Public relations AI agent · Crisis communication
Crisis Communication Copilot AI Agent
Say only what the evidence carries: draft the holding line, log the hour it went out and to whom, and leave the assurance itself to the named officer who signs it.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Named officer
- Evidence first
- After launch
- Agent Care
What this agent does
Drafts the assurance, never gives it
In
- 01
A holding line is drafted, and what the evidence carries stays apart from what it promises.
- 02
An hour is stamped on the draft, because 16 CFR 1115.14(e) reads immediately as twenty-four hours.
Reason
- 03
A negative about scope is asked for, and the draft returns the reads, not the absence.
- 04
A supervisory authority is notified, and Article 33(5) makes that record the one read back.
- 05
A media notice is drafted, and 45 CFR 164.406(c) fixes the elements it has to carry.
Decide
- 06
A later fact contradicts an assurance, and it routes to the officer whose name went under it.
- 07
A correction is issued, written as a new line with its own hour, and the old line stands.
Out
- 08
One event is tailored four ways, and the four drafts are held side by side before one goes.
- 09
Execute write actions only inside the approval boundaries agreed during implementation.
Product statement
Drafting, timing and the record belong to the agent. The assurance, and the signature under it, belong to a named officer who answers for it years afterwards.
Example workflow
One assurance, event to issue
- 1Event notifiedA field report, an authority query, a customer complaint or a line from the incident record
- 2Facts assembled and datedWhat the evidence carries, the source of each line, the hour it arrived and what is still open
- 3Holding line draftedThe draft, its sources, what it does not assert and confidence
- 4Controls appliedSource checks, negative-assertion checks, clock checks and drafting confidence
No human action required
Stages 1 to 4 run unaided, and nothing is published at any of them — the agent is drafting, and the officer lane opens at the issue gate.
Goes to the named officer to issue.
Adds a crisis-lead read first.
Officer review
The draft is held with its sources, what it does not assert and the clock it sits under.
Issue · Amend · Send to crisis-lead review
Issued — by the named officer
- 6Notification and timeline records updatedOnly where write access and disclosure policy allow it
- 7Outcome evaluatedAssurance accuracy, retracted lines, officer corrections and what the later review turned up
Corrections
Each correction the officer makes counts in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Making the materiality determination that starts a clock.
- Signing a section 15(b) report to the Commission.
- Promising that no payment data was reached.
- Deciding a public notice is equally effective.
Automation boundary
Agent acts unaided
- ✓Draft the holding line from evidence on record.
- ✓Keep the assurance and the evidence apart in one dated record.
- ✓Mark what a draft does not assert, beside the facts it does carry.
- ✓Hold each draft for the officer who issues it.
Nothing is published except by a named officer, inside the agreed boundaries.
- Judging whether a risk to rights is high.
- Telling the public that the facts are settled.
- Choosing the hour a statutory clock is dated from.
- Changes to the holding rules or the issue gate.
Example output
One holding line, annotated
An engineering agent keeps the technical incident record; this one keeps what was said outward while the facts were still moving. Below is one draft exactly as the agent leaves it.
Draft output · single event
Illustrative example- Event
- Field reports, one product lot
- Recorded as
- Reports of one failure mode, unverified
- Asserted
- Draft only
- Evidence of record
- Field report, 3 August 2026
- Confidence
- Held unissued
- Held for
- The named officer, by name
As received
Drawn from the field reports and the notification log, and it asserts nothing those two do not carry.
What the record holds
- Field report lines
- Notification log
- Approval trail
Why no issue here
Giving the public an assurance is an act a named officer alone owns.
What the score decides
Below the configured threshold a draft gets a crisis-lead read before the officer sees it.
Action
IssueAmendSend to crisis-lead reviewValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Each assurance
From the evidence that carries it
Where the assurance is used
Routing a draft through counsel did not protect it in the rulings consulted: facts owed under a statutory duty stayed discoverable, and a lawyer name entered the record beside them.
Said before it was known
The clocks in force start at a judgement — materiality, high risk, significance — and the agent is quickest at the step that comes after one is made.
What was checked, and not found
No rule consulted prescribes the words a holding line must use while the facts are still moving. CIRCIA is the clock quoted most often here and it binds nobody, its final rule unpublished; BOD 22-01 stands revoked; and the AI Act incident article binds providers of high-risk systems, now deferred.
Build an evidence trail
The holding line, the hour it was issued and the officer who approved it stay together.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Notification and disclosure
- SEC EDGAR
- CPSC
- DFS portals
- Statutory notification channels
Evidence and case records
- Complaint logs
- field reports
- Serious-injury intake logs
Statement and distribution
- Newsroom
- wire services
- portals
- Customer email and public notices
Agent
Crisis communication and notice
- Reads the evidence
- Drafts the line
- Holds the issue
Timeline and approvals
- Legal hold
- matter management
- Approval trails and issued versions
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six valves between the model and the wire
Six valves on one main, the last the smallest. What flows is set out in the map below.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether a line may go out
- L3
- Leaves the assurance to a named officer
- L4 – L5
- Keep the statement and the timeline behind it
- L6
- Issues nothing beyond acknowledgement when signals degrade
How Nestack evaluates it
Evaluate the whole drafting run — not only the line that goes out.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the assurance the public reads
- E1Final-output evaluationDid the draft stay inside what its sources actually carried?
- E2Step-level evaluationDid the agent read the right reports, the right hours and the live holding rules?
- E3Tool evaluationDid it read and write the correct event and the correct notification record?
- E4Confidence calibrationDo low-confidence holding lines actually attract more corrections?
- E5Slice evaluationHow does performance change from one event class to another?
- E6Business outcomeHow many drafts needed a correction before the officer issued one?
Floor — the record read back under oath
Failure modes
Where each failure originates in the agent
Seven failure modes, each shown at the point it first surfaces.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- TJ-03
Raw sources bypassed for the summary
The synthesised timeline is read as the record.
Stage gathers
The reports, the hours, the notices and the log
02 · Reasoning
2 modes
- TJ-04
Negative drafted from absence
Nothing seen is written as nothing reached.
- TJ-06
Materiality settled inside a summary
A hedged position is drafted as a conclusion.
Stage proposes
The draft, its sources and what is still open
03 · Tool / write
2 modes
- TJ-02
Four audiences, four scopes
One event is described four different ways.
- TJ-05
Issued ahead of the consultation
A warning goes out before the regulator read.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- TJ-01
Issued, the clearance unlogged
The record shows a line out, not who cleared it.
Stage returns
The line the public reads and a regulator files
05 · Change / Version
1 mode
- TJ-07
The correction that does not land
A figure is revised while the first one stands.
Stage tracks
Model, prompt, holding rules and issue gates
- Sev-1 · an assurance nothing carried
- Sev-2 · a wrong line reaches the public
- Sev-3 · sources thin, draft held back
Affected slices
Consumer-safety notices absorb the corrections
A class-level assurance figure can read clean while consumer-safety notifications carry most of the officer corrections. Nestack reports the correction rate by event class, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Consumer-safety notifications | 11.9% | 3.7× | Review | |
| Cross-border regulator notices | 8.4% | 2.6× | Review | |
| First-hour holding lines | 5.3% | 1.6× | Watch | |
| Routine acknowledgement lines | 2.4% | 0.7× | Normal |
Bar: correction-rate lift vs. routine-acknowledgement baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
What an early assurance costs
A cycle shuts when the assurance the facts later contradicted is a standing case. That suite is what the next incident run is measured against.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Correction rate rises on consumer-safety notices.
- 02
Diagnose
The sentence issued in the first hours that told the public what had not yet been established is worked backwards until one cause is left standing.
- 03
Improve
Statements ship numbered, and the timeline behind them travels attached.
- 04
Verify
Each touched assurance case is run again, and one red holds it back.
- 05
Learn
The case is kept, and the escalation rules are amended in that same commit.
Learn → Detect
The return edge. The next event meets a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, drafting workflow, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Crisis-communication and automation-boundary scope.Week 1
- 02Evidence, notice and approval sources.Week 1, Week 2
- 03Statutory-notification and officer-signature mapping.Week 1, Week 2
- 04Evidence and notice intake.Week 2
- 05Fact binding and draft logic.Week 2, Week 3
- 06Confidence scoring and crisis-lead routing.Week 3
- 07Officer issue workflow.Week 3, Week 4
- 08Notification-system integration.Week 5
- 09Assurance and timing cases.Week 4, Week 5
- 10Guardrails and escalation controls.Week 4
- 11Timeline instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne event class, one cycle | ProductionProduction crisis-comms workflow | AdvancedMultiple regulators / jurisdictions |
|---|---|---|---|
| Introduced at Pilot | |||
| Drafting to your holding rules | ✓ | ✓ | ✓ |
| Named officer issue | ✓ | ✓ | ✓ |
| Notification-clock baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by incident class | — | ✓ | ✓ |
| Crisis-lead review workflow in your systems | — | ✓ | ✓ |
| Approved timeline write-back | — | ✓ | ✓ |
| Rota-and-registry integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multi-regime holding rules | — | — | ✓ |
| Cross-jurisdiction notice packs | — | — | ✓ |
| High event volume | — | — | ✓ |
| Multi-regulator notification controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, notification volume, escalation controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your live event classes and the notice each one triggers
→Holding-rule capture and clock versioning
Week 102Representative events, evidence sets and past statements
→Source binding, drafting logic and the notification baseline
Week 203Your escalation rota and the officers it names
→Holding-rule mapping, clock binding and the automation boundary
Week 104Access to relevant APIs, feeds or exports
→Evidence, notification and approval source assessment, then integration setup
Week 205Assurances you would not want replayed
→Timing cases and the evaluation round
Week 406What no holding line may promise
→Confidence scoring, review routing, guardrails and issue controls
Week 307A named officer who issues the statement
→Handover to the named officer, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
A band here is as wide as its phase costs, so the fifth week shows a pair instead of a neat blank.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Holding-rule discovery, clock versioning and the automation boundary
W2Evidence and notification integration and the timeline baseline
W3Fact binding, drafting logic and issue controls
W4Evaluation suite, timing cases and failure-mode testing
W5Notification-system integration, pilot events and targeted corrections
W6One exercise cycle run under the crisis lead, then Agent Care handover
- Reading the band
- Each band spans only the weeks its own work is named for, and the fifth carries two.
- At the end of W6
- Once the timeline record validates, Agent Care adopts the agent.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Public relations AI agent
Build a crisis communication copilot around the sentence your last event published too early.
Show us one event and the first line you put out about it. Not how quickly you responded. What you promised while the facts were still moving, the hour you promised it, and whose name went under it. An assurance the evidence did not carry comes back as a case.
- Typical delivery
- 4–6 weeks
- Deployment
- Your holding lines
- Named officer
- Evidence first
- After launch
- Agent Care available
Nestack Agents · Crisis communication
AGT-COM-04 · Agent Care available after launch
