Automotive AI agent · Warranty rate
Warranty Retail-Rate & Chargeback-Defence AI Agent
Assemble the qualifying repair orders your state's retail-rate submission rests on, run the manufacturer's response clock to the deemed-approval date, and hold the package for the director who certifies it.
- Typical delivery
- 4–6 weeks
- Deployment
- Your stack
- Director signs
- Pre-submission
- After launch
- Agent Care
What this agent does
Assembles the run, not the certification on it
In
- 01
A repair order closes, and its labour hours, parts cost and pay type are carried onto the qualifying run.
- 02
A repair order carries an oil change beside a real repair, and it is tested on what was done, not on op code.
Reason
- 03
A run is assembled, and the starting repair order, the sequence and each statutory exclusion sit against it.
- 04
A Florida run opens under Fla. Stat. §320.696, where the manufacturer, not the dealer, picks the starting order.
- 05
A submission is transmitted, and the receipt date is captured, because the deemed-approval date runs from it.
Decide
- 06
A response window closes, and the filing is marked approved by operation of law where the statute says so.
- 07
An audit opens, and each line in the auditor's sample is read against that state's audit window first.
Out
- 08
A chargeback lands, and the repair order, the statute it was selected under and the certification stay on file.
- 09
Execute write actions only inside the approval boundaries agreed during implementation.
Product statement
This is not per-claim triage: the agent assembles the rate submission and the post-audit defence, and the fixed-operations director certifies both.
Example workflow
One submission, run to certification
- 1Repair orders receivedDMS repair-order export, parts invoice or accounting extract
- 2Sample assembledLabour hours, parts cost, pay type and close date, each with its named source
- 3Rate proposedEffective labour rate, parts markup, clock dates and confidence
- 4Controls appliedQualifying tests, sequence integrity, lookback and audit windows, and confidence threshold
No human action required
Stages 1 to 4 run unaided, and nothing is submitted at any of them — the agent is assembling, and the director's lane opens at the confidence gate.
Goes to the fixed-operations director.
Adds a franchise-counsel read first.
Director approval
The submission is held with its repair orders, its exclusions and the confidence.
Approve · Amend · Send to counsel review
Approved — released to certify
- 6Warranty systems updatedOnly where write access and approval policy allow it
- 7Outcome evaluatedAmendment rate, exclusion disputes, deemed-approval dates and chargeback outcomes
Amendments
Every director amendment is counted in the evaluation.
What should not run autonomously
Human approval stays in control
Outside the boundary — human approval required
8 items
- Certifying the retail-rate submission to the manufacturer.
- Deciding that a contested repair order stays in the run.
- Conceding a chargeback or agreeing an extrapolation.
- Choosing when, and in which state, to re-declare a rate.
Automation boundary
Agent acts unaided
- ✓Assemble the qualifying run from closed repair orders.
- ✓Carry each inclusion or exclusion with the rule behind it for the named owner.
- ✓Compute the rate and markup, and run the response clock.
- ✓Flag the orders the director should weigh, and hold the run for them.
Any write happens inside the boundaries agreed at implementation, never ahead of certification.
- Signing the dealer's response to an audit finding.
- Settling a chargeback inside the manufacturer's portal.
- Waiving a statutory meeting or response window.
- Changes to qualifying, clock or certification rules.
Example output
One repair order, annotated
Everything the agent assembles is attached to the repair order it was drawn from.
Qualifying output · single repair order
Illustrative example- Repair order
- Customer-pay RO
- Description
- Front strut replacement, customer-paid, two labour lines
- Closed
- 9 May 2026
- Proposed status
- In the qualifying run
- Confidence
- 93%
- Qualifying rule
- Nonwarranty repair, not
As received
Taken from the DMS repair order and the parts invoice — nothing on this side is inferred.
Evidence used
- Closed repair order
- Parts invoice line
- Labour-op record
Why this status
A customer-paid nonwarranty repair, so the maintenance exclusion does not reach it.
What the score decides
Below the configured threshold the run picks up a counsel read before the director.
Action
ApproveAmendSend to counsel reviewValue
Where AI adds value
The same four claims, placed at the point in the workflow where each one applies.
Where the value lands
Value 01 – 04
Every repair order
From the DMS
Assemble against your state
Draw on the closed repair orders on file and the statute in force in that state on the submission date.
Silence can mean approved
Routine orders arrive already tested, with the rate and the markup computed.
Send review to the contested lines
Excluded orders and low-confidence tests are marked first, because manufacturers carrying record warranty cost audit harder.
Build an evidence trail
The repair order, the statute it was selected under and the manager who certified stay on the submission.
Integrations
Typical integrations
Five system groups connect to the same agent. Which of them are in scope is decided in discovery.
Dealer management systems
- CDK Global
- Reynolds
- Tekion
- Dealertrack
- PBS
Warranty systems
- OEM warranty portals
- Claim-submission platforms
Parts and accounting
- Parts inventory
- invoices
- General ledger
- schedules
Agent
Warranty rate and chargeback
- Reads the order
- Assembles the run
- Holds for certification
Documents and audit
- Document imaging
- DMS
- Audit portals
- schedules
Observability & evaluation
- OpenTelemetry
- Langfuse
- Supported monitoring/evaluation sources
Integration availability depends on the client's existing systems and API access.
Agent controls
Six layers between the model and the submission
The controls narrow inward through six stages. What emerges uncaught is set out in the map below.
L6 · Outermost — last line of defence
Inward → L1 · closest to the model
- L1 – L2
- Test whether a run may stand
- L3
- Puts the release in a director's hands
- L4 – L5
- Keep the repair order and the statute behind it
- L6
- Falls back to submission tracking when signals degrade
How Nestack evaluates it
Evaluate the submission workflow — not only the rate at the end.
Coverage runs the whole depth of the workflow, and every layer is cut by slice.
Surface — the rate the manufacturer sees
- E1Final-output evaluationDid each repair order in the run pass that state's qualifying test?
- E2Step-level evaluationDid the agent use the right orders, statute version and lookback window?
- E3Tool evaluationDid it read and write the correct repair order and the correct field?
- E4Confidence calibrationDo low-confidence runs actually attract more director amendments?
- E5Slice evaluationHow does performance change across specific franchise groups?
- E6Business outcomeHow many submissions needed an amendment, or a defence after audit?
Floor — the money the dealer answers for
Failure modes
Where each failure originates in the agent
Seven failure modes, placed at the stage each one originates.
Agent lifecycle
Direction of processing →
01 · Retrieval
1 mode
- WR-03
Wrong pay-type filter
Internal and warranty lines pulled in as customer-pay.
Stage gathers
Repair orders, parts invoices, statutes and clocks
02 · Reasoning
2 modes
- WR-04
National sample rule
A Florida run built on the dealer-selected model.
- WR-06
Exclusion by op code
A whole multi-line order dropped for one maintenance line.
Stage proposes
Effective rate, markup, clock dates and confidence
03 · Tool / write
2 modes
- WR-02
Silence read as refusal
A run clock lapses and the filing is abandoned.
- WR-05
Rate re-declared twice
A second filing lands where the state allows one.
Stage writes
Only where write access and approval policy allow it
04 · Output
1 mode
- WR-01
Reconstruction mismatch
Audit file rebuilt from current DMS state, not the record.
Stage returns
The submission and defence the manufacturer receives
05 · Change / Version
1 mode
- WR-07
Silent rule regression
A model or rule change widens what counts as qualifying.
Stage tracks
Model, prompt, qualifying rules and clock config
- Sev-1 · acts outside the filing boundary
- Sev-2 · a bad order reaches the submission
- Sev-3 · source degrades, run routes to review
Affected slices
One franchise can carry the exposure
A blended approved rate across the group hides the franchises that absorb the amendments and the chargebacks — and no public dealer-side chargeback rate exists to benchmark against. Nestack reports by slice, not in total.
Slice performance — reported separately, not only in aggregate
Illustrative example| Slice | Failure rate | Lift | Lift vs. threshold | Status |
|---|---|---|---|---|
| Multi-line repair orders | 6.6% | 3.6× | Review | |
| Manufacturer-selected samples | 4.4% | 2.4× | Review | |
| Parts-markup runs | 3.1% | 1.7× | Watch | |
| Single-line customer-pay orders | 1.6% | 0.9× | Normal |
Bar: amendment-rate lift vs. single-line-order baseline · scale 0–4.0× · tick marks the 2.0× review threshold
2 of 4 slices over threshold
Evidence-linked improvement
Every cycle ends by adding a case
A cycle ends when the abandoned submission is a case the next release has to catch. That suite is what the next rate filed is measured against.
Improvement cycle · five stages
Switchback — the path turns at Improve and returns at Learn
- 01
Detect
Amendment rate rises in a franchise slice.
- 02
Diagnose
The rate filing that was abandoned on day thirty-one is read back to a single cause.
- 03
Improve
Number the correction, and keep the submissions that surfaced it fastened to it.
- 04
Verify
The touched cases go round once more, and one failure keeps the release where it is.
- 05
Learn
It becomes a fixture of the suite, and the state rules follow it.
Learn → Detect
The return edge. The next rate is filed against a suite one case longer.
Typical build scope
Twelve workstreams across six weeks
The build scope read against the delivery timeline. Week structure follows the six-week plan — discovery, sources, submission workflow, evaluation, integration, then production validation and handover.
Workstream
Week 1Week 2Week 3Week 4Week 5Week 6
- 01Warranty workflow discovery and boundary definition.Week 1
- 02DMS and warranty-portal assessment.Week 1, Week 2
- 03Qualifying, clock and certification rule mapping.Week 1, Week 2
- 04Repair-order ingestion and normalisation.Week 2
- 05Run assembly and source binding.Week 2, Week 3
- 06Confidence scoring and exclusion routing.Week 3
- 07Fixed-operations director approval.Week 3, Week 4
- 08DMS and warranty-system integration.Week 5
- 09Qualifying and clock cases.Week 4, Week 5
- 10Guardrails and certification controls.Week 4
- 11Order-trail instrumentation.Week 5, Week 6
- 12Deployment, documentation and Agent Care handover.Week 6
12 workstreams · 6 weeks · bar shows the weeks a workstream is active — several run in parallel
Final scope and sequence confirmed in discovery
Engagement tiers
What each tier includes
Rows are the capabilities named in each tier's scope. Higher tiers include everything below them.
| Capability✓ in scope · — not at this tier | PilotOne franchise, one state | ProductionProduction warranty systems | AdvancedMultiple franchises / states |
|---|---|---|---|
| Introduced at Pilot | |||
| Assembly to your orders and rules | ✓ | ✓ | ✓ |
| Director approval | ✓ | ✓ | ✓ |
| Qualifying-selection baseline | ✓ | ✓ | ✓ |
| Introduced at Production | |||
| Reporting by franchise | — | ✓ | ✓ |
| Approval workflow in your systems | — | ✓ | ✓ |
| Approved write-back | — | ✓ | ✓ |
| DMS repair-order integration | — | ✓ | ✓ |
| Introduced at Advanced | |||
| Multiple state regimes and clocks | — | — | ✓ |
| Multi-stage dealer approvals | — | — | ✓ |
| High repair-order volume | — | — | ✓ |
| Multi-franchise rate controls | — | — | ✓ |
| Build price | From $5,000 | From $8,000 | Custom quote |
- Final build price
- Confirmed after discovery based on integrations, workflow complexity, transaction volume, approval controls and deployment requirements.
- Separate from build
- Build pricing is separate from recurring Agent Care, which covers managed monitoring, evaluations, incidents and verified improvements after launch.
What we need from you
What you bring, and what we build with it
Each input maps to a piece of build scope and a week in the delivery timeline.
You bring
We build with it
01Your repair-order and parts data
→Repair-order ingestion and evidence mapping
Week 102Representative submissions already filed
→Qualifying baseline and source binding
Week 203Your state rules and submission clocks
→Qualifying, clock and certification rule mapping
Week 104Access to relevant APIs, feeds or exports
→DMS and warranty-portal assessment, then integration setup
Week 205Submissions you would not want certified
→Chargeback cases and the evaluation suite
Week 406What no submission may include
→Confidence scoring, exclusion routing, guardrails and certification controls
Week 307A named fixed-operations director to approve
→Director approval workflow, then pilot and production validation
Weeks 5–6
Nothing else is required
Deployment, documentation and Agent Care handover are ours.
Delivery timeline
Four phases across six weeks
The weeks are drawn from the submission calendar, so the fifth carries evaluation and the pilot.
Phase
W1
W2
W3
W4
W5
W6
- DiscoveryW1
- BuildW2 – W3
- EvaluateW4 – W5
- Pilot & LaunchW5 – W6
Week focus
W1Warranty workflow discovery, rule mapping and the automation boundary
W2DMS integration and the qualifying baseline
W3Submission workflow, confidence logic and approval controls
W4Evaluation suite, qualifying and clock checks and failure-mode testing
W5Warranty-portal integration, pilot submissions and targeted corrections
W6One submission cycle run under the service director, then Agent Care handover
- Reading the band
- Each band covers only the weeks its work is named in. The week 5 overlap is real, not padding.
- At the end of W6
- Validation closes on live submissions, and Agent Care takes over monitoring.
- Duration
- Six-week plan shown · typical delivery 4–6 weeks depending on scope confirmed in discovery.
Next step · Automotive AI agent
Build a warranty rate and chargeback agent around your submission calendar.
New Hampshire's RSA 357-C:5 and Minnesota's §80E.041 subd. 2(c) both say a declared rate drawing no timely disapproval takes effect. Bring us one abandoned submission and the director who would certify the next.
- Typical delivery
- 4–6 weeks
- Deployment
- Your DMS and portals
- Director signs
- Pre-submission
- After launch
- Agent Care available
Nestack Agents · Warranty rate & chargeback
AGT-AUT-14 · Agent Care available after launch
