Operations AI agent · Obligation tracking
Compliance Obligation Tracking AI Agent
Diarise a recurring obligation the day it lands, file the evidence under it as the evidence arrives, and hand the whole register to the named owner or operator who certifies it.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Owner certifies
- Evidence filed
- After launch
- Agent Care
What this agent does
Tracks the obligation, never certifies it
In
- 01
An obligation lands from a rule such as 40 CFR 68.79, and it enters the register with an owner.
- 02
A deadline recurs whether anybody is watching or not, so the clock runs off the rule, not the diary.
Reason
- 03
A five-year revalidation falls due under 68.67(f), and the evidence is checked before the date.
- 04
A change forces a revised hazard analysis, and 68.190(b)(5) sets six months from that change.
- 05
An incident occurs, and 68.81 starts a clock on beginning the investigation, not on finishing it.
Decide
- 06
An owner leaves, and each obligation filed under that name shows as unheld until somebody takes it.
- 07
An emergency contact changes, and 68.195(b) opens a one-month window nobody else is watching.
Out
- 08
An obligation lapses, and the lapse is written up as a finding rather than quietly closed out.
- 09
Execute write actions only inside the approval boundaries agreed during implementation.
Product statement
Tracking, evidencing and clock-keeping belong to the agent. The certification belongs to a named owner or operator, who makes the reasonable inquiry and signs.
Example workflow
One obligation, rule to certification
- 1Obligation identifiedRegulatory text, permit conditions, corporate standards or an existing compliance register
- 2Clock set from the ruleThe interval, the trigger that starts it, the next date it falls due and the owner who holds it
- 3Evidence assembledThe audits, revalidations, investigations and change records filed against the obligation
- 4Controls appliedRegister checks, evidence-age checks, owner checks and completeness confidence
No human action required
Stages 1 to 4 run unaided, and nothing is certified at any of them — the agent is tracking, and the owner lane opens at the completeness gate.
Goes to the named owner or operator.
Adds a process safety lead read first.
Owner review
The obligation is held with its evidence, its gaps and the date it next falls due.
Certify · Add evidence · Send to safety review
Certified — by the owner or operator
- 6Compliance records updatedOnly where write access and records policy allow it
- 7Outcome evaluatedClock accuracy, evidence currency, owner corrections and what review found
Corrections
Each owner correction is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Certifying that a submission is true and complete.
- Deciding that an obligation applies to this company.
- Conducting the reasonable inquiry behind a signature.
- Declaring a compliance audit adequate.
Automation boundary
Agent acts unaided
- ✓Set the clock from the rule that creates the duty.
- ✓File the evidence under the obligation it answers.
- ✓Show which obligations are unheld, unevidenced or overdue today.
- ✓Raise the next date due, and name the owner who must answer it.
Nothing is certified except by a named owner or operator, inside the agreed boundaries.
- Judging whether a hazard analysis needs revising.
- Accepting a declined recommendation as justified.
- Telling a regulator what a record means.
- Changes to the register, the clocks or the owners.
Example output
One obligation, annotated
This serves an operations team whose owner or operator has to certify under 40 CFR 68.185; below is one obligation exactly as the agent leaves it.
Obligation record · single duty
Illustrative example- Obligation
- Compliance audit, covered process
- Recorded as
- Due, evidence incomplete
- Interval
- Three-year cycle
- Evidence of record
- Audit report, 6 May 2026
- Confidence
- Held uncertified
- Held for
- The named owner or operator
As received
Assembled from the audit report and the change records on file, and it asserts nothing beyond them.
What the record holds
- Audit report
- Revalidation record
- Change record
Why no certification here
Certifying after inquiry is a judgement the owner or operator makes.
What the score decides
Below the configured threshold the obligation gets a safety-lead read before the owner.
Action
CertifyAdd evidenceSend to safety reviewValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every obligation
From the rule that creates it
Where the register sits
Horizon scanning watches instruments and the stage each has reached; this tracks the obligations you already have, the evidence filed against each and the clocks that recur.
The clock runs without you
A recurring duty comes round again and nothing in the stack says so, because the deadline lives in 40 CFR 68.190 and not in your calendar.
What was checked, and not found
Checked in the current text: the 2024 accident prevention rule is in force and codified, not stayed and not vacated, its challenge sits in abeyance and the rollback is proposed only, so the 68.10 date in May 2027 stands.
Build an evidence trail
The obligation, the evidence filed against it and the owner who holds it stay together.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Regulatory sources
- eCFR
- Federal Register
- Permit conditions and corporate standards
Process safety records
- Hazard analyses
- revalidations
- Management-of-change and incident records
EHS and compliance systems
- Intelex
- Enablon
- Sphera
- Cority
- VelocityEHS
Agent
Compliance obligation tracking
- Reads the obligations
- Files the evidence
- Holds for the owner
Audit and document stores
- Audit reports
- corrective actions
- Document management and records archives
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six locks between the model and the signature
Six locks on one door, the last the heaviest. What opens it is drawn in the map below.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether an obligation may stand
- L3
- Leaves the certification to a named owner
- L4 – L5
- Keep the obligation and the evidence behind it
- L6
- Holds the obligation open when signals degrade
How Nestack evaluates it
Evaluate the whole register — not only the obligation that comes due.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the obligation an inspector asks about
- E1Final-output evaluationDid the obligation record the rule and the clock it was actually tracked on?
- E2Step-level evaluationDid the agent read the current rule text, the right interval and the live register?
- E3Tool evaluationDid it read and write the correct obligation and the correct evidence file?
- E4Confidence calibrationDo low-confidence obligations actually attract more owner corrections?
- E5Slice evaluationHow does performance change across specific obligation types?
- E6Business outcomeHow many obligations needed a correction before the owner certified?
Floor — the evidence a certification rests on
Failure modes
Where each failure originates in the agent
Seven failure modes, each pinned to the stage where it starts.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- NK-03
Stale rule text read
The rule read is not the one that now applies.
Stage gathers
The rules, the clocks, the owners and the files
02 · Reasoning
2 modes
- NK-04
Clock set on the wrong trigger
A duty is dated from filing, not the event.
- NK-06
Obligation entered without basis
A duty is carried that no rule creates.
Stage proposes
The rule, the clock, the evidence and the gaps
03 · Tool / write
2 modes
- NK-02
Thin evidence file passed on
An obligation moves on without the safety read.
- NK-05
Evidence bound to wrong duty
The file is stored against another obligation.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- NK-01
Certified, gap unrecorded
The record shows a signature but not the missing evidence.
Stage returns
The obligation an owner signs and an auditor reads
05 · Change / Version
1 mode
- NK-07
Silent register decay
An owner leaves and the clock keeps running unheld.
Stage tracks
Model, prompt, clock rules and owner records
- Sev-1 · a certification signed on a gap
- Sev-2 · a recurring deadline passes unmet
- Sev-3 · source degrades, obligation held open
Affected slices
Event-driven clocks absorb the corrections
An obligation-level evidence figure can read clean while event-driven six-month clocks carry most of the corrections. Nestack reports the correction rate by obligation type, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Event-driven six-month clocks | 11.8% | 3.7× | Review | |
| Newly registered obligations | 8.4% | 2.6× | Review | |
| Obligations with shared owners | 5.3% | 1.7× | Watch | |
| Established annual obligations | 2.1% | 0.7× | Normal |
Bar: correction-rate lift vs. established-obligation baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
What a lapsed clock costs
The cycle shuts when the missed recurring deadline is a regression case. That suite is what the next obligation review is measured against.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Correction rate rises on event-driven six-month clocks.
- 02
Diagnose
The three-year audit that was four years old because the owner had left is worked backwards until one cause is left standing.
- 03
Improve
Number the change; the obligations that drove it are filed beneath it.
- 04
Verify
Nothing ships while one obligation case remains red.
- 05
Learn
The case is kept, and the calendar rules are amended in that same commit.
Learn → Detect
The return edge. The next obligation review runs against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, obligation tracking, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Obligation-register and automation-boundary work.Week 1
- 02Regulatory, permit and internal sources.Week 1, Week 2
- 03Rule-to-obligation and clock-derivation mapping.Week 1, Week 2
- 04Obligation and evidence ingestion.Week 2
- 05Clock, evidence and owner binding.Week 2, Week 3
- 06Completeness scoring and review routing.Week 3
- 07Owner certification workflow.Week 3, Week 4
- 08EHS-system integration.Week 5
- 09Obligation and evidence cases.Week 4, Week 5
- 10Guardrails and attestation controls.Week 4
- 11Obligation-trail instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne register, one site | ProductionProduction compliance workflow | AdvancedMultiple sites / regimes |
|---|---|---|---|
| Introduced at Pilot | |||
| Obligation tracking to your register | ✓ | ✓ | ✓ |
| Named owner certification | ✓ | ✓ | ✓ |
| Obligation-register baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by obligation | — | ✓ | ✓ |
| Owner review workflow in your systems | — | ✓ | ✓ |
| Approved write-back | — | ✓ | ✓ |
| Obligation-source integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multi-regime obligation sets | — | — | ✓ |
| Cross-site evidence packs | — | — | ✓ |
| Large obligation registers | — | — | ✓ |
| Multi-regime calendar controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, register size, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your live obligations and the rule each one comes from
→Obligation capture and clock derivation
Week 102Representative audits, revalidations and change records
→Evidence binding, clock logic and the register baseline
Week 203Your compliance calendar and the owners it names
→Obligation mapping, clock derivation and the automation boundary
Week 104Access to relevant APIs, feeds or exports
→Regulatory, permit and record-store assessment, then integration setup
Week 205Registers you would not want inspected
→Deadline cases and failure-mode testing
Week 406What no obligation register may certify
→Completeness scoring, review routing, guardrails and release controls
Week 307A named owner or operator who certifies
→Release to the named owner, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Each band is as wide as its phase costs, so week five carries a pair rather than an empty column.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Obligation discovery, clock derivation and the automation boundary
W2Source integration and the obligation-register baseline
W3Evidence binding, completeness logic and release controls
W4Evaluation suite, deadline cases and failure-mode testing
W5EHS-system integration, pilot obligations and targeted corrections
W6One audit cycle run under the accountable owner, then Agent Care handover
- Reading the band
- Each bar covers only the weeks its own work is named for, and week five is shared by design.
- At the end of W6
- When the evidence record validates, Agent Care assumes the agent.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Operations AI agent
Build a compliance obligation agent around the clocks that recur without anybody starting them.
Show us one recurring obligation and the evidence filed against it since it last came round. The owner or operator signs, on knowledge, information, and belief formed after reasonable inquiry, and the agent keeps the register that inquiry is run against.
- Typical delivery
- 4–6 weeks
- Deployment
- Your obligations
- Owner certifies
- Evidence filed
- After launch
- Agent Care available
Nestack Agents · Obligation tracking
AGT-OP-05 · Agent Care available after launch
