Mining AI agent · Pit to port
Logistics & Dispatch AI Agent (Pit to Port)
Plan the movement from pit to port — road, rail, stockpile and ship legs — check each load against its permit, mass limits and fatigue rules, and leave every dispatch to the dispatcher.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Dispatch
- Dispatcher
- After launch
- Agent Care
What this agent does
Plans the movement, does not release it
In
- 01
Take the product ready to move, the stockpile and shed balances, and today's fleet, crews and rosters.
- 02
Read the permits each combination holds, the rail paths given to you and the ship nominations accepted.
Reason
- 03
Build the movement plan leg by leg — road train, load-out, rail path, stockpile and shiploader window.
- 04
Check each load against the combination's mass and dimension limits and the route its permit names.
- 05
Work out what a late train, a closed road or a moved berth does to every leg downstream of it.
Decide
- 06
Flag a plan that only works if a driver runs past a rest rule, and a load outside the cargo specification.
- 07
Route weather closures, permit variations and ship-window changes to the people who decide them.
Out
- 08
Present the plan a dispatcher works from — legs, times, loads, the paperwork each needs and what is missing.
- 09
Retain the sources read, the limits applied, the confidence and every change a dispatcher made.
Product statement
The agent plans, checks and assembles. Dispatch, load release, ship nomination and any change to a route, a mass limit or a rest rule stay with the people who own them.
Example workflow
One cargo, pit to port
- 1Demand drawnThe ship nominations accepted, the rail paths held and the product the mine plan says is ready
- 2Legs builtRoad-train movements, load-out slots, rail paths, stockpile and shed balances and the shiploader window
- 3Loads checkedEach combination against its mass and dimension limits, the route its permit names and the hours the crew has left
- 4Knock-on worked outWhat a late train, a closed road or a moved berth does to every leg downstream of it
No human action required
Stages 1 to 4 run without a person in the loop — building, checking and the knock-on work finish before anyone is asked to read anything. Nothing moves in that stretch.
Reaches the dispatcher as a complete plan.
Goes to the person who owns that decision first.
Dispatcher
Reads the plan leg by leg, the limits applied, the paperwork attached and what is missing, then decides what moves and when.
Accept plan · Re-time · Refer
Plan accepted — handed back
- 6Plan handed overHanded to the dispatcher as a draft; nothing is dispatched, released or nominated by the agent
- 7Outcome evaluatedWhat the dispatcher changed, what ran late, what was turned back at the port and what needed a variation
Amendments
What the dispatcher re-times or refers is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Dispatching a vehicle or a train.
- Releasing a load from the load-out.
- Nominating or accepting a ship.
- Signing a consignment or dangerous-goods declaration.
Automation boundary
Agent acts unaided
- ✓Build the movement plan leg by leg to the port.
- ✓Check each load against the combination's mass limits and its permitted route.
- ✓Work out what a delay does to the legs downstream.
- ✓Assemble the consignment paperwork each leg needs, naming what is missing.
Write actions run only inside the approval boundaries agreed during implementation. A dispatch is never one of them.
- Varying a route, a mass limit or a permit.
- Setting aside a fatigue or rest rule.
- Declaring a road or rail corridor open.
- Committing tonnage or a window to a customer.
Example output
One leg of one movement, annotated
Everything the agent proposes is attached to the leg and the load it came from.
Movement plan · one cargo, one leg
Illustrative example- Leg
- Load-out to rail head
- Combination
- Road train, permitted route
- Ship window opens
- In 5 days
- Proposed
- Move to the night path
- Confidence
- 85%
- Cleared to dispatch
- Not released by the agent
As received
The leg, the combination and the window it has to make — read from the plan and the nomination, not restated.
Evidence used
- Permit route and conditions
- Crew hours remaining
- Rail path held for tonight
What forces the re-time
The daytime run puts the last truck past the driver's rest window.
What the score decides
Confidence decides how hard the dispatcher reads this, not whether the load may move.
Action
Accept planRe-timeReferValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every load leaving site
From the movement plan and the nomination
Plan on the limits that apply
Use the permits each combination holds, the paths the rail operator has actually given you, and the window the ship has.
Follow a delay through to the ship
A late train or a closed road is carried through the load-out, the stockpile and the window it puts at risk, while there is still room to move something.
Stop a plan that needs a rule broken
A schedule that only works if a driver runs past a rest rule, or a load that sits over a limit, reaches a person before it reaches a driver.
Build an evidence trail
Retain the sources read, the limits applied, the plan proposed, the confidence and every dispatcher amendment — on both paths.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Fleet & mine systems
- Wenco
- MineStar
- Modular
- load-out and weighbridge data
Transport & permits
- Access permits
- route conditions
- Fatigue records
- driver rosters
Rail & load-out
- Rail operator paths
- train order systems
- Load-out slots
- train-loading data
Agent
Logistics & dispatch
- Builds the plan
- Checks each load
- Routes what blocks it
Port & shipping
- Terminal line-up
- ship nominations
- Consignment notes
- dangerous goods
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six layers between the model and the road
Each control wraps the one inside it. A plan clears every layer before a dispatcher reads it, and the dispatch itself sits outside all six.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Decide whether a planned leg may stand
- L3
- Decides who may dispatch and who may sign
- L4 – L5
- Keep the record and the limits honest
- L6
- Pulls automation back when signals degrade
How Nestack evaluates it
Evaluate the whole movement — not only the plan a dispatcher opens.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the movement plan the dispatcher opens
- E1Final-output evaluationWas the plan runnable as written, on that route and those hours?
- E2Step-level evaluationDid it read the current permit, path and berth window?
- E3Tool evaluationDid it resolve the correct combination, path and stockpile?
- E4Confidence calibrationDo low-confidence plans actually attract more amendments?
- E5Slice evaluationHow does plan quality change across specific movement cohorts?
- E6Business outcomeWhat was re-timed, turned back at the port or needed a variation?
Floor — the cargo that actually moves
Failure modes
Where each failure originates in the agent
Seven failure modes plotted against the five stages of the agent lifecycle.
Agent lifecycle
Direction of processing →
01 · Retrieval
2 modes
- LG-01
Superseded permit read
A route condition changed since that permit was issued.
- LG-02
Stale berth line-up
The plan is built from a line-up taken days ago.
Stage gathers
Permits, paths, berth windows, balances and rosters
02 · Planning
2 modes
- LG-03
Plan needs a rest rule broken
The only sequence that works runs a driver past their hours.
- LG-04
Delay stops at the load-out
A late train is not carried through to the ship's window.
Stage proposes
Legs, times, loads and the order they must run in
03 · Limit check
1 mode
- LG-05
Axle limits pass, gross over
A combination clears each axle group and is over on gross.
Stage checks
Mass, dimension, route and hours against the limits
04 · Handoff / write
1 mode
- LG-06
Stale cargo declaration attached
A moisture figure is carried over from an earlier cargo.
Stage presents
The plan the dispatcher reads and its queue
05 · Change / Version
1 mode
- LG-07
Timetable change re-times quietly
A path change moves every leg with no named approver.
Stage tracks
Model, prompt, permit and timetable version changes
- Sev-1 · a legal limit or a duty is put at risk
- Sev-2 · a wrong plan reaches the dispatcher
- Sev-3 · planning goes stale, more is re-timed
Affected slices
The plans that fail are the ones off the usual circuit
Three things break a movement plan: rain on an unsealed road, a route only just permitted, and a dangerous-goods consignment. The daily rail circuit breaks almost nothing. Nestack reports performance by slice, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Wet-season road movements | 5.0% | 3.3× | Review | |
| Newly permitted routes | 3.4% | 2.3× | Review | |
| Dangerous-goods consignments | 2.7% | 1.8× | Watch | |
| Established rail circuits | 1.4% | 0.9× | Normal |
Bar: re-timed-or-turned-back movement rate, lift vs. rail-circuit baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
A plan that failed is a constraint the agent had wrong
Re-timing the movement leaves the reason it failed untouched. What changes is the constraint it was planned on, the limit checked against, or the source read.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Dispatcher amendments or port rejections rise on a movement cohort.
- 02
Diagnose
Re-run the plan against what the permit actually said, not what was used.
- 03
Improve
A named owner approves the corrected constraint before a plan uses it.
- 04
Verify
Re-planned over past movements whose actual outcome is already known.
- 05
Learn
The corrected constraint is written into the rules the next plan is built from.
Learn → Detect
The return edge. A route, a mass limit or a fatigue rule is changed by the people who own it, never by the agent.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, transport data, planning and limit logic, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Workflow discovery and automation-boundary definition.Week 1
- 02Movement and dispatch process assessment.Week 1, Week 2
- 03Permit, route and fatigue rule sets.Week 1, Week 2
- 04Fleet, load-out and weighbridge data access.Week 2, Week 3
- 05Rail path and port line-up data access.Week 2, Week 3
- 06Movement planning and sequencing logic.Week 3
- 07Mass, dimension and route checking.Week 3, Week 4
- 08Consignment paperwork assembly.Week 4
- 09Evaluation suite, limit recall and regression cases.Week 4, Week 5
- 10Dispatcher review and amendment capture.Week 5
- 11Dispatch-system integration and write-back.Week 5, Week 6
- 12Observability, deployment and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne corridor, one product | ProductionProduction dispatch integration | AdvancedMulti-site, multi-corridor |
|---|---|---|---|
| Introduced at Pilot | |||
| Movement plan built leg by leg | ✓ | ✓ | ✓ |
| Mass, dimension and route checks per load | ✓ | ✓ | ✓ |
| Fatigue and hours tested against the plan | ✓ | ✓ | ✓ |
| Knock-on effect of a delay worked through | ✓ | ✓ | ✓ |
| Consignment and dangerous-goods paperwork | ✓ | ✓ | ✓ |
| Dispatch stays with the dispatcher | ✓ | ✓ | ✓ |
| Baseline evaluation | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Dispatcher review workflow and write-back | — | ✓ | ✓ |
| Observability and evaluation | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multiple sites, fleets and rail operators | — | — | ✓ |
| Group networks and enterprise controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on the number of corridors and products, fleet, rail and port integrations, permit and document complexity, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01How a movement is planned and released on your site today
→Movement and dispatch process assessment
Week 102The access permits, route conditions and fatigue rules you run under
→Permit, route and fatigue rule sets
Week 103Access to fleet, load-out and weighbridge data
→Fleet, load-out and weighbridge data access
Week 204Your rail paths and the port line-up as you receive it
→Rail path and port line-up data access
Week 205Your consignment and dangerous-goods document set
→Consignment and dangerous-goods paperwork
Week 406Movements that went wrong, and the ones that nearly did
→Evaluation suite, limit recall and regression cases
Week 407A named dispatcher to review plans
→Dispatcher review workflow, then pilot plans and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Phases are drawn over the weeks they actually occupy. Week 5 carries both the evaluation work and the first plans a dispatcher reads.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Dispatch process, permits and the automation boundary
W2Fleet, load-out, rail path and port line-up data wired in
W3Movement planning, sequencing and the limit checks
W4Evaluation suite, limit recall and document assembly
W5Dispatch write-back, supervised plans and targeted corrections
W6A full dispatch cycle run beside the existing board, then Agent Care takes over
- Reading the band
- Limit checks are drilled in week 4 on movements that have already run. A mass limit read wrong is not a scheduling error, so it is not left for the pilot to find.
- At the end of W6
- A live dispatch cycle has run beside the existing board and the re-timed plans have been counted against what broke them, then Agent Care takes over monitoring.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Mining AI agent
Build a dispatch agent around your pit-to-port chain.
Show us the movement you run most, the permits it travels under and who releases a load today. A week later you have that movement planned leg by leg, with the legs no plan can close without a person deciding named as such.
- Typical delivery
- 4–6 weeks
- Deployment
- Your dispatch stack
- Dispatch
- Dispatcher, always
- After launch
- Agent Care available
Nestack Agents · Logistics & dispatch
AGT-MN-05 · Agent Care available after launch