Strategy AI agent · Board materials
Board Material Preparation AI Agent
Escort each figure back to the system it came from and the day it was drawn, bind every paper to a version, and hold the pack for the Corporate Secretary.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Bylaws, not law
- Version-bound
- After launch
- Agent Care
What this agent does
Assembles the pack, never the record
In
- 01
A paper is drafted, and 8 Del. C. § 142(a) asks only that an officer record the proceedings.
- 02
A meeting approaches, and the circulation deadline is the one your bylaws set, not one a statute sets.
Reason
- 03
A figure lands in a paper, and it travels with the system it came from and the day it was drawn.
- 04
A consent is signed, and § 141(f) files it with the minutes, in the form the minutes are kept.
- 05
A pack is versioned, and a director reading a superseded paper is worse off than one reading none.
Decide
- 06
A demand arrives, and SB 21, signed 25 March 2025, narrowed § 220 to a closed enumerated list.
- 07
A minute is recorded, and nothing in the statute asks that it be approved, signed or attested.
Out
- 08
A committee meets, and its papers go to its own members, not to a general distribution list.
- 09
Execute write actions only inside the approval boundaries agreed during implementation.
Product statement
The agent assembles, chases, versions and traces. The Corporate Secretary circulates and records, and the discipline that governs both is self-imposed rather than statutory.
Example workflow
One board paper, source to circulation
- 1Draft papers receivedFunction drafts, management reports, ledger extracts or committee submissions
- 2Paper context assembledThe meeting, the committee that owns it, the agenda item it answers and the deadline your bylaws fixed
- 3Figure sources draftedThe figure, the system beneath it, the gaps and completeness
- 4Controls appliedMembership checks, version checks, draw-date checks and completeness confidence
No human action required
Stages 1 to 4 run unaided, and nothing leaves the room at any of them — the agent is only assembling, and the secretariat enters at the completeness gate.
Passes to the Corporate Secretary to circulate.
Adds a secretariat read first.
Secretariat review
The pack is held with its papers, its gaps and the systems they name.
Circulate · Append source · Send to secretariat review
Circulated — by the Corporate Secretary
- 6Agenda and pack records updatedOnly where write access and records policy allow it
- 7Outcome evaluatedSource completeness, deadline coverage, secretariat corrections and what review found
Corrections
Each secretariat correction is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Approving the minutes of a board or committee meeting.
- Attesting a resolution for a closing certificate.
- Drafting a resolution or the minutes of a meeting.
- Deciding what a paper may claim about a figure.
Automation boundary
Agent acts unaided
- ✓Carry each figure with the source system it names.
- ✓Track the circulation deadline the bylaws set for each committee.
- ✓Bind every paper to a version and show what moved between them.
- ✓Chase the late paper and mark the hour it arrived.
Nothing is circulated or recorded except by the Corporate Secretary, and only on approval.
- Judging whether a figure in a paper is right.
- Telling a director that a paper is final.
- Setting who sits on a given committee.
- Changes to the minute book or the resolution text.
Example output
One board paper, annotated
Our shipped marketing campaign-analytics agent and any finance reporting agent produce the numbers upstream; this one records where each figure came from rather than producing it.
Board paper · single figure
Illustrative example- Figure
- Quarterly revenue, Audit Committee
- Recorded as
- Drawn from the reporting system it names
- Paper
- Revenue summary
- Source of record
- Finance ledger, drawn 3 August 2026
- Confidence
- Held uncirculated
- Held for
- The Corporate Secretary, by name
As received
Taken from the reporting system and the paper that carried it — it reaches only as far as both do.
What the record holds
- Reporting system
- Draw date
- Paper version
Why nothing is attested here
Whether a figure is right is a judgement the paper owner makes.
What the score decides
Below the configured threshold a paper picks up a secretariat read before it is circulated.
Action
CirculateAppend sourceSend to secretariat reviewValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every figure
From the system that made it
Where the source is used
A board pack is not a legal record: this page shows what each paper rests on and what arrived late, and it makes no call on whether a figure is right.
No statute signs the minute
8 Del. C. § 142(a) asks one officer to record the proceedings in a book, and § 141(f) files consents with the minutes; attestation is bylaws, practice and contract.
What was checked, and not found
No statute requires a board minute to be approved, signed or attested; two Delaware books-and-records decisions from this year are known at headline level only and are not cited here; and no penalty figure is published on this page.
Build an evidence trail
The paper, the figure it carries and the secretary who circulated it stay together.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Board and committee secretariat
- Minute book
- board portal
- Agendas, papers and consents
Finance and reporting
- Ledger
- reporting system
- Figures and their draw dates
Business units and functions
- Function owners
- shared drives
- Draft papers and their sources
Agent
Board material preparation
- Reads the agenda
- Assembles the pack
- Holds for the secretary
Committees and their members
- Committee charters
- membership
- Confidentiality and access rules
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six tollgates between the model and the secretary
Six tollgates along one road, the last the least forgiving. What arrives is set out in the map below.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether a paper may stand
- L3
- Leaves the circulation to a named person
- L4 – L5
- Keep the paper and the figure behind it
- L6
- Falls back to draft assembly when signals degrade
How Nestack evaluates it
Evaluate the whole assembly — not only the board paper that comes out.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the pack a director reads
- E1Final-output evaluationDid the paper carry the source each figure actually came from?
- E2Step-level evaluationDid the agent read the right committee, the right agenda and the live membership?
- E3Tool evaluationDid it read and write the correct paper and the correct pack version?
- E4Confidence calibrationDo thinly sourced papers actually attract more secretariat corrections?
- E5Slice evaluationHow does performance change across specific committees?
- E6Business outcomeHow many papers needed a correction before the pack went out?
Floor — the record the company answers for
Failure modes
Where each failure originates in the agent
Seven failure modes, each fixed to the stage where it first surfaces.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- LV-03
Stale membership read
The committee list is not the one the charter now names.
Stage gathers
The agendas, the papers, the figures and the dates
02 · Reasoning
2 modes
- LV-04
Figure asserted, not sourced
A figure enters a paper with no system behind it.
- LV-06
Superseded paper read as live
A withdrawn draft is worked as the current one.
Stage proposes
The papers, their figures and completeness
03 · Tool / write
2 modes
- LV-02
Thin paper passed forward
A paper moves on without the secretariat read.
- LV-05
Paper sent beyond the committee
A paper reaches a director outside that committee.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- LV-01
Circulated, source unrecorded
The pack shows a figure but not the system behind it.
Stage returns
The pack a board reads and a demand may reach
05 · Change / Version
1 mode
- LV-07
Silent version drift
A paper is revised while the pack keeps the old one.
Stage tracks
Model, prompt, pack rules and source fields
- Sev-1 · a figure circulated with no source
- Sev-2 · a paper reaches the wrong director
- Sev-3 · source degrades, pack held in draft
Affected slices
Audit Committee papers absorb the corrections
A committee-level source-traceability figure can read clean while Audit Committee papers carry most of the rework. Nestack reports the correction rate by committee, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Audit Committee papers | 10.1% | 3.6× | Review | |
| Remuneration Committee papers | 7.2% | 2.6× | Review | |
| Nomination Committee papers | 4.5% | 1.6× | Watch | |
| Full board papers | 1.6% | 0.6× | Normal |
Bar: correction-rate lift vs. full board paper baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
What an unsourced figure costs
A cycle ends when the unsourced board figure is a standing case. That suite is what the next pack issued is measured against.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Correction rate rises on Audit Committee papers.
- 02
Diagnose
The number in the board pack that nobody could trace back to a system is worked backwards until one cause is left standing.
- 03
Improve
Changes leave numbered, and the papers that forced them travel attached.
- 04
Verify
One paper case still failing is enough to stop the whole release.
- 05
Learn
The case is kept, and the circulation rules are rewritten alongside it.
Learn → Detect
The return edge. The next pack is measured against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, pack assembly, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Circulation-deadline and secretary-boundary work.Week 1
- 02Board, committee and reporting sources.Week 1, Week 2
- 03Figure-to-system and version-coverage mapping.Week 1, Week 2
- 04Draft paper ingestion.Week 2
- 05Figure, source and paper binding.Week 2, Week 3
- 06Completeness scoring and review routing.Week 3
- 07Secretary circulation workflow.Week 3, Week 4
- 08Board-portal integration.Week 5
- 09Sourcing and circulation cases.Week 4, Week 5
- 10Guardrails and secretary controls.Week 4
- 11Paper-trail instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne committee, one cycle | ProductionProduction board workflow | AdvancedMultiple committees / boards |
|---|---|---|---|
| Introduced at Pilot | |||
| Pack assembly to your agenda | ✓ | ✓ | ✓ |
| Corporate Secretary release | ✓ | ✓ | ✓ |
| Standing-agenda baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by committee | — | ✓ | ✓ |
| Secretary sign-off workflow in your systems | — | ✓ | ✓ |
| Approved write-back | — | ✓ | ✓ |
| Source-system integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multi-board groups | — | — | ✓ |
| Cross-committee evidence packs | — | — | ✓ |
| Large paper estates | — | — | ✓ |
| Multi-committee circulation controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, paper volume, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your committees and the members who sit on each
→Committee mapping and paper capture
Week 102Representative board, committee and management papers
→Source binding, version logic and the pack baseline
Week 203Your bylaws and the circulation deadline they fix
→Agenda mapping, source binding and the automation boundary
Week 104Access to relevant APIs, feeds or exports
→Board, reporting and function source assessment, then integration setup
Week 205Packs you would not want disclosed
→Sourcing cases and the evaluation suite
Week 406What no board paper may establish
→Completeness scoring, review routing, guardrails and release controls
Week 307A Corporate Secretary to circulate and record
→Release to the Corporate Secretary, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
No band has been stretched to square the layout; the fifth column simply carries two phases at once.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Board workflow discovery, committee mapping and the automation boundary
W2Source integration and the board-paper baseline
W3Pack assembly, version logic and release controls
W4Evaluation suite, sourcing cases and failure-mode testing
W5Board-portal integration, pilot packs and targeted corrections
W6One board year run under the company secretary, then Agent Care handover
- Reading the band
- Each band is drawn to the work it names, and week five doubles because two phases run together.
- At the end of W6
- When the paper record validates, Agent Care picks the agent up.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Strategy AI agent
Build a board pack agent that carries its sources into the room.
Show us one paper and the system its figures came from. What does Delaware require of a board minute? That one officer record the proceedings in a book, under 8 Del. C. § 142(a) — no signature, no approval, no attestation. The rest is bylaws and contract.
- Typical delivery
- 4–6 weeks
- Deployment
- Your committees
- Bylaws, not law
- Version-bound
- After launch
- Agent Care available
Nestack Agents · Board materials
AGT-CS-04 · Agent Care available after launch
