness record may skip
→Confidence scoring, exception routing, guardrails and notification controls
Week 307Named mine officials to make the call
→Official notification workflow, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
The schedule reflects the weeks actually worked, which is why one band in week five is a doubled one.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Notification workflow discovery, rule mapping and the automation boundary
W2Source integration and the drafting baseline
W3Clock logic, drafting workflow and notification controls
W4Evaluation suite, readiness-currency checks and failure-mode testing
W5Control-room integration, a pilot event class and targeted corrections
W6One drill cycle run under the emergency response coordinator, then Agent Care handover
- Reading the band
- A bar covers only the weeks its own work is named in. The week 5 overlap is real, not padding.
- At the end of W6
- The final checks clear on live drills and monitoring moves to Agent Care.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Mining AI agent
Build the notification clock before the fifteen minutes start.
Show us your event classes, your control-room records and the readiness ledger you keep. The record has to survive being read back years later by someone who already knows what happened and wants to know what you knew and when — so we build the clock, the pack and the ledger against that reading. During the event itself the agent is not in the loop, and the official keeps the call.
- Typical delivery
- 4–6 weeks
- Deployment
- Your event records
- Named officials
- Clock-driven
- After launch
- Agent Care available
Nestack Agents · Emergency notification
AGT-MN-17 · Agent Care available after launch