Automotive AI agent · Vehicle cyber
Vehicle Cybersecurity & Software-Update AI Agent
Assemble the CSMS, SUMS and supply-chain evidence each approval and declaration rests on, track the renewal and filing clocks, and hold the file for the officer who signs it under oath.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Officer signs
- Pre-declaration
- After launch
- Agent Care
What this agent does
Assembles the file, not the signature on it
In
- 01
A component is sourced, and its SBOM, supplier answers and VCS position are pulled onto the model-year file.
- 02
A part number holds while the Wi-Fi module behind it changes, and the file is reopened, not left as filed.
Reason
- 03
A model year opens, and the declaration clock is set to sixty days before its first import or first sale.
- 04
An inaccuracy is discovered, and a sixty-day revised-declaration clock starts against the filing already made.
- 05
A CSMS certificate is issued, and renewal is scheduled from its date of deliverance, not from the audit.
Decide
- 06
An annual report falls due, and SOC and supplier incidents are gathered with the vulnerability record, not after.
- 07
An OTA campaign is staged, and the RXSWIN register is reconciled against it before release, not after.
Out
- 08
A file is assembled, and the evidence, the open gaps and the officer's amendments are held to the model year.
- 09
Execute write actions only inside the approval boundaries agreed during implementation.
Product statement
The agent assembles the file; a duly authorised designee signs the BIS Declaration of Conformity, certifying under 18 U.S.C. 1001.
Example workflow
One component, sourcing to signature
- 1Component record receivedItem master, supplier declaration, SBOM export or engineering release
- 2Evidence assembledSBOMs, HBOMs, supplier answers and prior declarations, each with its named source
- 3Scope and evidence proposedIn-scope position, evidence gaps, clock dates and confidence
- 4Controls appliedCompleteness checks, model-year indexing, three-limb prompts and confidence threshold
No human action required
Stages 1 to 4 run unaided, and nothing is filed at any of them — the agent is assembling, and the officer's lane opens at the confidence gate.
Goes to the cybersecurity officer.
Adds a trade-counsel read first.
Officer approval
The file is held with its evidence, its open gaps and the confidence.
Approve · Amend · Send to counsel review
Approved — released to the signer
- 6Compliance systems updatedOnly where write access and approval policy allow it
- 7Outcome evaluatedAmendment rate, gap closure, authority queries and revised declarations
Amendments
Every officer amendment is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Signing or filing the Declaration of Conformity.
- Certifying a supplier sits outside the three-limb test.
- Declaring the CSMS or SUMS to an Approval Authority.
- Deciding that a discovered change is not material.
Automation boundary
Agent acts unaided
- ✓Assemble the SBOM and HBOM evidence each field calls for for the named owner.
- ✓Carry each supplier answer with the question it answers.
- ✓Track the certificate, model-year and reporting clocks.
- ✓Flag the gaps the officer should weigh, and hold the file for them.
Any write happens inside the boundaries agreed at implementation, never ahead of the signature.
- Reporting new cyber-attacks to the Approval Authority.
- Releasing an OTA campaign to the fleet.
- Deciding an RXSWIN change needs a new approval.
- Changes to scope rules, clocks or filing boundaries.
Example output
One component, annotated
Everything the agent assembles is attached to the record it was drawn from.
Evidence output · single component
Illustrative example- Component
- Telematics modem
- Description
- Cellular modem module, MY2027 telematics unit
- Supplied
- 4 May 2026
- Proposed scope
- VCS hardware, in scope
- Confidence
- 91%
- Supplier answer
- Ownership answered, only
As received
Taken from the item master and the supplier's declaration — nothing on this side is inferred.
Evidence used
- Supplier declaration
- Hardware BOM entry
- Purchase-order record
Why this scope
It is a modem above 450 MHz, so the software carve-outs do not reach it.
What the score decides
Below the configured threshold the file picks up a counsel read before the officer.
Action
ApproveAmendSend to counsel reviewValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every component
From the item master
Assemble against your rules
Draw on the SBOMs and supplier answers on file, and the regulation text in force on the day.
Someone signs under oath
Routine components arrive with their evidence gathered and a scope position proposed.
Send review to the exposed lines
Components with an unanswered limb and low-confidence positions are marked, so the officer's read starts where exposure concentrates.
Build an evidence trail
The component, the supplier answer it rests on and the officer who declared stay on the file.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
PLM and item master
- Teamcenter
- PTC Windchill
- SAP
- Dassault ENOVIA
Software supply chain
- SBOM registries
- CycloneDX
- SPDX
- artefact repositories
Cyber operations
- VSOC
- vulnerability tracking
- Incident and CVE feeds
Agent
Vehicle cyber and SUMS
- Reads the component
- Assembles the file
- Holds for signature
Approval and release
- Type-approval records
- OTA campaigns
- RXSWIN
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six layers between the model and the declaration
Six layers, the innermost nearest the model. What none of them holds is named in the map below.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether a file may stand
- L3
- Puts the release in an officer's hands
- L4 – L5
- Keep the component and the supplier answer behind it
- L6
- Drops to evidence collection when signals degrade
How Nestack evaluates it
Evaluate the evidence workflow — not only the file at the end.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the file the officer signs
- E1Final-output evaluationDid the assembled evidence match what the field actually requires?
- E2Step-level evaluationDid the agent use the right BOM, supplier answer and regulation version?
- E3Tool evaluationDid it read and write the correct component and the correct field?
- E4Confidence calibrationDo low-confidence files actually attract more officer amendments?
- E5Slice evaluationHow does performance change across specific component groups?
- E6Business outcomeHow many files needed an amendment, or a revised declaration after filing?
Floor — the exposure the signer answers for
Failure modes
Where each failure originates in the agent
Seven failure modes, placed at the stage each one originates.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- ZT-03
EU calendar read as GB
A GB type planned against the EU's 7 July 2024 date.
Stage gathers
Item master, SBOMs, supplier answers and clocks
02 · Reasoning
2 modes
- ZT-04
Exclusion misapplied
Software carve-out applied to a hardware item.
- ZT-06
Ownership answer only
A three-limb test closed on a cap-table screen.
Stage proposes
Scope position, gaps, clock dates and confidence
03 · Tool / write
2 modes
- ZT-02
Clock read as a task
Discovery logged, and the sixty-day clock lapses.
- ZT-05
Model-year carry-over
MY2028 imports run against an MY2027 filing.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- ZT-01
Unsupported assertion
A declaration field rests on an unverified supplier reply.
Stage returns
The file the officer signs and BIS receives
05 · Change / Version
1 mode
- ZT-07
Silent scope regression
A rule or model change narrows what is flagged in scope.
Stage tracks
Model, prompt, scope rules and clock config
- Sev-1 · acts outside the filing boundary
- Sev-2 · a wrong field reaches the declaration
- Sev-3 · source degrades, file routes to review
Affected slices
One vehicle type can carry the exposure
A fleet-wide evidence-currency figure can look settled while a small number of vehicle types carry most of the unanswered supply chain. Nestack reports the amendment rate by slice, not only in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Tier-2 substituted parts | 9.3% | 3.7× | Review | |
| Third-country suppliers | 6.4% | 2.6× | Review | |
| Model-year rollovers | 4.5% | 1.8× | Watch | |
| Single-source stock parts | 2.3% | 0.9× | Normal |
Bar: amendment-rate lift vs. single-source-part baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
Every cycle ends by adding a case
A cycle is closed when the unsupported declaration is a case the next release must survive. That suite is what the next file assembled is measured against.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Amendment rate rises in a component slice.
- 02
Diagnose
The module whose firmware nobody upstream would put in writing is read back to a single cause.
- 03
Improve
The change leaves with a version on it and the components that found it attached.
- 04
Verify
While a touched declaration case is unresolved, the release does not open.
- 05
Learn
It is held permanently, and the evidence rules shift with it.
Learn → Detect
The return edge. The next file is assembled against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, evidence workflow, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Compliance workflow discovery and boundary definition.Week 1
- 02Item-master and supplier-portal assessment.Week 1, Week 2
- 03Scope, evidence and reporting-clock rule mapping.Week 1, Week 2
- 04Component-data ingestion and normalisation.Week 2
- 05Evidence assembly and source binding.Week 2, Week 3
- 06Confidence scoring and gap routing.Week 3
- 07Cybersecurity officer approval.Week 3, Week 4
- 08Compliance and PLM system integration.Week 5
- 09Evidence and audit cases.Week 4, Week 5
- 10Guardrails and declaration controls.Week 4
- 11Component-trail instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne vehicle type, one market | ProductionProduction compliance systems | AdvancedMultiple types / authorities |
|---|---|---|---|
| Introduced at Pilot | |||
| Assembly to your parts and rules | ✓ | ✓ | ✓ |
| Officer approval | ✓ | ✓ | ✓ |
| Evidence-currency baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by vehicle type | — | ✓ | ✓ |
| Approval workflow in your systems | — | ✓ | ✓ |
| Approved write-back | — | ✓ | ✓ |
| Supplier-portal integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multiple regimes and calendars | — | — | ✓ |
| Multi-stage compliance approvals | — | — | ✓ |
| High component volume | — | — | ✓ |
| Multi-authority approval controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your item master and component BOMs
→Component-data ingestion and evidence mapping
Week 102Representative declarations already filed
→Evidence baseline and source binding
Week 203Your scope rules and reporting clocks
→Scope, evidence and reporting-clock rule mapping
Week 104Access to relevant APIs, feeds or exports
→Item-master and supplier-portal assessment, then integration setup
Week 205Declarations you would not want sworn
→Supply-chain cases and failure-mode testing
Week 406What no declaration may assert
→Confidence scoring, gap routing, guardrails and declaration controls
Week 307A named cybersecurity officer to approve
→Officer approval workflow, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
Bands are set by the approval calendar, not by the plan, so week 5 carries two phases.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Compliance workflow discovery, rule mapping and the automation boundary
W2Item-master integration and the evidence baseline
W3Evidence workflow, confidence logic and approval controls
W4Evaluation suite, scope and clock checks and failure-mode testing
W5Supplier-portal integration, pilot components and targeted corrections
W6One type approval assembled under the cybersecurity officer, then handover
- Reading the band
- Each band covers only the weeks its work is named in. The week 5 overlap is real, not padding.
- At the end of W6
- Once the approval validates, Agent Care owns the running agent.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Automotive AI agent
Build a vehicle cyber and SUMS agent around your approval calendar.
There is no US analogue to R155 — but under §791.318 a wilful violation reaches criminal exposure for a natural person. Show us your file and the officer who would sign it.
- Typical delivery
- 4–6 weeks
- Deployment
- Your PLM and portals
- Officer approval
- Pre-declaration
- After launch
- Agent Care available
Nestack Agents · Vehicle cyber & SUMS
AGT-AUT-13 · Agent Care available after launch
