Mining AI agent · Process control
Process-Control & Monitoring AI Agent (Processing Plant)
Explain what moved before an excursion, propose a setpoint change with the evidence beside it and check that change against the operating envelope — while the operator and the metallurgist keep every change.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Setpoint change
- Operator only
- After launch
- Agent Care
What this agent does
Watches the plant, writes nothing to it
In
- 01
Take the excursion, the alarm event and the tag trend as the control system and the historian hold them.
- 02
Read the laboratory results, the unit states, the blend that changed and the work done on the circuit.
Reason
- 03
Assemble what moved before the excursion — which tags, in what order, and which instruments can be trusted.
- 04
Propose a setpoint change against the circuit's control philosophy, with the trends and samples behind it.
- 05
Test the proposal against the operating envelope, the constraints in force and the interlocks holding the unit.
Decide
- 06
Test each reading against its calibration date and its drift and freeze checks, and show what a tag that fails has fed.
- 07
Route anything touching the envelope, a protective layer or the deposition plan to the metallurgist or the superintendent.
Out
- 08
Present the account, the proposal and the envelope check as drafts, with the source tags beside them.
- 09
Draft the shift handover and the unreconciled metallurgical picture, and retain every operator amendment.
Product statement
The agent watches, explains, proposes and checks. Writing a setpoint, changing a loop mode, moving an alarm limit and authorising a deposition stay with the named person.
Example workflow
One excursion, end to end
- 1Excursion detectedA tag leaves its normal band, an alarm is raised, or an operator asks what is happening to a circuit
- 2Plant data gatheredTag trends either side of it, laboratory results, unit states, the blend that changed and work done on the circuit
- 3Account assembledWhat moved, in what order, and which of it the instruments can actually be trusted on
- 4Proposal checkedA setpoint change tested against the operating envelope, the constraints in force and the interlocks holding the unit
No human action required
Stages 1 to 4 run without a person in the loop — detection, gathering and the envelope check finish before anyone is asked to read anything. Nothing on the plant changes in that stretch.
Reaches the operator as a complete account.
Goes to the metallurgist before it goes further.
Control-room operator or metallurgist
Reads the account, the evidence, the envelope check and what is unresolved, then decides whether anything on the plant changes.
Accept account · Amend · Escalate
Account accepted — handed back
- 6Handed to the control roomPresented to the operator as a proposal; no setpoint, loop mode, alarm or deposition is changed by the agent
- 7Outcome evaluatedWhat the operator amended, what the shift review concluded, and what the reconciled balance later showed
Amendments
What the operator corrects at the desk is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Writing a setpoint to the control system.
- Putting a loop in or out of automatic.
- Starting, stopping or isolating any unit.
- Acknowledging, shelving or suppressing an alarm.
Automation boundary
Agent acts unaided
- ✓Explain an excursion and what moved in the hours before it.
- ✓Propose a setpoint change with the evidence behind it.
- ✓Test a proposal against the operating envelope and the constraints in force.
- ✓Draft the shift handover and the unreconciled metallurgical picture.
Write actions run only inside the approval boundaries agreed during implementation. A setpoint is never one of them.
- Changing an alarm limit or a trip setting.
- Overriding an interlock or a permissive.
- Authorising a deposition, a discharge or a transfer.
- Signing a metallurgical balance or a production figure.
Example output
One excursion, annotated
Everything the agent proposes is attached to the tags, the samples and the shift it came from.
Excursion account · one circuit, one shift
Illustrative example- Excursion as raised
- Rougher circuit out of band
- Circuit
- Flotation, after a blend change
- Envelope rev
- Rev 8
- Proposed
- Setpoint change, for review
- Confidence
- 84%
- Setpoint
- Not written by the agent
As received
The excursion as the control system raised it, the circuit it sits in and the envelope revision current at that moment.
Evidence used
- Tag trends either side
- Shift composite assay
- Blend and reagent change
Why it stops here
The proposal sits inside the envelope, but the analyser feeding it is past calibration.
What the score decides
Confidence decides how hard the operator reads this, not whether the setpoint moves.
Action
Accept accountAmendEscalateValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every excursion the plant raises
From the control system and the historian
Read the circuit's own limits
Use the control philosophy for that unit, the operating envelope, the constraints in force this shift and the interlocks holding it.
Explain the excursion, not just flag it
The trends, the laboratory results, the blend change and the work done arrive as one account, while the shift still has room to act on it.
Send the envelope case up, not out
A proposal that sits outside the envelope, and anything reading against the deposition plan, goes to the metallurgist and the superintendent rather than onto a control-room screen.
Build an evidence trail
Retain the tags and samples read, the envelope revision, the proposal, the confidence and every operator amendment — on both paths.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Control & historian
- DCS
- PLC
- SCADA
- Process historians
- OPC UA
Plant instrumentation
- Online analysers
- particle size
- Density, flow and level
- weightometers
Laboratory & metallurgy
- LIMS
- shift composites
- Mass balance
- metallurgical accounting
Agent
Process control & monitoring
- Explains the excursion
- Proposes a setpoint
- Routes to the operator
Alarm & shift records
- Alarm and event logs
- shift logs
- Handover records
- deposition records
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six layers between the model and the control system
Each control wraps the one inside it. A proposal clears every layer before an operator reads it, and writing it to the plant sits outside all six.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Decide whether a reading may be trusted
- L3
- Decides whether a proposal may stand
- L4 – L5
- Keep the change with a person and the record intact
- L6
- Pulls automation back when signals degrade
How Nestack evaluates it
Evaluate the whole account — not only the proposal an operator reads.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the account the operator opens
- E1Final-output evaluationWas the account right about what actually moved, and in what order?
- E2Step-level evaluationDid it read the current envelope, constraint and control philosophy?
- E3Tool evaluationDid it resolve the correct tag, unit and laboratory sample?
- E4Envelope recallHow many proposals against the envelope or a protective layer were held?
- E5Slice evaluationHow does account quality change across specific excursion cohorts?
- E6Business outcomeWhat did the operator amend, and what did the shift review find?
Floor — what the shift review and the balance later showed
Failure modes
Where each failure originates in the agent
Seven failure modes plotted against the five stages of the agent lifecycle.
Agent lifecycle
Direction of processing →
01 · Retrieval
2 modes
- PC-01
Drifting analyser read as ore
A slow instrument drift is explained as a change in the feed.
- PC-02
Deposition reading read as ordinary
A pond, beach or freeboard reading outside the plan is shown as normal movement.
Stage gathers
Tag trends, laboratory results, states and the envelope
02 · Analysis
2 modes
- PC-03
Correlation given a direction
Two tags that moved together are presented as cause and effect.
- PC-04
Proposal built on a stale envelope
The envelope revision used was superseded at the last change.
Stage proposes
What moved, in what order, and the setpoint to consider
03 · Envelope check
1 mode
- PC-05
Permissive not read into the check
A proposal assumes a unit that a permissive is holding out.
Stage checks
The envelope, the constraints and the interlocks in force
04 · Handoff / write
1 mode
- PC-06
Output adds to the operator's load
So much is raised beside the alarm system in an upset that it stops being read.
Stage presents
The account the operator reads and where it sits
05 · Change / Version
1 mode
- PC-07
Philosophy change untracked
An envelope or control-philosophy change reaches the agent with no named approver.
Stage tracks
Model, prompt, envelope and philosophy changes
- Sev-1 · plant or a protective layer is exposed
- Sev-2 · a wrong account reaches the operator
- Sev-3 · analysis degrades, more is amended
Affected slices
The hours after the ore changes are where this fails
Most of a shift is steady state on a familiar blend and those accounts hold up. The hours after a feed change do not, nor does a circuit whose analyser has drifted, nor a plant in upset. Nestack reports performance by slice, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Hours after a blend change | 4.8% | 3.0× | Review | |
| Circuits with a drifting analyser | 3.4% | 2.1× | Review | |
| Plant already in an upset | 2.9% | 1.8× | Watch | |
| Steady state, familiar blend | 1.3% | 0.8× | Normal |
Bar: amended-or-withdrawn account rate, lift vs. steady-state baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
A setpoint that worked once is not an explanation
Amending the account for one shift leaves the reason it read wrong in place. What changes is the tag it trusted, the envelope, or the rule that raised it.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Operator amendments or shift-review findings move in a cohort.
- 02
Diagnose
The shift review already named the cause; the question is which tag the agent trusted to get somewhere else.
- 03
Improve
The tag rule or envelope reference goes through management of change, with an approver.
- 04
Verify
Replayed over past excursions the plant has already reviewed to a cause.
- 05
Learn
The excursion is kept for replay and the philosophy note the operators read is amended.
Learn → Detect
The return edge. An operating envelope or a control philosophy is changed under management of change, never by the agent.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, plant data sources, analysis and envelope logic, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Workflow discovery and automation-boundary definition.Week 1
- 02Control-room and shift-handover assessment.Week 1, Week 2
- 03Operating envelope and constraint capture.Week 1, Week 2
- 04Historian, analyser and LIMS data access.Week 2
- 05Excursion detection and account assembly.Week 2, Week 3
- 06Setpoint proposals and evidence linking.Week 3
- 07Instrument-health and drift marking.Week 3, Week 4
- 08Envelope, constraint and deposition checks.Week 4
- 09Evaluation suite, envelope recall and regression cases.Week 4, Week 5
- 10Operator review and amendment capture.Week 5
- 11Handover and metallurgical-picture drafting.Week 5, Week 6
- 12Observability, deployment and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne circuit, one plant | ProductionProduction control-room integration | AdvancedMulti-plant / multi-circuit |
|---|---|---|---|
| Introduced at Pilot | |||
| Excursion accounts from your own historian | ✓ | ✓ | ✓ |
| Setpoint proposals with the evidence attached | ✓ | ✓ | ✓ |
| Operating-envelope and constraint checking | ✓ | ✓ | ✓ |
| Calibration, drift and freeze tests on each tag | ✓ | ✓ | ✓ |
| Deposition limits read, never proposed against | ✓ | ✓ | ✓ |
| No write path to a setpoint, mode or alarm | ✓ | ✓ | ✓ |
| Baseline evaluation | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Operator review workflow and shift handover | — | ✓ | ✓ |
| Observability and evaluation | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multiple plants, circuits and control systems | — | — | ✓ |
| Group reporting and enterprise controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on the control and historian systems in scope, the number of circuits and plants, analyser and laboratory sources, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your control philosophy and the envelope each circuit runs to
→Operating envelope and constraint capture
Week 102How an excursion reaches your control room today, and who acts
→Control-room and shift-handover assessment
Week 103Access to the historian, the online analysers and the LIMS
→Historian, analyser and LIMS data access
Week 204Your calibration records and which tags you already distrust
→Instrument-health and drift marking
Week 305Your deposition plan, its limits and who is told when one moves
→Envelope, constraint and deposition checks
Week 406Excursions you have already reviewed to a cause
→Evaluation suite, envelope recall and regression cases
Week 407Named operators and a metallurgist to review accounts
→Operator review workflow, then pilot shifts and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Phases are drawn over the weeks they actually occupy. Week 5 carries both the evaluation work and the first shifts an operator reads accounts on.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Control philosophy, the envelope and the automation boundary
W2Historian, analyser and laboratory sources wired in
W3Excursion accounts and setpoint proposals on the first circuit
W4Evaluation suite, envelope recall and instrument-drift tests
W5Control-room presentation, supervised shifts and corrections
W6Operators read live accounts beside their own board, then Agent Care starts
- Reading the band
- The envelope and instrument-health tests come before anything is put in front of an operator. Week 4 exists so that week 5 is not the first time either is checked.
- At the end of W6
- Operators have read live accounts against their own board and the metallurgist has amended what did not survive the shift review, then Agent Care takes over monitoring.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Mining AI agent
Build a process-control agent around your control room.
Show us one circuit, the envelope it runs to and how an excursion is written up today. That excursion then has two accounts, the shift's and the agent's, and you decide which of them read the instruments and which one guessed.
- Typical delivery
- 4–6 weeks
- Deployment
- Your control-room stack
- Setpoint change
- Operator, always
- After launch
- Agent Care available
Nestack Agents · Process control & monitoring
AGT-MN-07 · Agent Care available after launch