Public relations AI agent · Internal communications
Internal Communications AI Agent
Send in the lawful order: draft the announcement, record which group was told and on what date, and leave the release to the named signatory whose letter goes to the Commissioner.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Named signatory
- Sequence first
- After launch
- Agent Care
What this agent does
Drafts the notice, never sends it
In
- 01
An announcement is drafted, and the group it would reach is written down beside it.
- 02
A date is set on the draft, because 12 NYCRR 921-2.1 reads notice as ninety calendar days.
Reason
- 03
A federal notice falls due, and 29 U.S.C. 2102(a) puts sixty days ahead of the closing.
- 04
A works council is owed a hearing, and § 111 BetrVG places it ahead of the send.
- 05
An opinion is owed before adoption, and Directive (EU) 2025/2450 adds a written response.
Decide
- 06
A public authority is notified, and Article 4 of Directive 98/59/EC adds thirty days.
- 07
A read receipt is switched on, and BAG 1 ABR 16/23 makes that a co-determined device.
Out
- 08
A concern channel is described, and Article 9 of Directive (EU) 2019/1937 sets its clocks.
- 09
Execute write actions only inside the approval boundaries agreed during implementation.
Product statement
Drafting, sequencing and the record belong to the agent. The release, and the signature on the letter that goes to a public official, belong to a named signatory.
Example workflow
One announcement, decision to release
- 1Decision recordedA board commitment, a restructuring plan, a site order or a line from the works council file
- 2Audience and dates assembledWhich groups the measure touches, which bodies are owed consultation in good time under Article 2, and what is still open
- 3Announcement draftedThe draft, the groups named on it, the order it sits in and confidence
- 4Controls appliedSequence checks, consultation checks, register checks and drafting confidence
No human action required
Stages 1 to 4 run unaided, and nothing is sent at any of them — the agent is drafting, and the signatory lane opens at the release gate.
Goes to the named signatory to release.
Adds an employment-counsel read first.
Signatory review
The draft is held with its audience list, the bodies owed notice and the date it sits under.
Release · Amend · Send to counsel review
Released — by the named signatory
- 6Notice and consultation records updatedOnly where write access and records policy allow it
- 7Outcome evaluatedSequence accuracy, groups missed, signatory corrections and what the later review turned up
Corrections
Each correction the signatory makes counts in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Signing the letter to the Commissioner.
- Deciding when a consultation has closed.
- Fixing the date an order takes effect.
- Composing sentences a named leader will own.
Automation boundary
Agent acts unaided
- ✓Draft the announcement from the decision record.
- ✓Record which group is told, on what date, and by which channel.
- ✓Hold the send where a consultation body has not yet been heard.
- ✓Keep each draft for the signatory who releases it.
Nothing is sent except by a named signatory, inside the agreed boundaries.
- Judging whether a measure is transnational.
- Deciding which staff a notice must reach.
- Choosing which works council is competent.
- Changes to the sequencing rules or the gate.
Example output
One announcement, annotated
Severance design and manager support sit with human resources; this page holds the notice, the order it goes out in and the register under it. Below is one draft exactly as the agent leaves it.
Draft output · single announcement
Illustrative example- Measure
- Site closure, one New York site
- Recorded as
- Consultation open, opinion not yet given
- Audience
- Draft only
- Evidence of record
- Workforce register, 3 August 2026
- Confidence
- Held unsent
- Held for
- The named signatory, by name
As received
Assembled from the register, payroll, timekeeping and the plan, and it names no group those four do not.
What the record holds
- Workforce register
- Consultation file
- Notice filing trail
Why no release here
Releasing a notice to the staff is an act a named signatory owns.
What the score decides
Below the configured threshold a draft gets a counsel read before the signatory sees it.
Action
ReleaseAmendSend to counsel reviewValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Each announcement
From the decision that dates it
Where the announcement is used
Federal notice under 20 CFR 639.7 names a company official and takes no signature; 12 NYCRR 921-2.2 wants a natural person to sign, for the same layoff.
Told before it was allowed
The clocks run from an event nobody in the drafting seat witnesses, and a tool still reading Directive 2009/38/EC as unamended has missed Directive (EU) 2025/2450 of 26 November 2025, transposed by 1 January 2028. Standing policy text is reached separately, by 17 CFR 240.21F-17(a).
What was checked, and not found
No rule consulted prescribes the words an internal announcement must use, and a staff-wide briefing is not by itself a Regulation FD event, because employees sit outside the covered recipients listed at 17 CFR 243.100(b)(1). The Board standard for facially neutral workplace rules is unsettled.
Build an evidence trail
The announcement, the group it reached and the officer who signed it stay together.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Workforce and payroll
- HRIS
- payroll
- timekeeping
- Site, wage and separation records
Consultation records
- Works council
- EWC registers
- Opinion and response trails
Distribution and intranet
- intranet
- digital signage
- Audience groups and send records
Agent
Internal announcement and notice
- Reads the register
- Drafts the notice
- Holds the send
Filings and approvals
- State portals
- legal hold
- Signed notices and dated approval trails
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six latches between the model and the send
Six catches on one latch, the last the surest. What releases is drawn in the map below.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether a send may go
- L3
- Leaves the release to a named signatory
- L4 – L5
- Keep the announcement and the consultation behind it
- L6
- Holds the send when signals degrade
How Nestack evaluates it
Evaluate the whole sequence — not only the message that goes out.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the announcement staff open
- E1Final-output evaluationDid the draft name the groups the measure actually touched?
- E2Step-level evaluationDid the agent read the live register, the right dates and the consultation file?
- E3Tool evaluationDid it read and write the correct measure and the correct notice record?
- E4Confidence calibrationDo low-confidence sends actually attract more signatory corrections?
- E5Slice evaluationHow does performance change from one audience class to another?
- E6Business outcomeHow many drafts needed a correction before the signatory released one?
Floor — the record filed with the state
Failure modes
Where each failure originates in the agent
Seven failure modes, each named at the point in the run it first shows.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- UJ-03
Stale group list read
The list read is not the one the org now has.
Stage gathers
The groups, the dates, the sites and the bodies
02 · Reasoning
2 modes
- UJ-04
Clock run from the draft date
A send date is counted from the briefing, not the order.
- UJ-06
Consultation treated as closed
An opinion still owed is worked as given.
Stage proposes
The draft, its audience and the bodies owed notice
03 · Tool / write
2 modes
- UJ-02
Notice put to the wrong body
The local council is told where the group one sits.
- UJ-05
Staff send placed ahead of a filing
A staff briefing runs before the filing it triggers.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- UJ-01
Published wording narrows a channel
A policy line tells staff whom they may tell.
Stage returns
The notice staff open and a state office files
05 · Change / Version
1 mode
- UJ-07
Read receipts on by default
Open tracking arrives with an upgrade nobody bargained.
Stage tracks
Model, prompt, send rules and group lists
- Sev-1 · a send ahead of consultation
- Sev-2 · a notice misses an affected site
- Sev-3 · register thin, send held back
Affected slices
Statutory notices absorb the corrections
A class-level sequence figure can read clean while statutory redundancy notices carry most of the signatory corrections. Nestack reports the correction rate by audience class, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Statutory redundancy notices | 7.4% | 3.7× | Review | |
| Works council and EWC sends | 5.2% | 2.6× | Review | |
| Cross-border policy rollouts | 3.2% | 1.6× | Watch | |
| Routine intranet updates | 1.7% | 0.8× | Normal |
Bar: correction-rate lift vs. routine-update baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
What an early send costs
A loop closes when a group told before consultation opened is a standing case. That suite is what the next announcement is measured against.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Correction rate rises on statutory redundancy notices.
- 02
Diagnose
The group that heard about the site order before the council did is worked backwards until one cause is left standing.
- 03
Improve
Number the announcement; the approvals that cleared it are filed beneath it.
- 04
Verify
A single unconsulted group case stops the whole send.
- 05
Learn
One case joins the suite, one line joins the sequencing rules.
Learn → Detect
The return edge. The next announcement meets a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope set beside the delivery timeline. The week structure follows the six-week plan — discovery, registers, sequencing workflow, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Internal-communications and automation-boundary scope.Week 1
- 02Register, consultation and notice sources.Week 1, Week 2
- 03Consultation-sequencing and named-signatory mapping.Week 1, Week 2
- 04Register and notice intake.Week 2
- 05Audience binding and draft logic.Week 2, Week 3
- 06Confidence scoring and counsel routing.Week 3
- 07Signatory release workflow.Week 3, Week 4
- 08Directory-system integration.Week 5
- 09Sequencing and consultation cases.Week 4, Week 5
- 10Guardrails and distribution controls.Week 4
- 11Distribution-trail instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne audience class, one cycle | ProductionProduction internal-comms workflow | AdvancedMultiple jurisdictions / sites |
|---|---|---|---|
| Introduced at Pilot | |||
| Drafting to your sequencing rules | ✓ | ✓ | ✓ |
| Named signatory release | ✓ | ✓ | ✓ |
| Workforce-register baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by audience class | — | ✓ | ✓ |
| Counsel review workflow in your systems | — | ✓ | ✓ |
| Approved register write-back | — | ✓ | ✓ |
| Directory-and-intranet integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multi-regime sequencing rules | — | — | ✓ |
| Cross-border notice packs | — | — | ✓ |
| Large workforce registers | — | — | ✓ |
| Multi-jurisdiction sequencing controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, register volume, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your live audience classes and the notice each one owes
→Sequencing-rule capture and clock versioning
Week 102Representative announcements, registers and consultation files
→Source binding, sequencing logic and the register baseline
Week 203Your approval chain and the signatories it names
→Sequencing-rule mapping, clock binding and the automation boundary
Week 104Access to relevant APIs, feeds or exports
→Register, consultation and directory source assessment, then integration setup
Week 205Notices you would not want timestamped
→Consultation cases and the failure round
Week 406What no announcement may pre-empt
→Confidence scoring, review routing, guardrails and release controls
Week 307A named signatory who releases the notice
→Handover to the named signatory, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Two of these phases share week five in fact, and no band was widened to make the column read neatly.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Sequencing-rule discovery, clock versioning and the automation boundary
W2Register and consultation integration and the workforce baseline
W3Audience binding, drafting logic and release controls
W4Evaluation suite, sequencing cases and failure-mode testing
W5Directory-system integration, pilot sends and targeted corrections
W6One announcement cycle run under the internal-comms lead, then Agent Care handover
- Reading the band
- A bar covers only the weeks its own work is named for, and week five carries a pair.
- At the end of W6
- When the approval record validates, Agent Care adopts the agent.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Public relations AI agent
Build an internal comms agent around the announcement your last restructuring sent in the wrong order.
Show us one restructuring and the order its messages went out in. Not how well they read. Which group was told first, which body had not yet been consulted, and whose name went on the letter to the Commissioner. A send made out of order comes back as a case.
- Typical delivery
- 4–6 weeks
- Deployment
- Your announcements
- Named signatory
- Sequence first
- After launch
- Agent Care available
Nestack Agents · Internal communications
AGT-COM-11 · Agent Care available after launch
