Facilities AI agent · Request triage
Facilities Request Triage AI Agent
Ground every request in the asset it names, classify it against the severity scheme your own estate runs, and hand anything touching life safety to a named person.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Person decides
- Severity shown
- After launch
- Agent Care
What this agent does
Routes the request, never dispatches the trade
In
- 01
A request arrives, and what an occupant describes is a symptom; the fault behind it is still to be found.
- 02
An asset is named, and a request nobody can tie to the register is incomplete rather than urgent.
Reason
- 03
A class is set against your own scheme, and the agent shows the wording it read alongside what it decided.
- 04
A request touches life safety, security or access control, and it leaves the queue for a person.
- 05
A trade accepts, and that acceptance belongs on the trade record; what an occupant hears is written apart.
Decide
- 06
A repeat lands, and one fault reported three times over is a finding about the asset, not noise to bury.
- 07
A ticket ages, and the agent chases and escalates on your rules while closing nothing for anybody else.
Out
- 08
A job is called done, and nothing is marked resolved that the agent did not itself observe resolved.
- 09
Execute write actions only inside the approval boundaries agreed during implementation.
Product statement
The agent classifies, routes, chases and escalates. A named person dispatches the trade, accepts the work and closes the ticket.
Example workflow
One request, intake to dispatch
- 1Request evidence receivedOccupant reports, helpdesk calls, sensor alerts or inspection notes
- 2Request context assembledThe fault described, the asset it points at, the building it sits in and the scheme it is read against
- 3Routing proposal draftedThe request, the asset, the severity class and completeness
- 4Controls appliedAsset-match checks, severity checks, duplicate checks and routing confidence
No human action required
Stages 1 to 4 run unaided, and nothing is dispatched at any of them — the agent is triaging, and the facilities lane opens at the completeness gate.
Goes to the facilities manager to dispatch.
Adds a facilities coordinator read first.
Facilities review
The request is held with its asset, its severity class and the wording it was read on.
Dispatch · Append evidence · Send to facilities
Dispatched — by the facilities manager
- 6Work order and asset records updatedOnly where write access and records policy allow it
- 7Outcome evaluatedRouting accuracy, severity coverage, coordinator corrections and what the review found
Corrections
Each coordinator correction is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Dispatching a trade into an occupied building.
- Setting the severity a request is run under.
- Closing a ticket on behalf of a trade.
- Calling a reported fault resolved without looking.
Automation boundary
Agent acts unaided
- ✓Tie each request to one asset in the register before it.
- ✓Classify against the severity scheme your own estate.
- ✓Show the wording a class was read on, beside the class itself.
- ✓Chase the trade that accepted, and escalate on the rules you set.
Nothing is dispatched or closed except by a named person, inside the agreed boundaries.
- Judging whether a fault is what it was reported as.
- Telling an occupant when a trade will attend.
- Setting the response rules a severity class carries.
- Changes to assets, trades or severity schemes.
Example output
One request, annotated
This record is what one request carried between the occupant who raised it and the trade who took it on.
Work order · single request
Illustrative example- Request
- Door will not latch, Sev-2
- Recorded as
- Tied to one asset in the register
- Severity
- Fire door, escalated
- Evidence of record
- Occupant report, 3 August 2026
- Confidence
- Held undispatched
- Held for
- The facilities manager, by name
As received
Taken from the occupant report and the asset register — it reaches as far as those sources do.
What the record holds
- Occupant report
- Asset register entry
- Prior fault history
Why no dispatch here
Whether a trade attends this door is a facilities call, not a model output.
What the score decides
Below the configured threshold a request picks up a coordinator read before dispatch.
Action
DispatchAppend evidenceSend to facilitiesValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every request
From the occupant who raises it
Where the evidence is used
Our maintenance triage agent works tenant repairs against a statutory clock for a property manager; here there is no tenant and no statute, and the discipline is routing and severity.
The ticket is not the fault
A ticket records what somebody reported and what was done about it; whether the fault has gone is settled by a person who looked, never by a status field.
What was checked, and not found
No statute was located that fixes how an internal facilities request must be classified, how quickly a trade must attend or when a work order may be closed, and none is claimed here: the severity scheme, the response rules and the closure test are all set by the customer.
Build an evidence trail
The request, the asset it names and the trade who accepted it stay on the ticket.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Request and intake sources
- Helpdesk
- occupant portal
- Occupant and sensor reports
Asset and space register
- CAFM
- asset register
- Asset records and locations
Trades and contractors
- Trade rota
- contracts
- Trade and coverage records
Agent
Facilities request triage
- Reads the request
- Routes to the trade
- Holds for the manager
Work order systems
- CMMS
- ticketing
- Ticket and closure records
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six hurdles between the model and the manager
Six hurdles set in line, the tallest at the end. Whatever clears them all is named in the map below.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether a routing may stand
- L3
- Puts the dispatch in a person's hands
- L4 – L5
- Keep the request and the asset behind it
- L6
- Holds the dispatch unmade when signals degrade
How Nestack evaluates it
Evaluate the whole triage — not only the work order that comes out.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the ticket an occupant reads
- E1Final-output evaluationDid the ticket name the asset the fault actually sits on?
- E2Step-level evaluationDid the agent read the right asset, the right scheme and a live rota?
- E3Tool evaluationDid it read and write the correct asset record and the correct ticket?
- E4Confidence calibrationDo weak asset matches actually attract more coordinator corrections?
- E5Slice evaluationHow does performance change across specific asset classes?
- E6Business outcomeHow many requests needed a correction before a trade was sent?
Floor — the estate the occupier answers for
Failure modes
Where each failure originates in the agent
Seven failure modes, each named where in the run it first shows up.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- KH-03
Stale register read
The asset record read is not the one now in service.
Stage gathers
The requests, the assets, the trades and the wording
02 · Reasoning
2 modes
- KH-04
Severity read too low
A life safety fault is routed as a repair.
- KH-06
Room taken for the asset
A ticket names a place and no equipment.
Stage proposes
The requests, their severity and completeness
03 · Tool / write
2 modes
- KH-02
Weak match passed forward
A request moves on without the coordinator read.
- KH-05
Repeat report suppressed
A recurring fault is merged away unseen.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- KH-01
Dispatched, asset unrecorded
A dispatch sits on the record with no asset behind it.
Stage returns
The work order a trade reads and a manager owns
05 · Change / Version
1 mode
- KH-07
Silent severity regression
A configuration change moves the class, not the routing.
Stage tracks
Model, prompt, severity rules and ticket fields
- Sev-1 · a fire door routed as a light fitting
- Sev-2 · wrong asset reaches the work order
- Sev-3 · source degrades, ticket held unsent
Affected slices
Life safety work absorbs the corrections
A trade-level routing-accuracy figure can read clean while life safety and fire assets carry most of the rework. Nestack reports the correction rate by asset class, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Life safety and fire assets | 10.2% | 3.7× | Review | |
| Mechanical and plant assets | 7.3% | 2.6× | Review | |
| Electrical and lighting assets | 4.5% | 1.6× | Watch | |
| Fabric and fittings | 2.2% | 0.8× | Normal |
Bar: correction-rate lift vs. fabric and fittings baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
What a wrong severity costs
The loop shuts when the misrouted safety request is a regression case. That suite is what the next ticket triaged is measured against.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Correction rate rises on life safety and fire assets.
- 02
Diagnose
The request that read like a light fitting and was actually a fire door is read back until one cause remains.
- 03
Improve
Any change goes out numbered, with the requests that caused it attached.
- 04
Verify
One request case still failing is enough to hold the release back.
- 05
Learn
One case joins the suite, one line joins the triage record.
Learn → Detect
The return edge. The next request is measured against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, request triage, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Severity-scheme and automation-boundary discovery.Week 1
- 02Occupant, asset and trade sources.Week 1, Week 2
- 03Request-to-asset and severity-routing rule mapping.Week 1, Week 2
- 04Request and asset ingestion.Week 2
- 05Request, asset and trade binding.Week 2, Week 3
- 06Severity scoring and review routing.Week 3
- 07Manager dispatch workflow.Week 3, Week 4
- 08Work-order system integration.Week 5
- 09Routing and severity cases.Week 4, Week 5
- 10Guardrails and dispatch controls.Week 4
- 11Ticket-trail instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne site, one year | ProductionProduction triage workflow | AdvancedMultiple sites / estates |
|---|---|---|---|
| Introduced at Pilot | |||
| Triage to your severity scheme | ✓ | ✓ | ✓ |
| Facilities manager release | ✓ | ✓ | ✓ |
| Asset-register baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by trade | — | ✓ | ✓ |
| Dispatch workflow in your systems | — | ✓ | ✓ |
| Approved write-back | — | ✓ | ✓ |
| Work-order-system integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multi-site severity schemes | — | — | ✓ |
| Cross-site escalation packs | — | — | ✓ |
| Large request volumes | — | — | ✓ |
| Multi-site severity controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, request volume, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your severity scheme and what each class requires
→Scheme mapping and request capture
Week 102Representative occupant, asset and trade records
→Record binding, severity logic and the routing baseline
Week 203Your escalation rules and who may override one
→Severity mapping, asset binding and the automation boundary
Week 104Access to relevant APIs, feeds or exports
→Occupant, asset and trade-source assessment, then integration setup
Week 205Tickets you would not want reviewed
→Severity cases and failure-mode testing
Week 406What no request record may prove
→Severity scoring, review routing, guardrails and release controls
Week 307A named facilities manager to dispatch
→Dispatch workflow, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
What each bar spans is working time and not layout, so the fifth week has to carry two of them.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Triage workflow discovery, severity mapping and the automation boundary
W2Source integration and the request-routing baseline
W3Request triage, severity logic and release controls
W4Evaluation suite, routing cases and failure-mode testing
W5Work-order integration, pilot requests and targeted corrections
W6One maintenance season run under the facilities manager, then Agent Care handover
- Reading the band
- Each bar spans only the weeks its own work is named for. Two land together on the fifth because the work does.
- At the end of W6
- Once the ticket record validates, Agent Care assumes the agent.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Facilities AI agent
Build a triage agent around the request that named a room when the fault sat on an asset.
Show us one request and the asset it was tied to. Who settles that a request touching a fire door leaves the queue for a person — your own severity scheme does, and the agent shows the wording it classified on rather than the class alone.
- Typical delivery
- 4–6 weeks
- Deployment
- Your asset register
- Person decides
- Severity shown
- After launch
- Agent Care available
Nestack Agents · Facilities request triage
AGT-AF-03 · Agent Care available after launch
