Quality AI agent · Requirements trace
Requirements Trace AI Agent
Draw the candidate links, keep the evidence and the doubt beside each one, and hand the matrix — not a coverage claim — to the reviewer whose name goes on the submission.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Named reviewer
- Links first
- After launch
- Agent Care
What this agent does
Proposes the link, never certifies it
In
- 01
A link is proposed, and the signal that suggested it is recorded beside the link itself.
- 02
A link is not a proof: the matrix records a relation, never the argument that it holds.
Reason
- 03
Best published trace recovery holds up two links in five, on a set of twenty-two requirements.
- 04
A review of seventy-nine studies found no compelling evidence that recovered links are useful.
- 05
Design control runs 820.10(c) to ISO 13485 clause 7.3; 820.30 was reserved on 2 February 2026.
Decide
- 06
Traceability sits at clause 7.3.2, and the design history file is now clause 7.3.10.
- 07
Under 807.87(l) a responsible person of the firm, not a consultant, signs within fifteen days.
Out
- 08
No rule found requires the matrix as a document, and that absence is recorded, not filled.
- 09
Execute write actions only inside the approval boundaries agreed during implementation.
Product statement
Drafting, linking and holding belong to the agent. Coverage belongs to a named reviewer, who accepts the link and answers for the file at inspection.
Example workflow
One link, proposal to acceptance
- 1Requirement set extractedDesign inputs, software requirements, hazards, test cases and the change history behind them
- 2Baseline fixed and datedThe requirement identifiers, their versions, the artefacts in scope and the day the baseline was taken
- 3Candidate links proposedThe requirement, the artefact that may cover it, the signal that suggested the link and the confidence
- 4Controls appliedBaseline checks, direction checks, orphan checks and link confidence
No human action required
Stages 1 to 4 run unaided, and no requirement is called covered at any of them — the agent is proposing, and the reviewer lane opens at the acceptance gate.
Goes to the named reviewer to accept.
Adds a design-assurance read first.
Design-assurance review
The link is held with its evidence, its direction and the requirement the agent could not place.
Accept · Reject link · Send to design-assurance review
Accepted — by the named reviewer
- 6Design file and matrix records updatedOnly where write access and records policy allow it
- 7Outcome evaluatedAcceptance outcomes, orphan age, reviewer rejections and what a CP 7382.850 sample asked to see
Corrections
Each link the reviewer rejects counts in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Concluding that a requirement is covered.
- Signing the truthful and accurate statement.
- Closing an orphan requirement.
- Accepting a link into the design file.
Automation boundary
Agent acts unaided
- ✓Propose a candidate link and cite its evidence.
- ✓Record each candidate link with the traceability signal under it.
- ✓Hold each unplaced requirement for a named reviewer.
- ✓Flag each requirement the latest change left without verification.
No requirement is called covered except by a named reviewer, inside the agreed boundaries.
- Judging whether a test verifies a requirement.
- Telling a notified body the file is complete.
- Choosing which artefacts a baseline covers.
- Changes to the linking rules or the review gate.
Example output
One proposed link, annotated
This serves the design-assurance lead who must show an unbroken chain years after transfer, and Koven Technologies drew one of the first warning letters written in the post-QMSR style; below is one proposed link exactly as the agent leaves it.
Proposed link · single requirement
Illustrative example- Link
- Design input to system test
- Recorded as
- Proposed, not accepted
- Direction
- Both directions
- Evidence of record
- Design file, 14 August 2026
- Confidence
- Held unaccepted
- Held for
- The named reviewer, by name
As received
Drawn from the requirement text, the test record and the change history, and it shows resemblance only.
What the record holds
- Requirement text
- Test record
- Change history
Why no coverage here
Calling a requirement covered is a judgement a named reviewer makes.
What the score decides
Below the configured threshold a link gets a design-assurance read before the reviewer.
Action
Accept linkReject linkSend to design-assurance reviewValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Each proposed link
From the requirement it claims to cover
Where the link is read
MDR Article 15(3)(b) makes the technical documentation a named person's continuing duty, and FAA Order 8110.49A walks an inspector from system requirement to test result.
A link is not a proof
An agent can assert that a test covers a requirement; it cannot know whether the test exercises the conditions that requirement sets, and NPR 7150.2D asks for the chain in both directions.
What was checked, and not found
No rule located requires a traceability matrix as a document; FDA asks for the property, not the spreadsheet. Its design-control guidance of March 1997 is still listed Final while construing a section reserved on 2 February 2026, the same day QSIT was withdrawn.
Build an evidence trail
The requirement, the test that claims it and the reviewer who accepted the link stay together.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Requirements and design inputs
- ALM suites
- requirement stores
- Requirement text and versions
Tests and verification records
- Test management
- CI results
- Test cases and their results
Risk and hazard files
- Risk register
- hazard assessments
- Hazards and risk control measures
Agent
Requirements tracing and review
- Reads the requirements
- Proposes the links
- Holds the matrix
Design and change records
- Change control
- design file feeds
- Change orders and design outputs
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six meshes between the link and the file
Six meshes stacked in one frame, the last the closest. What holds is drawn in the map below.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether a link may be accepted
- L3
- Leaves the acceptance to a named reviewer
- L4 – L5
- Keep the link and the requirement behind it
- L6
- Marks the link unverified when signals degrade
How Nestack evaluates it
Evaluate the whole tracing run — not only the matrix that comes out.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the matrix an inspector opens
- E1Final-output evaluationDid the link stay inside what its cited evidence actually shows?
- E2Step-level evaluationDid the agent read the right baseline, the right artefacts and the live linking rules?
- E3Tool evaluationDid it read the correct requirement and write the correct link record?
- E4Confidence calibrationDo low-confidence links actually attract more reviewer rejections?
- E5Slice evaluationHow does performance change across requirement classes and link directions?
- E6Business outcomeHow many links needed a second read before the reviewer accepted one?
Floor — the file read back under CP 7382.850
Failure modes
Where each failure originates in the agent
Seven failure modes, each placed where the break first becomes visible.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- VH-03
Live view read as the record
The tool is read, not the controlled file.
Stage gathers
The inputs, the tests, the code and the hazards
02 · Reasoning
2 modes
- VH-04
Link asserted on wording alone
Resemblance is filed as coverage.
- VH-06
Orphan closed by nearest match
A real gap disappears into a link.
Stage proposes
The link, the signal, the direction and the doubt
03 · Tool / write
2 modes
- VH-02
Reverse direction never drawn
Forward links read green; nothing checks back.
- VH-05
Derived requirement given a parent
The escalation that was owed never happens.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- VH-01
Signed over links nobody read
A name goes under a file too large to read.
Stage returns
The matrix a reviewer opens and then signs
05 · Change / Version
1 mode
- VH-07
A change leaves the links behind
The wording moves; the links stay valid and dead.
Stage tracks
Model, prompt, link rules and design changes
- Sev-1 · a link certified but never read
- Sev-2 · an orphan closed by resemblance
- Sev-3 · link unverified, matrix held back
Affected slices
Changed requirements absorb the rejections
A programme coverage figure can read clean while requirements that changed late carry most of the reviewer rejections. Nestack reports the rejection rate by requirement class, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Changed safety requirements | 10.4% | 3.7× | Review | |
| Clinically worded requirements | 7.4% | 2.6× | Review | |
| Derived low-level requirements | 4.6% | 1.6× | Watch | |
| Stable functional requirements | 2.1% | 0.7× | Normal |
Bar: rejection-rate lift vs. stable-requirement baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
What a broken link costs
A loop closes when the requirement covered on paper alone is a standing case. That suite is what the next matrix drawn is measured against.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Rejection rate rises on requirements that changed late.
- 02
Diagnose
The indications quietly widened to take in a fetal application, cited at Koven Technologies in warning letter 734643 under clause 7.3.9, are worked backwards until one cause is left standing.
- 03
Improve
Number the matrix; the links that fill it are filed beneath it.
- 04
Verify
A single orphan requirement case stops the whole matrix issuing.
- 05
Learn
One case joins the suite, and one line joins the linking rules.
Learn → Detect
The return edge. The next matrix is drawn against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, linking logic, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Trace scope and the automation-boundary definition.Week 1
- 02Requirement, test and risk sources.Week 1, Week 2
- 03Requirement-to-test and reverse-direction coverage.Week 1, Week 2
- 04Requirement extraction.Week 2
- 05Baseline and artefact binding.Week 2, Week 3
- 06Link confidence and review routing.Week 3
- 07Reviewer acceptance workflow.Week 3, Week 4
- 08Design-file integration.Week 5
- 09Coverage and orphan cases.Week 4, Week 5
- 10Guardrails and linking controls.Week 4
- 11Link-trail instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne requirement set, one cycle | ProductionProduction review workflow | AdvancedMultiple programmes / standards |
|---|---|---|---|
| Introduced at Pilot | |||
| Linking to your requirement classes | ✓ | ✓ | ✓ |
| Named reviewer acceptance | ✓ | ✓ | ✓ |
| Requirement-inventory baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by requirement class | — | ✓ | ✓ |
| Reviewer review workflow in your systems | — | ✓ | ✓ |
| Approved design-file write-back | — | ✓ | ✓ |
| Toolchain-and-repository integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multi-standard linking rules | — | — | ✓ |
| Cross-programme trace packs | — | — | ✓ |
| Large requirement sets | — | — | ✓ |
| Multi-standard coverage controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, requirement volume, acceptance controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your live requirement sets and the standard each is held to
→Baseline capture and link versioning
Week 102Representative requirements, tests and past review decisions
→Artefact binding, linking logic and the requirement-inventory baseline
Week 203Your review path and the design-assurance lead it names
→Baseline mapping, artefact binding and the automation boundary
Week 104Access to relevant APIs, feeds or exports
→Requirement, test and risk source assessment, then integration setup
Week 205Matrices you would not want inspected
→Coverage cases and the failure round
Week 406What no link may demonstrate
→Link confidence, review routing, guardrails and release controls
Week 307A named reviewer who accepts the link
→Handover to the named reviewer, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
These bands are counted and not evened out; the fifth week holds two because the two genuinely overlap.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Baseline discovery, link versioning and the automation boundary
W2Requirement, test and risk integration and the inventory baseline
W3Artefact binding, linking logic and release controls
W4Evaluation suite, coverage cases and failure-mode testing
W5Design-file integration, pilot matrices and targeted corrections
W6One design cycle run under the design-assurance lead, then Agent Care handover
- Reading the band
- Each bar covers the weeks its own work is named for, and week five carries the overlap.
- At the end of W6
- Once the link record validates, Agent Care adopts the agent.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Quality AI agent
Build a requirements trace agent around the link your last submission never proved.
Show us one requirement and the test your matrix says covers it. Not how fast the links were drawn. Which baseline they were drawn against, what the link establishes and what it does not, and whose name goes under the submission. A link nobody proved comes back as a finding.
- Typical delivery
- 4–6 weeks
- Deployment
- Your requirement sets
- Named reviewer
- Links first
- After launch
- Agent Care available
Nestack Agents · Requirements trace
AGT-QA-03 · Agent Care available after launch
