Mining AI agent · Geological & assay data
Geological & Assay-Data AI Agent (Sample to Database)
Validate drill-hole and sample data on import, reconcile assay certificates against the database and score the QA/QC controls — handing a geologist the exceptions, while a named Competent Person carries every reported figure.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Reporting sign-off
- Named person
- After launch
- Agent Care
What this agent does
Checks the data behind the grade
In
- 01
Take drill-hole, collar, survey, logging and sample records as they arrive from the field or the geological database.
- 02
Read assay certificates as the laboratory issued them, carrying the method, the detection limits and the batch.
Reason
- 03
Reconcile each certificate value against the database entry it became, and mark where the two disagree.
- 04
Score the batch's standards, blanks, field and pulp duplicates and umpire results against the programme's own limits.
- 05
Check collars, downhole surveys, sample intervals and logging codes for the contradictions that move a sample.
Decide
- 06
Flag batches that fail their own control limits, samples with no certificate behind them, and method changes.
- 07
Route what it cannot resolve to the project geologist, the database administrator or the laboratory.
Out
- 08
Present the exception pack — each item beside the certificate, the batch and the control that failed.
- 09
Retain every certificate read, the check applied, the rationale and every geologist correction.
Product statement
The agent checks, reconciles and flags. Accepting a batch, releasing a dataset for estimation and every reported figure stay with the named Competent Person.
Example workflow
One assay batch, end to end
- 1Batch receivedA laboratory certificate, a logging upload or a survey file arriving against a drill programme
- 2Records resolvedHole, collar, survey, sample interval, batch, method and detection limit as the certificate states them
- 3Checks runCertificate reconciled to the database, QA/QC controls scored, collar and survey geometry checked
- 4Exceptions markedControl failures, samples with no certificate, interval gaps and overlaps, and changes of method
No human action required
Stages 1 to 4 run without a person in the loop — reading, reconciling and scoring the controls finish before anyone is asked to look at anything. Nothing is accepted in that stretch.
Reaches the geologist as a checked batch.
Goes to the project geologist before anything uses it.
Project geologist
Reads the exceptions, the certificates behind them and the controls that failed, then decides what happens to the batch.
Accept findings · Correct · Request re-assay
Findings accepted — handed back
- 6Pack routed to the geologistHanded over as exceptions; no batch is accepted or rejected and no dataset is released by the agent
- 7Outcome evaluatedWhat the geologist corrected, what the re-assay returned, and what the database audit found by cohort
Corrections
Values a geologist corrects at review are counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Estimating or classifying a Mineral Resource or Ore Reserve.
- Reporting any figure as an Exploration Result.
- Signing off a dataset as fit for estimation.
- Accepting or rejecting an assay batch.
Automation boundary
Agent acts unaided
- ✓Reconcile each certificate value against the database entry it became.
- ✓Score the batch's standards, blanks and duplicates.
- ✓Check collar, survey and interval data for errors.
- ✓Assemble the exceptions with the failed control beside each one.
Write actions run only inside the approval boundaries agreed during implementation. A reported figure is never one.
- Overriding a QA/QC control limit or failure rule.
- Changing a logging code, standard or sampling protocol.
- Editing a certificate value held in the database.
- Deciding a sample swap is only a labelling error.
Example output
One assay batch, annotated
Everything the agent flags is attached to the certificate and the sample it came from.
Exception pack · one certificate batch
Illustrative example- Batch as received
- Certificate, 240 samples
- Method as stated
- Fire assay, 30 g charge
- Detection limit
- 0.01 ppm
- Flagged
- Certificate mismatch
- Confidence
- 91%
- Batch
- Not accepted by the agent
As received
The batch, the method and the detection limit as the certificate states them — nothing on this side is re-keyed.
Evidence used
- Laboratory certificate
- Batch QA/QC inserts
- Sample dispatch record
Why it is held
The certificate and the database entry for that sample disagree.
What the score decides
Confidence decides how hard the geologist reads the pack, not whether it is accepted.
Action
Accept findingsCorrectRequest re-assayValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every batch entering the database
Certificate, logging upload or survey file
Check what the laboratory issued
Use the programme's sampling protocol, insertion rates and control limits, and the method the laboratory states for that batch.
Find the error nobody thought to query
A swapped sample or a re-keyed value looks like ordinary data, so the check runs across every batch rather than the ones someone already doubted.
Send the failed controls up first
Batches that breached their own limits, and values with no certificate behind them, reach the geologist before the data reaches a model.
Build an evidence trail
Retain the certificates read, the controls scored, the exceptions raised, the confidence and every geologist correction — on both paths.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Geological database
- acQuire
- DataShed
- Geobank
- MX Deposit
- core logging tools
Laboratory & certificates
- ALS
- SGS
- Intertek
- Bureau Veritas
- LIMS certificate feeds
Modelling & estimation
- Micromine
- Datamine
- Leapfrog
- Vulcan
- Surpac
Agent
Geological & assay data
- Reads certificates
- Reconciles the batch
- Routes exceptions
Survey & field capture
- Collar surveys
- downhole gyro tools
- Field tablets
- sample dispatch
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six layers between the model and the database
Each control wraps the one inside it. A batch clears every layer before a geologist reads it, and the reported figure sits outside all six.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Decide whether a value may stand
- L3
- Decides what a geologist must close
- L4 – L5
- Keep reporting with a person and the record intact
- L6
- Pulls automation back when signals degrade
How Nestack evaluates it
Evaluate the whole check — not only the pack a geologist opens.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the exception pack the geologist opens
- E1Final-output evaluationDid the pack carry the exceptions that actually mattered?
- E2Step-level evaluationDid it read the right certificate, batch, method and limit?
- E3Tool evaluationDid it resolve the correct hole, interval and sample number?
- E4Control recallHow many control failures were missed against the audited batch?
- E5Slice evaluationHow does check quality change across specific batch cohorts?
- E6Business outcomeHow much was corrected, and what did the re-assays return?
Floor — the database an estimate would be built from
Failure modes
Where each failure originates in the agent
Seven failure modes plotted against the five stages of the agent lifecycle.
Agent lifecycle
Direction of processing →
01 · Retrieval
2 modes
- GA-01
Certificate not reconciled
A database entry differs from the certificate and passes.
- GA-02
Superseded certificate used
The laboratory reissues a certificate and the first one stands.
Stage gathers
Certificates, sample records, survey files and the protocol
02 · Reconciling
2 modes
- GA-03
Method change read as geology
A change of assay method is scored as a change in the ground.
- GA-04
Over-limit result carried
A value at the upper detection limit is used as if measured.
Stage proposes
Matched values, QA/QC scores and data-integrity flags
03 · Verification
1 mode
- GA-05
Sample swap not caught
Two exchanged samples each look ordinary on their own.
Stage checks
Control limits, method changes, interval gaps
04 · Handoff / write
1 mode
- GA-06
Real failure buried in the pack
Minor queries push the batch that actually failed down the list.
Stage presents
The exception pack the geologist reads and its queue
05 · Change / Version
1 mode
- GA-07
Control limit quietly widened
A limit change reaches scoring with no named approver.
Stage tracks
Model, prompt, protocol and control-limit changes
- Sev-1 · bad data could reach an estimate
- Sev-2 · a wrong value reaches the geologist
- Sev-3 · checking degrades, more is corrected
Affected slices
Failures follow the changes, not the volume
Which batches does this miss? Not grade control, which runs the same method every week — the ones where the method changed, the data is old, or the tool sat by steel. Nestack reports performance by slice, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Batches after a method change | 4.8% | 3.1× | Review | |
| Historic holes, legacy database | 3.5% | 2.3× | Review | |
| Magnetic downhole surveys | 2.9% | 1.9× | Watch | |
| Routine grade-control batches | 1.2% | 0.8× | Normal |
Bar: corrected-or-re-assayed item rate, lift vs. routine grade-control baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
One corrected value does not close the batch
Correcting the value leaves the reason it got there untouched. The check, the control limit or the import rule behind it changes under change control.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Geologist corrections or re-assay results move in a cohort.
- 02
Diagnose
Nothing is corrected until the check that let it through is named.
- 03
Improve
The check or the limit goes through change control, with an approver.
- 04
Verify
Run again over archived batches whose audit result is already known.
- 05
Learn
The missed exception is added to the protocol later batches are scored against.
Learn → Detect
The return edge. Nothing shipped here changes what a Competent Person must still decide.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, certificates and database access, reconciliation and control scoring, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Workflow discovery and automation-boundary definition.Week 1
- 02Sampling protocol and QA/QC limit mapping.Week 1, Week 2
- 03Laboratory certificate and LIMS access.Week 2
- 04Drill-hole database and survey data access.Week 2
- 05Certificate-to-database reconciliation.Week 2, Week 3
- 06Standard, blank and duplicate scoring.Week 3
- 07Collar, survey and interval validation.Week 3, Week 4
- 08Method and detection-limit change detection.Week 4
- 09Evaluation suite, control recall and regression cases.Week 4, Week 5
- 10Geologist review and correction capture.Week 5
- 11Exception pack and database write-back.Week 5, Week 6
- 12Observability, deployment and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne programme, one laboratory | ProductionProduction database integration | AdvancedMulti-site / multi-commodity |
|---|---|---|---|
| Introduced at Pilot | |||
| Certificate-to-database reconciliation | ✓ | ✓ | ✓ |
| Standard, blank and duplicate scoring | ✓ | ✓ | ✓ |
| Umpire and check-assay comparison | ✓ | ✓ | ✓ |
| Collar, survey and interval validation | ✓ | ✓ | ✓ |
| Method and detection-limit change flags | ✓ | ✓ | ✓ |
| Reporting stays with the Competent Person | ✓ | ✓ | ✓ |
| Baseline evaluation | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Geologist review workflow and write-back | — | ✓ | ✓ |
| Observability and evaluation | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multi-site and multi-commodity programmes | — | — | ✓ |
| Multiple laboratories and database systems | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on certificate and database integrations, the number of programmes, laboratories and commodities, the QA/QC scheme in use, review controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your sampling and QA/QC protocol, with its insertion rates
→Sampling protocol and QA/QC limit mapping
Week 102The reporting boundary and who your Competent Person is
→Workflow discovery and automation-boundary definition
Week 103Access to the laboratory's certificates or its LIMS feed
→Laboratory certificate and LIMS access
Week 204Access to the drill-hole database, collars and survey files
→Drill-hole database and survey data access
Week 205The standards, blanks and duplicates you insert, and their limits
→Standard, blank and duplicate scoring
Week 306Batches that failed a control, and what you did about them
→Evaluation suite, control recall and regression cases
Week 407Named geologists to read the exception packs
→Geologist review workflow, then pilot batches and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Phases are drawn over the weeks they actually occupy. Week 5 carries both the evaluation work and the first packs a geologist reads.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Sampling protocol, QA/QC limits and the automation boundary
W2Laboratory certificates, the drill-hole database and survey files wired in
W3Reconciliation and control scoring on the first drill programme
W4Evaluation suite, control recall and method-change detection
W5Database write-back, supervised batches and targeted corrections
W6Corrections made by the geologists who own the data, then handover
- Reading the band
- Week 4 scores the checks against batches you have already audited, so the recall figure comes out of your data, not ours.
- At the end of W6
- Geologists who own the data have worked live packs and read corrections back, then Agent Care takes over monitoring.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Mining AI agent
Build a geological data agent around your sampling protocol.
Show us your sampling and QA/QC protocol, one closed drill programme and the database it landed in. That programme is reconciled against the certificates it was built on, and the disagreements come back named, with the certificate behind each one.
- Typical delivery
- 4–6 weeks
- Deployment
- Your geological data stack
- Reporting sign-off
- Named Competent Person
- After launch
- Agent Care available
Nestack Agents · Geological & assay data
AGT-MN-03 · Agent Care available after launch
