Facilities AI agent · Refrigerant management

Energy & HVAC Compliance AI Agent

Tally every refrigerant addition against the appliance that took it under 40 CFR 84.106, run the repair and verification clocks, and hold the plan an authorized company official signs.

Typical delivery
4–6 weeks
Deployment
Your stack
One signer
Charge-clocked
After launch
Agent Care

What this agent does

Holds the charge ledger, never the signature

In

  1. 01

    A charge is added, and § 84.106(d) starts the repair clock once the leak rate is crossed.

  2. 02

    A leak rate is computed, and § 84.106(c)(2) sets a separate threshold per appliance type.

Reason

  1. 03

    A repair closes, and § 84.106(d) wants a verification test inside it and another after it.

  2. 04

    An inspection falls due, and § 84.106(g) fixes its frequency by appliance type and charge.

  3. 05

    An appliance is newly installed above the size threshold, and § 84.108 wants detection on it.

Decide

  1. 06

    An older appliance carries none, and § 84.108 sets 1 January 2027 for the ALD retrofit.

  2. 07

    An ODS-charged chiller survives, and § 82.157 keeps it in part 82 on its own charge test.

Out

  1. 08

    A covered building shuts its year, and NYC Admin. Code § 28-320.3.7 sets 1 May to file.

  2. 09

    Execute write actions only inside the approval boundaries agreed during implementation.

Product statement

The agent holds the appliance ledger and runs the clocks. An authorized company official signs the plan and the chronic-leak report.

Example workflow

One appliance, charge to signature

  1. 1Charge evidence receivedContractor service tickets, cylinder records, inspection reports or detection alarms
  2. 2Appliance context assembledThe appliance, the site it serves, the part it answers to and the day the charge went in
  3. 3Leak-rate evidence draftedThe appliance, the additions behind it, the clocks now running and completeness
  4. 4Controls appliedThreshold checks, charge-provenance checks, clock checks and completeness confidence

No human action required

Stages 1 to 4 run unaided, and nothing is signed at any of them — the agent is assembling, and the engineering lane opens at the completeness gate.

5DecisionSplits at the completeness gate
Evidence sufficient

Goes to the authorized company official to sign.

Anything thin

Adds an engineering read first.

Engineering review

The appliance is held with its additions, its clocks and the site it sits on.

Sign · Append evidence · Send to engineering

Signed — by an authorized company official

  1. 6Appliance and charge records updatedOnly where write access and records policy allow it
  2. 7Outcome evaluatedLeak-rate accuracy, clock coverage, engineer corrections and what the read found

Corrections

Each engineering correction is counted in the evaluation.

What should not run autonomously

Human approval stays in control

Outside the boundary — human approval required

8 items

  • Signing a retrofit or retirement plan, § 84.106(l)(8).
    • Signing the chronic-leak report under § 84.106(m)(4).
    • Certifying a Local Law 97 report over a sealed attestation.
    • Electing to retrofit an appliance rather than repair it.
  • Automation boundary

    Agent acts unaided

    • ✓Hold the appliance register and the full charge each one carries.
    • ✓Attribute every refrigerant addition to the service ticket behind it.
    • ✓Compute the leak rate per appliance and run the repair.
    • ✓Watch both reporting deadlines and flag the appliance.

    Nothing here is signed or filed except by a named person, inside the agreed boundaries.

    • Judging whether a repair in fact closed the leak.
    • Choosing the leak-rate calculation method.
    • Requesting an extension of the repair clock.
  • Changes to the appliance register or the charge ledger.

Example output

One appliance, annotated

Our maintenance triage agent works a tenant repair to a statutory clock; this record is what one refrigerant addition carried onto the ledger.

Ledger entry · single appliance

Illustrative example
Appliance
Refrigerant added, § 84.106(l)(2)
Recorded as
Read against the leak-rate threshold
Test
Repair clock running
Evidence of record
Technician service ticket
Confidence
Held unsigned
Held for
The authorized company official, by name

As received

Taken from the service ticket and the cylinder record — it reaches as far as those sources do.

What the record holds

  • Service ticket
  • Cylinder record
  • Full-charge document

Why no signature here

Whether an appliance is repaired is a § 84.106 judgement, not a model output.

What the score decides

Below the configured threshold an appliance picks up an engineering read before signature.

Action

SignAppend evidenceSend to engineering

Value

Where AI adds value

The same four claims, placed at the point in the workflow where each one applies.

Where the value lands

Value 01 – 04

Every addition

From the appliance that took it

03Evidence

Where the evidence is used

Our environmental permit reporting agent owns Title V, which binds because you hold a permit, whereas § 84.106 is self-executing and equipment-attached, clocked by the act of adding refrigerant — different signer, different deadline type, different evidence — and the energy-utilities pages are utility-side, not building-side.

01Approved path

A leak starts a clock

A mixed estate sits under both parts at once: § 82.157 became ODS-only at 85 FR 14171, 10 April 2020, yet § 84.102 still defines a certified technician by reference to § 82.161.

02Human review

What was checked, and not found

The § 84.112 fire-suppression reporting date is single-sourced and is withheld here, the road and intermodal transport-refrigeration carve-out was still only proposed on 26 May 2026 and does not reach buildings, no petition for review against the subpart C rule could be confirmed either way, and OSHA 29 CFR 1926.1101 was not examined.

04

Build an evidence trail

The appliance, the charge added to it and the official who signed stay on the record.

Integrations

Typical integrations

Five system groups connect to the same agent. Which of them are in scope is decided in discovery.

  • Service and technician sources

    • Contractor tickets
    • cylinders
    • Refrigerant addition records
  • Appliance and charge register

    • CMMS
    • asset register
    • Full-charge documentation
  • Detection and monitoring

    • ALD alarms
    • calibration
    • Audit and calibration logs

Agent

Energy and HVAC compliance

  • Reads the additions
  • Computes the leak rate
  • Holds for the official
  • Metering and filing systems

    • Benchmarking
    • utility feeds
    • Consumption and filing records
  • Observability & evaluation

    • OpenTelemetry
    • Langfuse
    • Supported monitoring/evaluation sources

Integration availability depends on the client's existing systems and API access.

Agent controls

Six valves between the model and the official

Six valves opened in turn, the last barely at all. Whatever still flows is set out in the map below.

L6 · Outermost — last line of defence

Inward → L1 · closest to the model

L6Rollback / safe modeNarrow the agent to evidence assembly when evaluation or production signals degrade.Roll back
L5Version monitoringTrack model, prompt and leak rules; 89 FR 82859, 11 October 2024 bound repair, inspection and records from 1 January 2026, and reclaimed refrigerant follows on 1 January 2029.Track
L4TraceabilityRecord each appliance, the additions behind it, the site it serves and every read of the ledger.Record
L3Official releaseHold the plan for an authorized company official under § 84.106(l)(8); the hold governs release, not whether a leak was ever repaired.Gate
L2Threshold guardrailsTest each appliance against § 84.106 as configured; § 84.108 puts detection on new large systems now and on 2017 to 2025 systems from 1 January 2027.Restrict
L1Confidence thresholdsRoute a thin appliance file to an engineering read first; Local Law 97 survived preemption at the Court of Appeals on 22 May 2025.Require review
Model coreEvidence assembled — the appliance, the additions, the clocks and completeness
L1 – L2
Test whether a leak rate may stand
L3
Puts the signature in a person's hands
L4 – L5
Keep the appliance and the charge behind it
L6
Leaves the plan unsigned when signals degrade

How Nestack evaluates it

Evaluate the whole assembly — not only the leak rate that comes out.

Coverage runs the whole depth of the workflow, and every layer is cut by slice.

Surface — the plan an inspector reads

  1. E1Final-output evaluationDid the ledger record what the appliance actually took?
  2. E2Step-level evaluationDid the agent read the right appliance, the right charge and the live register?
  3. E3Tool evaluationDid it read and write the correct appliance record and the correct ticket?
  4. E4Confidence calibrationDo low-confidence appliances actually attract more engineering corrections?
  5. E5Slice evaluationHow does performance change across specific appliance types?
  6. E6Business outcomeHow many appliances needed a correction before the official signed?

Floor — the ledger the owner answers for

Failure modes

Where each failure originates in the agent

Seven failure modes, each pinned to the stage where it first shows.

Agent lifecycle

Direction of processing →

  1. 01 · Retrieval

    1 mode

    • KK-03

      Stale charge read

      The full charge read is not the one now in the appliance.

    Stage gathers

    The appliance, the tickets, the charges and dates

  2. 02 · Reasoning

    2 modes

    • KK-04

      Leak rate computed early

      A rate is computed before the charge is complete.

    • KK-06

      Wrong part applied

      An ODS appliance is worked under part 84.

    Stage proposes

    The appliances, their clocks and completeness

  3. 03 · Tool / write

    2 modes

    • KK-02

      Thin file passed forward

      A file moves on without the engineering read.

    • KK-05

      Bound to the wrong appliance

      A charge is filed against the wrong unit.

    Stage writes

    Only where write access and approval policy allow it

  4. 04 · Output

    1 mode

    • KK-01

      Signed, evidence unrecorded

      The record shows a signature but not what supported it.

    Stage returns

    The plan an official signs and an inspector reads

  5. 05 · Change / Version

    1 mode

    • KK-07

      Silent clock regression

      A configuration change moves the clock, not the charge.

    Stage tracks

    Model, prompt, leak rules and ledger fields

  • Sev-1 · a plan signed on no service record
  • Sev-2 · wrong charge reaches the ledger
  • Sev-3 · source degrades, plan held unsigned
See the complete Facilities failure-mode catalogue

Affected slices

Process refrigeration absorbs the corrections

An appliance-level charge-provenance figure can read clean while industrial process refrigeration carries most of the rework. Nestack reports the correction rate by appliance type, not only in total.

Slice performance — reported separately, not only in aggregate

Illustrative example
SliceFailure rateLiftLift vs. thresholdStatus
Industrial process refrigeration8.8%3.6×Review
Commercial refrigeration6.3%2.6×Review
ODS-charged legacy appliances3.9%1.6×Watch
Comfort cooling chillers1.6%0.7×Normal

Bar: correction-rate lift vs. comfort cooling baseline · scale 0–4.0× · tick marks the 2.0× review threshold

2 of 4 slices over threshold

Evidence-linked improvement

What an untracked recharge costs

A cycle closes when the untracked recharge is a regression case. That suite is what the next appliance assessed is measured against.

Improvement cycle · five stages

Switchback — the path turns at Improve and returns at Learn

  1. 01

    Detect

    Correction rate rises on industrial process refrigeration.

  2. 02

    Diagnose

    The chiller topped up twice in a season, on a ticket nobody totalled, is read back until one cause remains.

  3. 03

    Improve

    The change ships numbered, and the appliances that forced it ride with it.

  4. 04

    Verify

    Nothing releases while one touched appliance case is still red.

  5. 05

    Learn

    It is retained for good, and the leak rules are amended in that same commit.

  6. Learn → Detect

    The return edge. The next appliance is measured against a suite one case longer.

Typical build scope

Twelve workstreams across six weeks

The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, ledger assembly, evaluation, integration, then production validation and handover.

Workstream

Week 1Week 2Week 3Week 4Week 5Week 6

  1. 01Leak-rate-threshold and automation-boundary work.Week 1
  2. 02Service-ticket and cylinder sources.Week 1, Week 2
  3. 03Appliance-to-threshold and clock-coverage mapping.Week 1, Week 2
  4. 04Charge and addition ingestion.Week 2
  5. 05Appliance, charge and ticket binding.Week 2, Week 3
  6. 06Completeness scoring and review routing.Week 3
  7. 07Official signing workflow.Week 3, Week 4
  8. 08Asset-register system integration.Week 5
  9. 09Leak-rate and threshold cases.Week 4, Week 5
  10. 10Guardrails and signing controls.Week 4
  11. 11Appliance-trail instrumentation.Week 5, Week 6
  12. 12Deployment, documentation and Agent Care handover.Week 6

12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel

Final scope and sequence confirmed in discovery

Engagement tiers

What each tier includes

Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.

Capability✓ in scope · — not at this tierPilotOne site, one yearProductionProduction compliance workflowAdvancedMultiple sites / portfolios
Introduced at Pilot
Ledger assembly to your appliances✓✓✓
Authorized official release✓✓✓
Charge-inventory baseline✓✓✓
Introduced at Production
Reporting by appliance—✓✓
Signing workflow in your systems—✓✓
Approved write-back—✓✓
Service-ticket integration—✓✓
Introduced at Advanced
Multi-site portfolios——✓
Cross-year evidence packs——✓
Large appliance estates——✓
Multi-regime deadline controls——✓
Build priceFrom $5,000From $8,000Custom quote
Final build price
Confirmed after discovery based on integrations, workflow complexity, appliance volume, approval controls and deployment requirements.
Separate from build
Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.

What we need from you

What you bring, and what we build with it

Each input maps to a piece of build scope and a week in the delivery timeline.

  1. 01Your appliances and the full charge each one carries

    Appliance-register mapping and charge capture

    Week 1
  2. 02Representative service, cylinder and inspection records

    Record binding, threshold logic and the leak-rate baseline

    Week 2
  3. 03Your calculation method under § 84.106(l)(3)

    Threshold mapping, clock binding and the automation boundary

    Week 1
  4. 04Access to relevant APIs, feeds or exports

    Service, cylinder and register-source assessment, then integration setup

    Week 2
  5. 05Appliances you would not want audited

    Leak cases and the evaluation run

    Week 4
  6. 06What no service record may settle

    Completeness scoring, review routing, guardrails and release controls

    Week 3
  7. 07An authorized company official who may sign

    Signing workflow, then pilot and production validation

    Weeks 5–6

Nothing else is required

Deployment, documentation and Agent Care handover are ours.

Delivery timeline

Four phases across six weeks

These widths measure the work rather than the page, which is why a single week carries two phases.

Phase

W1

W2

W3

W4

W5

W6

  1. DiscoveryW1
  2. BuildW2 – W3
  3. EvaluateW4 – W5
  4. Pilot & LaunchW5 – W6

Week focus

W1Refrigerant workflow discovery, threshold mapping and the automation boundary

W2Source integration and the charge-provenance baseline

W3Ledger assembly, clock logic and release controls

W4Evaluation suite, leak-rate cases and failure-mode testing

W5Register integration, pilot appliances and targeted corrections

W6One compliance year run under the authorised official, then Agent Care handover

Reading the band
Each bar covers only the weeks its own work is named for. Week five holds two because the work holds two.
At the end of W6
When the appliance record validates, Agent Care takes the agent on.
Duration
Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.

Next step · Facilities AI agent

Build a refrigerant agent around the chiller that was topped up twice and totalled once.

Show us one appliance and the charge it took. An authorized company official signs the retrofit or retirement plan under § 84.106(l)(8) and the chronic-leak report under § 84.106(m)(4); in New York City a registered design professional certifies the filing.

Typical delivery
4–6 weeks
Deployment
Your appliances
One signer
Charge-clocked
After launch
Agent Care available

Nestack Agents · Refrigerant management

AGT-AF-06 · Agent Care available after launch

Build a refrigerant agent

Four questions so the call starts from your actual setup — then pick a time that suits you.

About you
Your appliances

No obligation. We’ll map the workflow, name the automation boundary and tell you if an agent is the wrong answer.